| 1 | Labour for stripping off worn out plaster on brick wall upto any height and any floor, net cement and wall, existing floor including scaffolding work. |
| 2 | Materials for providing 20mm thick cement sand plaster (1:4) on brick wall all complete including curing. |
| 3 | Labour charges for providing 20mm thick cement sand plaster (1:4) on brick wall all complete including scaffolding and curing. |
| 4 | Labour charges for dismantling of nine nos of windows and two nos doors and make a proper shape after dismantling. |
| 5 | Supply of new sliding windows including labour charges and fitting fixing with glass and fittings all complete. |
| 6 | Repairing of two nos steel windows with glass and fitting all complete |
| 7 | Supply of materials and labour for two nos doors including labour charges of fitting fixing and supply of all the necessary fittings. |
| 8 | Labour charges for removal of old paint and make a smooth surface as required. |
| 9 | Supply of materials and labour for making paint putty finish inside the rooms. |
| 10 | Supply of materials for painting of staircase from top to bottom. |
| 11 | Supply of materials and labour for making of good quality ceramic tiles in walls with 15mm thick cement sand mortar (1:4) and 2mm thk cement slurry at back of tiles and finishing the joints. |
| 12 | Supply of materials and labour charges for good quality Vitrified tiles in floor with 20mm thk sand cement morte (1:4) and 2mm thk cement slurry and finishing the joints. |
| 13 | Supply of western commode with accessories including labour charges of fitting fixing. |
| 14 | Supply of wash basin with labour charges including accessories. |
| 15 | Supply of materials for all sanitary items including waste line. |
| 16 | Supply of materials and labour for oil paint as required. |
| 17 | Labour charges for removal of rubbish from the site . |
| 18 | Materials for supplying of bituminous water proofing membrane 2,104 grade over existing roof sheeting including necessary scaffolding, through cleaning of roof surface and gutters all complete as per direction. |
| 19 | Labour for supplying of bituminous water proofing membrane 2,104 grade over existing roof sheeting including necessary scaffolding, through cleaning of roof surface and gutters all complete as per direction. Please Enable Macros to View BoQ information |