|
| 1 | Demolition of brick work built in cement mortar complete all as specified and directed |
| 2 | Demolition cement concrete(un reinforced)in ground floor and packing n exc 15 cm thickness (bellower above ground level)complete all as specified and directed |
| 3 | Demolition of Roof,floors(Other than ground floors ) beams,Staircase ,landing chajja, and similar suspended work in cement concrete is reinforforced (reinforcement cut as required to facilotate demolition complete all as specified and directed |
| 4 | Taking down cement plaster from brick wall including racking out joints hacking for key and scrubbing down with water complete all as specified |
| 5 | Dismantling asbestos cement (corrugated,semi corrugated etec ) sheets in roof covering complete all as specified and directed . |
| 6 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed |
| 7 | M & L for brick work with sub class ‘B’ brick straight or curved on plan exc 6 Mtr mean radius built in CM (1:6) complete all as specified and directed |
| 8 | Removing Cement mortar or cement lime mortarr from and cleaning bricks, stacking for measurement including allextra handling and removal and disposing off rubbish complete all as specified and directed |
| 9 | All as per item no 7 above but expect bricks complete all as specified and directed |
| 10 | M & L Galvalised mild steel wire netting of chicken wire mesh 0.46 mm nominal dia of wire & 10 mm mesh size all as spd fixed to wallsroof etc & directed by Engr-in-charge. |
| 11 | M&L for 15mm thick rendering on surfaces of brick work or stone walling in CM 1:6 finishing the surface fair & even complete all as spfd and directed. |
| 12 | M&L for 15mm thick rendering on brick work or concrete surface in CM 1:4 mixed with WPC @ 2% by weight of cement finishing the surface fair & even complete all as spfd and directed. Note:- WPC shall be measured and paid saperately. |
| 13 | M&L for rendering 10 mm thick on concrete surfaces like ceiling, chajja etc in cement mortar 1:3 and finished even and smooth without using extra cement icomplete all as specified and directed |
| 14 | Supply only integral water proofing compound |
| 15 | M&L for preparation of newly plastered surfaces of wall and applying two coat white wash complete all as specified and directed |
| 16 | M&L two coats of white wash on newly plastered surfaces as on ceiling including preparation of surfaces, complete all as spfd and directed. |
| 17 | M&L for Preparing new plastered or unplastered surfaces of walls and applying two coats of cement base paint white or tinted over & including a coat of white cement wash complete. |
| 18 | M&L for preparation of plastered surfaces of walls and applying two coats of distemper (washable) oil emulsion paint on walls complete all as specified and directed. Please Enable Macros to View BoQ information |
| 19 | M&L for preparation of plastered surfaces of walls and applying two coats of distemper (washable) oil emulsion paint on walls complete all as specified and directed. Please Enable Macros to View BoQ information |