BRR : 10328964
Tender Brief : Tender For Construction Work Of Children Park Mohalla Ansariyan - Dewatering of pond 2 Desilting of pond in or under liquid mud & disposal of silt 1 km from site.S.I-252(a)(i)1+261(b)+231(a) 5 km 3 Earth work in excavation in foundation in ordinary soil. S.I. No. 251(a)(4x3) 4 E/W in filling in ordinary soil by carted earth beyond 8kms extra lead from site. 5 Concrete with 4c.m. gauge brick ballast, c. sand of 1:25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour Tools & plants etc. required for proper completion of the work.... Read More
Tender Value
₹
1,76,00,000
Submission Date
24-05-2025
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,47,48,220.54 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | 1,47,33,472.32 | L2 | |||
| 3 | cnet-technologies | Bid Analytics | 1,46,89,227.66 | L1 |
Work Detail
tender for construction work of children park mohalla ansariyan - dewatering of pond 2 desilting of pond in or under liquid mud & disposal of silt 1 km from site.s.i-252(a)(i)1+261(b)+231(a) 5 km 3 earth work in excavation in foundation in ordinary soil. s.i. no. 251(a)(4x3) 4 e/w in filling in ordinary soil by carted earth beyond 8kms extra lead from site. 5 concrete with 4c.m. gauge brick ballast, c. sand of 1:25 f.m. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour tools & plants etc. required for proper completion of the work.(s.i - 273) 6 r.c.c. (1:1.5:3) excluding steel but for footing.s.i-287a 7 r.c.c. (1:1.5:3) in columns & beam excluding steel.s.i-289 8 m-150brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work. s.i-305 9 m-150brick work in 1:4cement & f.sand mortar in super structure including supply of all materials labour, tools & plants etc. required for proper completion of the work.s.i-305+309+310 10 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.si 584 11 r.c.c. (1:1.5:3) excluding steel but for slab.s.i-284a 12 cement conc. 1:1.5:3 with cement,c.sand & stone grit .s.i-ch. no.20 new item 9(1) 13 mild steel iron work for reinforcement in r.c.c work. s.i-504 14 earth work in excavation in foundation in ordinary soil. s.i. no. 251(a) 15 concrete with 4c.m. gauge brick ballast, c. sand of 1:25 f.m. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour tools & plants etc. required for proper completion of the work.(s.i - 273) 16 r.c.c. (1:1.5:3) excluding steel but for footing.s.i-287a 17 r.c.c. (1:1.5:3) in columns & beam excluding steel.s.i-289 18 m-150brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work. s.i-305 19 m-150brick work in 1:4cement &f.sand mortar in super structure including supply of all materials labour, tools & plants etc. required for proper completion of the work.s.i-305+309+310 20 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.si 584 21 r.c.c. (1:1.5:3) excluding steel but for slab.s.i-284a 22 cement conc. 1:1.5:3 with cement,c.sand & stone grit. s.i-ch. no.20 new item 9(1) 23 mild steel iron work for reinforcement in r.c.c work. s.i-504 24 earth work in excavation in foundation in ordinary soil. s.i. no. 251(a) 25 concrete with 4c.m. gauge brick ballast, c. sand of 1:25 f.m. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour tools & plants etc. required for proper completion of the work.(s.i - 273) 26 r.c.c. (1:1.5:3) excluding steel but for footing.s.i-287a 27 r.c.c. (1:1.5:3) in columns & beam excluding steel.s.i-289 28 m-150brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work. s.i-305 29 m-150brick work in 1:4cement & f.sand mortar in super structure including supply of all materials labour, tools & plants etc. required for proper completion of the work.s.i-305+309+310 30 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.si 584 31 r.c.c. (1:1.5:3) excluding steel but for slab.s.i-284a 32 cement conc. 1:1.5:3 with cement,c.sand & stone grit .s.i-ch. no.20 new item 9(1) 33 mild steel iron work for reinforcement in r.c.c work. s.i-504 34 earth work in excavation in foundation in ordinary soil. s.i. no. 251(a)(4x3) 35 concrete with 4c.m. gauge brick ballast, c. sand of 1:25 f.m. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour tools & plants etc. required for proper completion of the work.(s.i - 273) 36 r.c.c. (1:1.5:3) excluding steel but for footing.s.i-287a 37 r.c.c. (1:1.5:3) in columns & beam excluding steel.s.i-289 38 m-150brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work. s.i-305 39 m-150brick work in 1:4cement & f.sand mortar in super structure including supply of all materials labour, tools & plants etc. required for proper completion of the work.s.i-305+309+310 40 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.si 584 41 r.c.c. (1:1.5:3) excluding steel but for slab.s.i-284a 42 cement conc. 1:1.5:3 with cement,c.sand & stone grit .s.i-ch. no.20 new item 9(1) 43 mild steel iron work for reinforcement in r.c.c work. s.i-504 44 supply and fixing of kota stone in floor ing 25 mm thick and joint filled with 1:2 cement and coarse sand with approved colouring materials to be given an even shade with 12 mm base coat (bedding) of 1:2 cement & coarse sand morter and polished by hand or machine and finally finished with french manson polish or other approved polishincluding supply of all materials, labour,tools & plants etc. required for proper completion of the work. 45 providing & applying of wall putty with two coat app. quality of paint including supply of all materals labour t&p etc. 46 finishing wall weather coat paint with two coat app. quality of paint including supply of all materals labour t&p etc 47 m.s iron work in heavy sizes such as built up gate railing ,doors frames including cutting welding and wastage including supply of all material,labour,t&petc. required for proper completion of work.s.i-503 48 providing laying spreading and compaction stone aggregates of 22.4-53mm size to water bond macadam specification including spreading in uniform thikness hand packing rooling with 3 wheeled 8-10 tonne roller in stages to proper grade and camber approved complete.(as per analysis) 49 supply of 80mm thick precast cement concerete i-shape interlocking paver blocks isi markconfirming to is: 15658-2006 with top layer of minimum 5 mm thicknesshaving plan dimension 200x(160+120mm) of o.p. cement , smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 40mpaand weigt 4.5kg perincluding cost of material, with a blanket layer of 4.00cm. thick fine sand. includinglabour, t & petc required for proper completion of the work as directed by engineer-in-charge.s.i-ch.20 new item 14 50 extra charge for colour tiles difference.s.i-ch.20 new item 11=17.30-15.50=1.8x35=63 51 electricity 52 earth work in excavation in foundation in ordinary soil. s.i. no. 251(a)(4x3) 53 concrete with 4c.m. gauge brick ballast, c. sand of 1:25 f.m. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour tools & plants etc. required for proper completion of the work.(s.i - 273) 54 r.c.c. (1:1.5:3) excluding steel but for footing.s.i-287a 55 r.c.c. (1:1.5:3) in columns & beam excluding steel.s.i-289 56 m-150brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work. s.i-305 57 m-150brick work in 1:4cement & f.sand mortar in super structure including supply of all materials labour, tools & plants etc. required for proper completion of the work.s.i-305+309+310 58 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.si 584 59 r.c.c. (1:1.5:3) excluding steel but for slab.s.i-284a 60 cement conc. 1:1.5:3 with cement,c.sand & stone grit .s.i-ch. no.20 new item 9(1) 61 mild steel iron work for reinforcement in r.c.c work. s.i-504 62 supply and fixing of kota stone in floor ing 25 mm thick and joint filled with 1:2 cement and coarse sand with approved colouring materials to be given an even shade with 12 mm base coat (bedding) of 1:2 cement & coarse sand morter and polished by hand or machine and finally finished with french manson polish or other approved polishincluding supply of all materials, labour,tools & plants etc. required for proper completion of the work. 63 providing & applying of wall putty with two coat app. quality of paint including supply of all materals labour t&p etc. 64 finishing wall weather coat paint with two coat app. quality of paint including supply of all materals labour t&p etc. 65 m.s iron work in heavy sizes such as built up gate railing ,doors frames including cutting welding and wastage including supply of all material,labour,t&petc. required for proper completion of work.s.i-503 66 providing laying spreading and compaction stone aggregates of 22.4-53mm size to water bond macadam specification including spreading in uniform thikness hand packing rooling with 3 wheeled 8-10 tonne roller in stages to proper grade and camber approved complete.(as per analysis) 67 supply of 80mm thick precast cement concerete i-shape interlocking paver blocks isi markconfirming to is: 15658-2006 with top layer of minimum 5 mm thicknesshaving plan dimension 200x(160+120mm) of o.p. cement , smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 40mpaand weigt 4.5kg perincluding cost of material, with a blanket layer of 4.00cm. thick fine sand. includinglabour, t & petc required for proper completion of the work as directed by engineer-in-charge.s.i-ch.20 new item 14 68 extra charge for colour tiles difference.s.i-ch.20 new item11=17.30-15.50=1.8x35=63 69 rainwater harvesting
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results