BRR : 10445945
Tender Brief : 1 Construction Of 60000Lit Oht At Muthurajapalayam Village In Pillapalayam Panchayat. Earth Work Excavation And Depositingon Bank With Alllead And Lift In Allclasses Of Soilsuch Ashard Stiff Claystiff Black Cottonhard Red Earth Shales Murrams, Hard Gravellyetc Except Sand And Rock Requiring Blasting Allincidental Charges Etc Complete For Box Cutting / Foundation Asper Ss 20B 2 Second Depth2.00 M -Below 3 Sand Filling For Foundation With Clear River Sand Including Cost Of Sand Watering, Ramming And Consolidationetc Complete. 4 Cementconcrete1:4:8 ( One Cement Four Sand And Eight Aggr... Read More
Tender Value
₹
19,25,000
Submission Date
20-04-2023
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 16,75,620.64 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 16,68,470.06 | L1 |
Work Detail
1 construction of 60000lit oht at muthurajapalayam village in pillapalayam panchayat. earth work excavation and depositingon bank with alllead and lift in allclasses of soilsuch ashard stiff claystiff black cottonhard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting allincidental charges etc complete for box cutting / foundation asper ss 20b 2 second depth2.00 m -below 3 sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidationetc complete. 4 cementconcrete1:4:8 ( one cement four sand and eight aggregates ) using 40mm hbgs for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. 5 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by twad board officers. 6 supplying, fabricating and placing in position of hsd steel rods for reinforcement including the cost of steel and binding wire etc., complete. 7 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete 8 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 9 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 10 earthworkexcavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by twad board officers. hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixedwith smallsize boulders for foundation ss 20b 11 cementconcrete1:4:8 ( one cement four sand and eight aggregates ) using 40mm hbgs for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by twad board officers. 12 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 13 supplying, fabricating and placing in position of hsd steel rods for reinforcement including the cost of steel and binding wire etc., complete 14 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 15 refilling the foundation with excavated earth including watering and consolidation etc., complete. 16 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 17 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 18 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 19 supplying, fabricating and placing in position of hsd steel rods for reinforcement including the cost of steel and binding wire etc., complete 20 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 21 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 22 sq.col.cent. rate ( 3.30 - 4.30 ) 23 sq.col.cent. rate ( 4.30 - 5.30 ) 24 sq.col.cent. rate ( 5.30 - 5.75 ) 25 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 26 square column ( 4.50 - 5.75 ) 27 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 28 supplying, fabricating and placing in position of hsd steel rods for reinforcement including the cost of steel and binding wire etc., complete 29 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 30 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 31 square column ( 6.30 - 7.30 ) 32 square column ( 7.30 - 8.30 ) 33 square column ( 8.30 - 8.85 ) 34 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 35 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 36 supplying, fabricating and placing in position of hsd steel rods for reinforcement including the cost of steel and binding wire etc., complete 37 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 38 third brace beam ( 9.00 - 9.30 ) 39 landing beam projection ( 8.85 - 9.00 ) 40 third brace beam ( 9.00-9.30 ) 41 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 42 square column ( 9.30 - 10.30 ) 43 square column ( 10.30 - 11.14 ) 44 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 45 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 46 centering rate plain surface ( 11.30 - 11.59 ) 47 centering rate plain surface ( 11.14 - 11.30 ) 48 centering rate plain surface ( 11.30 - 11.59 ) 49 centering rate ( 11.59-11.59 ) 50 curv. surface cent. rate ( 0.00 - 3.30 ) 51 supplying, fabricating and placing in position of hsd steel rods for reinforcement including the cost of steel and binding wire etc., complete 52 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 53 floor / grid beam and floor slab laidsupplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 54 curv. surface. cent. rate ( 0.00-3.30 ) 55 curv. surface. cent. rate ( 0.00-3.30 ) 56 curv. surface. cent. rate ( 0.00-3.30 ) 57 curv. surface. cent. rate ( 3.30-4.30 ) 58 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 59 rcc rate ( 13.50 - 15.30 ) 60 supplying and erecting steel centering for sides and soffits i including necessary supports and shuttering to the required height for rcc items using ms sheets of suitable size of bg.10 stiffeneq with welded ms angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. 61 curverd sur. cent. rate ( 3.30 -4.30 ) 62 supplying, fabricating and placing in position of hsd steel rods for reinforcement including the cost of steel and binding wire etc., complete 63 rcc in m30 grade using graded aggregtes of hbgs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete. 64 providing pvc ventilating arrangements mosquito proof nylon net with 110 mm pvc pipes and cowl etc., complete., 65 providing manhole cover of size 0.60 m x 0.60 m in rcc 1: 1.5:3 with suitable reinforcement and 5o x 5o x 6mm ms angle fixed along edges etc., complete., 66 providing and fixing of rcc inner access ladder in rcc 1:1.5:3 ( one cement, one and half sane! and three aggregates ) using 20mm hbg stone for oht including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4scm consisting of two nos. of ve~ical post of 10cm x lscm and step slab of 25mm x 25mm etc., complete. 67 fabrication, supply, delivery and fixing of outside ms ladder of 45cm clear wide made out of 50 mm x 50 mm x 60 mm ms angle for both sides and for steps at 30 cm c / c welded jointed etc., for i staging from gl to fst level brace ( weight 4.5kg / m ) iind and iiird staging upto floor slab and ivth staging from floor slab to roof top.supply, delivery and fixing of 32 mm gi pipes medium for hand rails from i stage to ivth stage.rcc m30 grade mix for landing slab 5 nos. at ground level - 1 no. and abouve ground level - 4 nos.supply and fixing of 32 mm gi pipe medium for hand rails for the landing slab.supplying and fixing of ms base plate of 100 mm x 100mm x 6 mm thick for fixing anchore fastener bolt for fixing of hand rails at landing slab and ms ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved type design and as directed by twad board officers. 68 providing cut stone slab in cm 1:3 etc., complete., ( .45x.45x.15 ) 69 exterior emulsion painttwocoats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the reservoir including cleaning, preparing the surface and curing etc., complete. 70 65mm dia gi pipes for over flow and rwh 71 65mm dia gi pipes for delivery pipe. 72 50mm dia gi pipes for scour pipe. 73 90mm dia pvc threaded coupler 74 63mm dia pvc threaded coupler 75 65mm dia gi tee 76 65mm dia 90 deg. bend 77 65mm dia gi bend ( short ) 78 65mm dia gi coupler 79 65mm dia gi union 80 65mm dia gi elbow 81 50mm dia gi union 82 50mm dia gi elbow 83 65mm dia gi tee 84 65 x 50mm dia gi reducer 85 75 x 63mm dia pvc reducer 86 75 x 90 mm dia pvc reducer 87 65mm dia gm gate valve 88 50mm dia gm gate valve 89 75mm pvc threaded coupler 90 provision for name board 91 provision for photo charges 92 gst amount for providing service to government contract works for the above construction works. { gst amount is the total gst amount for total overall quoted amount above this row in column bb for all works in this package }
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results