51299162 Corrigendum : of all materials and equipment, machinery, civil, structural, electrical, mechanical, instrumentation, piping works including painting works, tape coating on u/g piping, commissioning spares and tools/tackles as per scope of work, specifications, drawings
51270253 Corrigendum : after considering derating factor ac 3 phase , 415 volts, 50 hz, 1500 rpm brushless type self excited, self regulated screen protected type and avr system. 53 (b) diesel engine: diesel engine water cooled suitable for alternator of250 kva capacity
51779565 diesel engines shall be as per moef (ministry of environment, forest and climate change) notification dtd. 3rd november 2022.
50894081 Corrigendum : , low lub oil trip, engine hours(v) engine and alternator data startingf batter voltage, engine running hours, engine temp, engine oil pressure, alternator voltage, current, kva, frequency, kwh shall be displayed.
50665663 Corrigendum : pre commissioning inspection of gis module shall be carried out by senior electrical inspector / electrical inspector. 70 a) local control cubicles.b) gas handling equipment for draining and refilling of each compartment of gis including filtration and