renewal of hauling carriage rail in bd the work involves renewal of 130 m length hauling carriage rail and accessories at bd
maintenance of railway track and attendance in emergency work during derailment at clw yard & workshop and link track to rnpr
aden/sakleshpur sub division:- greasing of rails in curves with railways grease between sakaleshpur-subramanya road stations for a period of one year.
through sleeper renewal (p) work with pqrs in tdl-gzb section under sr.den/v/pryj.
deepscreening of turnout & turnout renewal in tdl-aljn section under aden/t/tdl.
miscellaneous p-way works like boxing & pre and post tamping, jungle clearance and deep screening and packing of turnout etc., and white washing, distempering, plastic emulsion, aluminum paint to service building and staff quarters etc and other connected works under the jurisdiction of assistant divisional engineer/track/ waltair.
aden-rpz sub division : provision of "a" class art at udaipurcity (for art line udaipurcity station track work).
reconditioning of worn out 1 in 12 & 1 in 8.5 crossing body, switches etc. under the jurisdiction of den/iii/kir for 18 months.
providing 60 m. ton capacity additional gantry crane (moving) on existing rail track of main spillway, replacement of 20 m. ton capacity gantry crane with replacement of existing rail track of h.r. spillway and replacement of passenger elevator by dismantling old for gallery inspection ar block no. 9 on main spillway at - ukai dam site.
construction of railway under pass at approach road samerpura on jhansi-agra section
tender for awarding of exclusive train wrapping rights of nagpur metro trains on reach—i and/or reach - 3 of nagpur metro rail project for a period of 03 years.-corrigendum
biennial rate contract for maintenance of railway track for g.s.e.c.l railway siding from sevalia to w.t.p.s. for the year 2020-2022.
supply , installation , testing and commissioning of standard gauge track work ( ballasted , embedded and column lines ) at new isbt depot for patna metro rail project for pmrcl .
kanpur –tundla: through sleeper renewal (primary) of 40 km with pqrs in rrh-tdl section under sr.den/iv/pryj.
1. removal of dfwr in the section of aden/w/gkp and aden/east/gd 52 kg -342 nos. +60 kg -228 nos total=570nos. 2.baruachak - kathola(h) - removal of dfwr welds under juridiction of sse/p-way/gd at km 644/0-668/0 (52 kg-197 nos.+ 60 kg- 198 nos. total = 395 nos. dwfr )
bcm work & other ancillary works under den/2/hwh
kanpur -tundla: through sleeper renewal (primary) of 40 km with pqrs in rrh-tdl section under sr.den/iv/pryj.
ahmedabad- mehsana, khodiyar -gandhinagar-kalol: deep screening of plain track and turn out,through fitting renewal (tfr) ,through turn out renewal (ttr) and associated work in the jurisdiction of sr. den (south) ahmedabad.
geratpur-ahmedabad-mehsana & ahmedabad- chandlodiya- khodiyar :complete track renewal (ctr),through turn out renewal (ttr), deep screening of plain track & turn out , casual renewal of sleepers and associated work in the jurisdiction of sr. den (south) ahmedabad.
strengthening/restoration of rail tracks at z-iv,vi & vii area.”
lowering, carrying, laying&fitting and packing double track line in kenda composite (top) seam of kunustoria colliery.
miscellaneous track maintenance work of railway yard inside rcf thal factory area for the years 2021-22 and 2022-23
kanpur -tundla: through sleeper renewal (primary) of 40 km with pqrs in rrh-tdl section under sr.den/iv/pryj.
composite works (civil, electrical, mechanical) involving construction of industrial sheds, other ancillary buildings, track works, drainage system, landscaping, electrification and illumination works, procurement and commissioning of specified mechanical machineries & plant (eot cranes etc) in connection with augmentation of facility for poh of lhb coaches, phase-i at crws bhopal (mp)
construction of rail fencing & ballast wall total 7740m at bt-bnj section at km41/1 to 42/2 both up & dn track, at bt-bnj seection at km-44/25 to 46/1 beside up track & at bnj-rha section at km-31/1 to 32/5 both side of single line up & dn track near railway track under senior section engineer/works/bongaon in the jurisdiction of assistant engineer/barasat.
composite works ( civil, electrical, mechanical ) involving construction of industrial sheds, other ancillary buildings, track works, water supply system, drainage system, road works, landscaping, electrification and illumination works, procurement and commissioning of specified mechanical machineries & plant ( eot cranes etc ) in connection with ( i ) setting up of maintenance infrastructures for poh of lhb ( ac & non ac ) and icf ac coaches ( ii ) creation of facilities of...
construction of lhs (by open cut & cover method) at km 849/10-12 between bsp-apr section under the jurisdiction of aden/pnd.
a) deep screening (bcm & manual process) and lifting of track under den (ne) section (4 km ).b)deep screening (bcm & manual process) and lifting of track under den (ne) section (17.3 km ).
composite works ( civil and mechanical components ) involving construction of industrial sheds ( extension ) , track works ( embedded ) , drainage system, electrification and illumination works, procurement and commissioning of specified mechanical machineries & plant ( eot cranes etc ) in connection with "extension of 25t & 50t bay with 2 nos. additional crane and 01 no. pit in diesel shed / trs to facilitate safety checking" at ddu of east central railway. ) ".
laying of loco track with cold bending of rails from main line of central stores mettur work shop=> work contract
deep screening of plain track / turnouts and shallow screening of main line between ddupryj section under sr. den / i / pryj.
maintenance of green area between railway line and g . t . k . road ( ismile khan wala bagh ) . sh- day to day cleaning and annual maintenance of one no . public toilet block at m/o green area between railway line and g . t . k . road ( ismile khan wala bagh ) .
construction of rail flyover and its approaches on viaducts, formation in embankments/cuttings including blanketing, supply and spreading of ballast and related works for single track bi-directional electrified railway track on item-rate basis for ddu b-route rfo connecting dfccil ddu yard with vyasnagar station of northern railway and other related works such as quarters, water tank, drainage etc in connection with construction of edfc
supplying and laying of 1200 mm dia (id) m.s.pipe conduits 45m in length to be prepared from 16 mm thick m.s plate by jacking technique, including supplying and laying of 500 mm dia (id) & 300 mm dia (id) m.s. water main within the conduit 65 m in length to be prepared from 12 mm thick ms plate across and underneath the railway track in between sonarpur station and bidyadharpur station
modification_shifting work of 03 nos . 220_132kv ehv lines due to construction of new broad gauge railway track between satna and panna by west central railway under consumer contribution works
consultancy services for authoritys engineer for supervision of construction of 4-lane rob and its approaches jerai on nh-26a , jarua on nh-26a and nh 26-a on katni-bina railway line at level crossing on sagar in the state of madhya pradesh on epc mod consultancy services for authoritys engineer for supervision of construction of 4-lane rob and its approaches jerai on nh-26a , jarua on nh26a and nh 26-a on katni-bina railway line at level crossing on sagar in the state of madhya pradesh on ep...
balance work of assistance in strengthening of railway track from smsi caster to hsm through hscl prw
balance work of strengthening of railway track of blast furnace area through hscl prw
laying of haulage track along 1dn from incline mouth to 26l and 31l to 38l in seam-i and along 1ds from 39l ( seam-i ) to 18l ( seam-ii ) at rani atari ug mine .
under sbm , work of laying drainage line for nala tapping in banganga ( piliyakhal naale ) kumar khedi crematorium to mr-4 railway line to sukhliya bridge , banganga naka to mukharjee nagar and bandganga railway bridge to sai suman nagar along the draina
hiring of consultancy services for facilitation of acquisition of land and utility shifting for construction of new rail line between amritsar and ferozepur via patti , punjab , hiring of consultancy services for facilitation of acquisition of land and utility shifting for construction of new rail line between amritsar and ferozepur via patti , punjab
tender for railway electrification of 25kv ohe works including sps/ ssps, general electrification, civil engineering works, including tower wagon shed, service buildings, staff quarters, track works and signaling and telecommunication works on existing track of single line section of mavi, bari sadri section of ajmer division
virudunagar - vanchimaniyachchi section : through formation treatment from km:- 593.300 to 604.800 for a total length of 11.500 kms in between stations kovilpatti & kadambur in tuticorin permanent way section.
welding of rail joints by pre-heat (skv) welding and automatic thimble technique including supply of all required materials and equipment including thermic portion in connection with sanctioned estimate nos: (08/engg/ap-ii of 2020-21), (06/engg/ap-ii of 2020-21), (12/engg/ap-i of 2020-21, 13/engg/ap-i of 2020-21), (21/engg/ap-i of 2020-21), (26/engg/ap-i of 2020-21), (15/engg/ap-i of 2020-21), (14/engg/ap-i of 2020-21), (23/engg/ap-i of 2020-21), (16/engg/ap-i of 2020-21), (25/engg/ap-i of 2020...
through rail renewal(s)-6.446 km.(loop lines), deep screening work of points & crossings and balance p.way works between moribera(incl.) to rani(excl.) & guriya to marwar jn. doubling section between haripur-palanpur section.
guna-gwalior section - provision of lhs in lieu of manned lc no. 58 (non-interlocked) at km. 1193/7-8 between kolaras-shivpuri section (cut cover by using rh girder) size of rcc box 1/5.00 m x 4.00 m.
guna-gwalior section - provision of lhs in lieu of manned lc no. 115 (non-interlocked) at km. 1292/2-3 between panihar-ghatigaon stations (cut and cover method)
secunderabd division kazipet -balharshah section 3rd line with electrification -hiring of three (3) pick-up vans for supervisors under dy.ce/c/kzj unit for official movement of (i) sse/p- way/c/kzj@bza (ii) sse/p-way/c/kzj@pdpl & sse/w/c/rdm &(iii) sse/w/c/kzj to look after 3rd line works between kzj-rgpm, kzj-wl & ki-bza and anywhere in the jurisdiction of s.c.railway for a period of 21 months.
deep- screening by bcm and manual on khandwa-itarsi, itarsi-bhopal, itarsi-jabalpur and itarsi-nagpur section on specified locations, total 24.35 kms. under sr. den/s/bhopal.
(a) at mlg :- special repairs to opd block, cc wards, administrative block of central hospital, maligaon & miscellaneous repairs to kamakhya railway junction (b) at mlg :- special repairs to cpo office, accounts office, pce office, cmm office of h.q. complex including miscellaneous repairs of rang bhawan & nfrsa stadium.
guntakal division: tbtr: renewal of steel channel sleepers with h-beam sleepers for 2 bridges in sse/br/north jurisdiction (br.no. 80 and 111 of gy-dmm section).
guntakal division: tbtr: renewal of steel channel sleepers with h-beam sleepers for 3 bridges in sse/br/south jurisdiction (br.no. 118dn of gdr-ru section, br.nos. 550dn, 602up of ru-gy section).
sw-i) bza division - bza - gdr section: trr(p) - 1.364km from km 158.636 to 160.00 on dn line in sse/p.way/nlr section of aden/nlr sub - division.sw-ii) bza division - bza - gdr section: tfr (all fittings) : 7.150kms and tfr (without ercs) : 2.953km at various locations in aden/nlr sub - division.
part supply of signaling material, installation, testing and commissioning in connection with various track circuit and point work in section of ahmedabad - khodiyar - palanpur, mahesana - patan - bhildi, mahesana - viramgam, khodiyar - gandhinagar - kalol, ahmedabad - himmatnagr, mahesana -taranga hill and various other locations of ahmedabad division.
nagda-kota section :- through formation treatment by geogrid & geotextile with bcm from km 698.220 to 725.000 up & dn (46.520kms).
guntakal division: tbtr: renewal of steel channel sleepers with h-beam sleepers for 1 bridge in sse/br/central jurisdiction (br.no. 292dn of gtl-bay section).
new bongaigaon-goalpara town-kamakhaya (sl) -tsr(p) - 8.70 km.
welding of 60kg /90 uts rails in-situ with single shot crucible fitted in connection with track renewal and maintenance work in kharagpur division. (13,682 joints)
refurbishing of camp coaches for track machines
joravasan - surat sec. ctr(s/p) = 8.290km in connection of sanctioned work ctr(s/p) = 15.524km
"signal zonal work under the jurisdiction of sse/sig/vzm in waltair division."
at bt-bnj section: construction of rail fencing & ballast wall total 7740m at km 26/5 to 27/5,km-30/13 to 31/15,km-36/19 to 37/7, km-37/18 to 38/6, km@45'47@15 to 40/15 both up & dn track near railway track under senior section engineer/works/bongaon in the jurisdiction of assistant engineer/barasat
at bt-bnj section: construction of rail fencing & ballast wall total 8720m at km-52/20 to 53/14, km-53/21 to 54/5, km-66/33 to 67/25, km-61/23 to 62/13 & km-75/5 to 76/5 both up & dn track near railway track under senior section engineer/works/bongaon in the jurisdiction of assistant engineer/barasat
proposed repairs of tracks in scattered location under section of sse(p.way) butibori under aden(s)ngp sub-division.
pnbe - ddu section (1) ctr/p dn line km 556.2 - 560 = 3.8 km, 643.9 - 644.5 = 0.6km, 661 - 662 = 1.0 km, 675 - 678 = 3.0 km, 678.0 - 678.5 = 0.5 km, 679.75 - 680.0 = 0.25 km, up line km 629.0 - 629.5 = 0.5 km, 671 - 672 = 1.0 km, 689.098 - 690.143 = 1.045, 697.66 - 698.246 = 0.586, 711.25 - 712.308 = 1.058, 730.528 - 733.0 = 2.472 km 736.124 - 744.1 = 7.976 & 744.1 - 748.0 = 3.9 km (total 27.687 km) and (2) tsr/p on dn line 568.65 - 568.95 = 0.3 km up line 551.0 - 555.0 = 4.0 km up line 571.095...
1) s&t work in connection with track renewal in kte-bina section of jabalpur division. 2) s&t work in connection with proposed construction of limited height subway (lhs) in lieu of l-xing no. 60 (spl class) in between dmo-kyx station in bin-kte section.
construction of cut & cover tunnel no. 1c ( approx. length - 90m ) at ch. 6.550 km to 6.640 km, c&c no. 2a ( approx. length - 50m ) at ch. 6.550 km to 6.640 km, balance works of c&c no. 1b ( approx. length - 150m-rcc box ) at ch. 6.750 km to 6.90 km, c&c no. a0 ( approx. length - 145m ) at ch. 0.772 km to 0.941 km and balance works of ug tunnel no. 1 ( side drains, trolley refuges excavation & lining ) at ch. 2.051km -3.932km, ug tunnel no. 1a ( ug lining of approx. length 134m ...
open tender for the work of repair and maintenance of track under sse/p-way/dumka
"samuktala - kamakhyaguri - tbr - 8.00 km. & alipurduar - samuktala - tbr - 12.60 km."
open tender for strengthening of br. no.679,685,690 etc. in main line, br. no.64,66,117 etc. in jasidih- dumka line with other ancillary work under the jurisdiction of aen/jsme.
construction of cut & cover tunnel no. 1c (approx. length - 90m) at ch. 6.550 km to 6.640 km, c&c no. 2a (approx. length - 50m) at ch. 6.550 km to 6.640 km, balance works of c&c no. 1b (approx. length - 150m-rcc box) at ch. 6.750 km to 6.90 km, c&c no. a0 (approx. length - 145m) at ch. 0.772 km to 0.941 km and balance works of ug tunnel no. 1 (side drains, trolley refuges excavation & lining) at ch. 2.051km -3.932km, ug tunnel no. 1a (ug lining of approx. length 134m) at ch. 4.376 km to 4.510 k...
doubling of railway track between ludhiana and kila raipur ( 17.174 km ) including electrification and signaling telecommunication works on engineering procurement construction ( epc ) mode.
repairing of existing railway track at icd balasore
tender for 132 / 33 kv rai nagar to 33 / 11 kv balrai turnkey base work under edd iiird saifai etawah-1 supply of 33 kv xlpe insulated al. cable 3 x 300 sq. mm. 2 supply of g.i. pipe 160 mm. dia for u/g laying of 3x300 sq. mm. 33 kv xlpe cable below the railway track (pipe to be laid by h.d.d. method) 3 supply & erection of 33 kv heat shrinkable jointing kit outdoor type for 33 kv, 3x300 sq. mm. xlpe cable 4 supply & erection ofm.s. droper channel 100x50 mm, 3000 mm long with 2 nos clamps- ...
ctr(s)-14.850 kms with 60 kg rail and 60 kg prc sleeper @ 1540 with ballast cushion and earth work from inside ammunition depot shed no. 139/148.
supply of marshalling yard spares ( rail track material ) for rgtpp hisar, dcrtpp yammunanagar and ptps panipat
repair and maintenance of railway track for smooth movement of rolling stock in bhel bhopal
mangalore -proposed preparatory works in connection with g m inspection between mangalore- mangalore junction- panambur(other than track works).
senior section engineer permanent way mangalore section: proposed preparatory works in connection with gm inspection for the year 2020-21 (track work)
linking of new bg track with 60kg / 52kg new rails / sh rails and psc sleepers with 1660 nos / per km in main line and m+7 sleeper density in loop lines on newly constructed formation and linking from km 17 / 0 to 44 / 0 including spreading of ballast and loading / unloading, carrying of rail, sleeper, points & crossing and p. way fittings to molvom / pherima station including flash butt welding and other ancillary works related to track linking in connection with dhansiri-zubza ( bg )...
hubballi- chikjajur doubling project:- track linking works between kundagol (ex) and savanur yard (ex)between km: 450/000-423/500 & 420/500-414/000 ( including snh yard & gdi yard) for total : 33.0 km.
conversion of coaches into camp coaches (refurbishment) for 26 coaches at c&w workshop, n.f. railway, new bongaigaon.
mys division: birur-hubballi section:- ancillary work in connection with deep screening by bcm for a length of 39.775km in aden/davangere sub division under sanctioned work of through ballast renewal (tbr) from km 210 to km 380 for a length of 71.23 km at scattered locations between birur-harihar stations. (locations for a length of 39.775km- 211/800-217/200(up), 218/400-220/965(up), 228/000-230/900(up), 248/710-258/577(up), 228/510-230/800(dn), 262/000-278/753(dn))
mysuru division: birur-hubli section:- ancillary work in connection with deep screening by bcm for a length of 31.455 km in aden/dvg sub division under sanctioned work of through ballast renewal (tbr) from km 210 to km 380 for length of 71.23 km at scattered locations between birur - harihar stations. (locations for length of 31.455 km - 279/500- 280/500 (dn), 288/071-289/026 (dn), 339/000-350/000, 361/500-380/000)
zonal work in zone no. 4 for period ending 30.06.2021 jurisdiction: bandariya bagh north eastern railway colony & drm office building.
a)trr(p)-6.47 km and tsr (p)-17.90 km in kalyan-lonavala section. b)deep screening of track 9.07 by bcm process between kms105.33 to kms.114.4 kms=9.07 kms in kjt- khpi(sl) under sr.den(se) juridictionc)deepscreening by bcm between kalyan-lonavala section(kyn-lnl-trr(p)-6.47km &tsr (p)-17.90)
udhna - jalgaon:tbr plain track, p&c, shoulder & crib ballast, tftr, trr, crr and ttr under aden-amalner inconnection of sanctioned track works for the year 20-21.
bilharghat -sohawal section :- linking of b.g. track & turnouts, provision of glued joint & sejs, dismantling of existing track & turnouts , handling, lifting, loading, unloading and spreading of ballast, leading of p-way materials and others lied works in between bilharghat (excluding) to sohawal (including) & excluding ,darshan nagar & salarpur yard in connection with''proposed doubling of barabanki-akbarpur (161 km)" of lucknow division on northern railway.
secunderabad- dhone sections: ctr (p) for 6.55 kms (for a length of 3.95 kms only).
hyderabad division-tbr-27.36 km: rear works behind bcm in deep screening locations of den/lines/hyb jurisdiction
shallow screening by sbcm machine between kyn-igp & dw-bsr section under sr.den (ne) csmt section.
bhusawal division - ctr/s work at savda up & dn loop, raver up & dn loop, burhanpur up & dn loop, nepanagar dn loop, dongargaon dn loop, khandwa dn 1st & 2nd loop, total 8.551tkms on aden khandwa section under sr. den (north) bhusawal jurisdiction.
through rail renewal (primary) of existing 60k. rail with new 60kg. 90uts rail for 26.211 tr.km. (i) (km.410.55-412 (joint line) = 1.45 tr.km., km.404.54-412 (up line)= km.7.46 tr.km., km.427-434.05 (up line)= 7.05 tr.km., km.452.3-453.16 (up line)= 0.86 tr.km., 455.45-459.64 (up line) = 4.19 tr.km. between bndm-jsg., (ii)km.497/8-498/22 (dn line)= 1.5 tr.km. between dtv-beh, km.515/4-514/26 (dn line)=0.5 tr.km. (total - 2.0 tr.km.), (iii)km.412-414 (up line) = 2.0 tr.km. between bndm-rou, (iv)...
through sleeper renewal (primary) of existing psc-60kg sleeper (1660nos/km) with new psc-60kg sleeper(1660nos /km , wider base psc sleeper) with elastic fastening including deep screening / raising of ballast cushion to the standard of 35cm, for 8.8km in between section bndm-rou in ckp division under juridication of den(west)/ckp (by pqrs) (2nd call)
bhusawal division - tsr (p)- 20 kms with trt with deep screening by bcm in igatpuri- manmad section under sr. den(south)bhusawal's jurisdiction.
sw-i: proposed cess work in connection with the work of bengaluru-mysore section (24.9 km). sw-ii: sw-ii: proposed cess in connection with the work of bengaluru-mysore section for a length of 19.60 kms. sw-iii: strengthening of bank by providing standard width for a length of 11.05 km in sse/pway/kgi section. sw-iv: strengthening of bank by providing standard width for a length of 8.2 kms in sse/pway/cpt section. sw-v: strengthening of bank by providing standard width for a length of 10.9 kms i...
proposed passing 1850mm dia carrier pipe for water supply under railway track at km 523/3-4 by pushing technique of rcc box of size 2.50mx2.50 on sur- wd section
tftr work at km 519/6-8, 526/4-527/8 & 529/2-530/5= 2.90km under aden/klbg subdivision [re-invitation]
annual repairing contract of defective pdh/sdh equipment cards (make- tejas, webfil & puncom) installed under the jurisdiction of sr.dste/lmg in lmg division for a period of two years.
eastern railway ctr(p) hwh - bdc ctr(p) work- reverse m/l- ( 38.0 - 38.845 km = 0.845 km) total = 0.845 km by pqrs & reverse m/l 6.0 - 9.15 = 3.15 km), (10.42 - 12.999 = 2.579 km), tkpr engine line + receiving line -(0.918 - 1.961 km = 1.043 km), total = 6.772 km by manual, hwh bdc - total ctr(p) = 7.617 km and other locations with other ancillary works.