|
| 1 | NON-CENTRALIZED MATERIAL (SUPPLY) |
| 2 | 11 KV IPC for covered to covered conductor. |
| 3 | 11 KV IPC for covered to bare conductor. |
| 4 | 11 KV MID Span Jointing kit |
| 5 | IPC with Al. Bail for Earthing 11 KV |
| 6 | 11 KV Sus.Ties/Cable Ties on Pin Insulater |
| 7 | 11 KV AAAC Covered Conductor AL-59, 99 Sq. mm |
| 8 | 11 KV Tension clamp with Bail & IPC |
| 9 | LABOUR PART (WORK) |
| 10 | Repairing of Plinth |
| 11 | Chemical Earthing |
| 12 | Erection of Earthing Rod |
| 13 | Fabrication of steel |
| 14 | Excavation of pit for stay set |
| 15 | Grouting of stay set |
| 16 | Excavation of pit for Pole |
| 17 | Erection of Single SP-23 Pole |
| 18 | Erection of SP-23 Double Pole |
| 19 | Grouting of Pole |
| 20 | Muffing of Pole |
| 21 | Dismantling of Stay Set |
| 22 | Painting of SP-21/23 Pole |
| 23 | Fencing of DTR |
| 24 | Const. Inst. Of Danger Board/Number Plate |
| 25 | Cartage SP-21/23 Pole, 51-70 Km |
| 26 | Cartage of petty material, 51-70 Km |
| 27 | Headload Cartage SP-21/23 Pole (1-3 Km) |
| 28 | Headload Cartage of Material (1-3 Km) |
| 29 | Straightening of Tilted STP Poles |
| 30 | Erection of 11 KV Stay Set |
| 31 | Fixing of IPC with Al. Bail for Earthing |
| 32 | Jumpering of D/P TPMO, Fuse set and T/F |
| 33 | Opening & Making of Jumpher of section P |
| 34 | Re-erection of stay with Digging of Pit |
| 35 | Fixing of 11 KV 90 KN Tension clamp B&IPC |
| 36 | Fixing of 11 KV Suspension Ties |
| 37 | Fixing of 11 KV MID Span Jointing Kit |
| 38 | Back Head Load Cartage of Petty material, 1-3 KM |
| 39 | Fixing of 11 KV IPC for covered-covered |
| 40 | Fixing of 11 KV IPC covered to Bare Conductor |
| 41 | Supply & Fixing of ANTI Climbing Device |
| 42 | Supply & Fixing of stay Insulator with N&B |
| 43 | Laying spreading, Stringing AAAC Conductor |
| 44 | Removing OLD Jumpers or Conn. From Isola |
| 45 | Removing Old conductor By opening jumper |
| 46 | Erection of Stay Clamp |
| 47 | Back Carriage of scrap Material Please Enable Macros to View BoQ information |