|
| 1 | Detail of Work |
| 2 | Safely cartage of PCC poles 8.5 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends.(Dist. Up to 50 Km) |
| 3 | Safely cartage of PCC poles 09 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends.(Dist. Up to 50 Km) |
| 4 | Safely cartage of PCC poles 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends.(Dist. Up to 50 Km) |
| 5 | Safely cartage of ST Pole 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends.(Dist. Up to 50 Km) |
| 6 | Safely cartage of other complete line material (Except PCC /ST Poles) from ESC, SRE/ JE store to site of work including loading, unloading at both ends. |
| 7 | Erection of single support on PCC poles 8.5 Mtr. Long with complete fitting of all accessories of 11 KV/LT line properly |
| 8 | Erection of single support on PCC poles 09 Mtr. Long with complete fitting of all accessories of 33 KV line properly |
| 9 | Erection of single support on PCC poles 11 Mtr. Long with complete fitting of all accessories of 33 KV line properly |
| 10 | Erection of single support on ST Pole 11 Mtr. Long with complete fitting of all accessories of 33 KV/11 KV/LT line properly |
| 11 | Erection of double Pole on PCC Pole 09 Mtr. Long with complete fitting with all accessories of 33 KV/11 KV line. properly |
| 12 | Erection of double Pole on ST Pole 11 Mtr. Long with complete fitting with all accessories of 33 KV/11 KV line. properly |
| 13 | Erection of double Pole on PCC Pole 8.5 Mtr. Long with complete fitting with all accessories of 11 KV line. properly |
| 14 | Fixing of 11KV/33 KV stay rods by digging of pits in block of 600X600X300 mm. & with nozzling of stay wire 7/10 / 7/8 SWG and fitting the same on the pole. |
| 15 | Providing and fixing of All type Clamp with nuts bolts made of MS Flat iron 50x6 mm. |
| 16 | Providing and fixing of All type nuts & Bolts |
| 17 | Providing and fixing of LT shackle insulator of size 100x115 mm. |
| 18 | Removal of old Damaged conductor from the Existing 33 KV/11KV/ LT lines with making roll of conductor and shifting the same to ESC, SRE/J.E store including loading and unloading at both ends. |
| 19 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Weasel Conductor for 11KV/LT Line complete properly. |
| 20 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Rabbit Conductor for 11KV/LT Line complete properly. |
| 21 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Dog Conductor for 33KV Line complete properly. |
| 22 | Tightening of loose stay including opening binding and nozzling of stay wire |
| 23 | Re-straightening of tilted PCC pole/ST Pole up to 13 Mtr of 33KV/11 KV & LT line with opening all accessories. |
| 24 | Re-strengthening of tilted D/P (PCC/ST Pole) with removing of T/F along with complete fitting and refitting of complete fitting after re-strendhtening of tilted Double pole. |
| 25 | Re-strengthening of 33 KV tilted D/P (PCC/ST Pole) with opening of complete fitting and re-fitting of complete after re-strenghtening of tilted double pole. |
| 26 | Re-setting of X-arm of 11 KV /33 KV Line. |
| 27 | Replacement of damaged banded X-arm 33 KV/11KV Line |
| 28 | Replacement of damaged 33 KV /11 KV Disc & Pin insulators |
| 29 | Re-sagging of loose conductor of 11 KV /LT line with opening binding & re-binding with jumpering etc. |
| 30 | Re-sagging of loose conductor of 33 KV line with opening binding & re-binding with jumpering etc. |
| 31 | Off shooting of tree branches touching the above 33 KV/11 KV Line Please Enable Macros to View BoQ information |