BRR : 10437398
Tender Brief : Replacement Of Various Equipment To Attend The Emergency Brekdown At Various Sub Stations During The Period Of One Year Under Etd Bareilly - 1 Replacement Of Various 220Kv, 132Kv And 33Kv Equipments Under Etd, Bareilly Along With Other Associated Works During The Period Of 1 Year With All Due Care Of Safety & Precautions, With All Cost Of Men, Misc. Consumables, T&Ps Etc. Required For Satisfactory Completion Of The Work As Per Technical Specifications & Direction Of The Supervising Engineer: 2 Replacement Of Defective / Damaged 33Kv Vcb Installed At 220Kv S / S C.B. Ganj, 132Kv S / S B... Read More
Tender Value
₹
2,00,000
Submission Date
09-02-2021
Participated Bidder List
6 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,86,970 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 1,89,760 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 2,18,500 | L6 | |||
| 4 | cnet-technologies | Bid Analytics | 1,94,160 | L4 | |||
| 5 | cnet-technologies | Bid Analytics | 1,87,316 | L2 | |||
| 6 | cnet-technologies | Bid Analytics | 2,02,330 | L5 |
Work Detail
replacement of various equipment to attend the emergency brekdown at various sub stations during the period of one year under etd bareilly - 1 replacement of various 220kv, 132kv and 33kv equipments under etd, bareilly along with other associated works during the period of 1 year with all due care of safety & precautions, with all cost of men, misc. consumables, t&ps etc. required for satisfactory completion of the work as per technical specifications & direction of the supervising engineer: 2 replacement of defective / damaged 33kv vcb installed at 220kv s / s c.b. ganj, 132kv s / s baeilly town, 132kv bareilly-ii ( balipur ) , 132kv s / s faridpur &132kv s / s richha. 3 dismantling of 33kv damaged / defective vcb including shifting of dismantled vcb from switch yard to storage place / store room. n 4 modification of 33kv vcb foundation as per site requirement / as per manufacturing drawing or as per direction of supervising engineer and shifting of earthing & both side jumper. n 5 erection of new 33kv vcb in proper alignment and cable termination of circuit breaker as per logic for tripping / closing / spring charging / indication / supervision ckt with proper ferruling and checking out of breaker operation from local / remote, including earthing and connection of both side jumpers and works related to complete the erection work. all required t&p, skilled labours, crane / hydra etc. shall be arranged by the contractor at his own cost. n 6 replacement of 220kv ct / cvt / pt / la with all cost of required t&p, skilled labours, crane / hydra etc. shall be arranged by the contractor at his own cost as per details below:- 7 dismantling of 220 kv ct / cvt / pt after opening of its both side jumpers, earthing, cable terminations etc. including shifting of dismantled material from site to store. n 8 erection of new 220 kv ct / cvt / pt / including shifting of new 220kv ct / cvt / pt from store to site. the works also includes jumpering from both side, earthing and cable termination. n 9 dismantling of 220 kv la after opening of its jumpers, earthing including shifting of dismantled material from site to store. n 10 erection of new 220 kv la including shifting of new 220 kv la from store to site. the works also includes jumpering from both side, earthling and cable termination, n 11 dismantling of 220 kv pi including shifting of dismantled pis from site to store. n 12 erection of 220 kv pi including shifting of new pis from store to site. n 13 replacement of 132kv ct / pt / la with all cost of required t&p, skilled labours, crane / hydra etc. shall be arranged by the contractor at his own cost as per details below:- 14 dismantling of 132 kv ct / pt after opening of its both side jumpers earthing cable terminations etc. including shifting of dismantled material from site to store. n 15 erection of new 132 kv ct / pt including shifting of new 132kv ct / pt from store to site. the works also includes jumpering from both side, earthing and cable termination, n 16 dismantling of 132 kv la after opening of its both side jumpers earthing cable terminations etc. including shifting of dismantled material from site to store. n 17 erection of new 132 kv la including shifting of new 132kv la from store to site. the works also includes jumpering from both side, earthing and cable termination, n 18 dismantling of control panels / line protection panel / transformer control and relay panel by opening of all the associated control cable termination and earthing & trip. shifting of dismantled panel to store. the work also includes erection of required panels, earthing of panel and all the associated cable terminations and shifting of new control panel from store to site and other associated work. n
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results