BRR : 10322569
Click Here To View Tendering Authority. Price Bid City/State :  Meerut, Uttar Pradesh
Tender Brief : Tender For Construction Of Main Gate In Composite School - Earth work in excavation in foundation in ordinary soil. S.I. No 251 (a) 3 Concrete4 with 4 c.m. gauge brick ballast, f. sand of 1:25 F.M. and Cement, in proportion of 12:6:1 om foundation and under floors including supply of all materials labour tools & plants etc. required for proper completion of the work. S.I. - 273 4 R.C.C. (1:2:4) excluding steel but for footing. S.I. - 287 5 R.C.C. (1:.5:3) in column & beam excluding steel. S.I. - 289 6 M-150 Brick work in 1:4 cement & f. sand mortar in foundation and plinth including suppl... Read More
Tender Value
1,62,000
Submission Date
15-04-2025
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 1,63,863 L3
2 cnet-technologies Bid Analytics 1,61,983.8 L2
3 cnet-technologies Bid Analytics 1,61,838 L1
Work Detail
tender for construction of main gate in composite school - earth work in excavation in foundation in ordinary soil. s.i. no 251 (a) 3 concrete4 with 4 c.m. gauge brick ballast, f. sand of 1:25 f.m. and cement, in proportion of 12:6:1 om foundation and under floors including supply of all materials labour tools & plants etc. required for proper completion of the work. s.i. - 273 4 r.c.c. (1:2:4) excluding steel but for footing. s.i. - 287 5 r.c.c. (1:.5:3) in column & beam excluding steel. s.i. - 289 6 m-150 brick work in 1:4 cement & f. sand mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work. s.i. - 305 7 m-150 brick work in 1:4 cement & f.sand mortar in super structure including supply of all materials labour, tools & plants etc. required for paper completion of the work. s.i.-305+309+310 8 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all materals labour t&p etc. s.i. - 584 9 cement conc. 1:2:4 with cement, c.sand &stone grit. s.i. - 279(a) 10 mild steel iron work for reinforcement in r.c.c. work. s.i. - 504 11 finishing wall with water proof cement paint app. quality of paint with two coat including supply of all material, labour, t&p etc. s.i. - 660+661 12 s/f of m.s. gate heavy size including supply of all material. labour, t&p etc. 13 gst @ 18% 14 details are 15 roundoff
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 042242bd-835c-4f6a-98a1-7df0d7ee73de financialevaluation notice
Download boqcomparativechart boq document
Download finance_1845089 aoc document
Download finsummary_1845089 aoc document
Download File Name File Description
Download Tendernotice_1 Tender Documents
Download Tendernotice_2 Tender Documents
Download defbabd2-6da0-42f7-b7a7-1fba7267e0a9 Tender Documents
Download BOQ_1845089 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders