|
| 1 | Fabrication of mild steel/iron work in steel gate including cutting, drilling, welding and all cost of material, labour T&P etc complete. As per direction of Engineer in charge. |
| 2 | Threding and turning of 50 mm dia spindle rod including all material, labour T&P etc. complete. As per direction of Engineer in charge. |
| 3 | Painting two coat of synthetic enamel paint on new surface including of all material, labour and T&P required for proper completion of work. As per direction of Engineer in charge. |
| 4 | Painting one coat of red oxide primer on steel surface after sand papering and cleaninig of surface including cost of all material labour and T&P etc. As per direction of Engineer in charge. |
| 5 | E/W in excavation of foundation in all type of soil including all lead, lift T&P etc. complete. As per direction of Engineer in charge. |
| 6 | Laying Plain Cement Concrete in 1:3:6 with maximum size of 40 mm crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour, materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 7 | Laying Plain Cement Concrete in 1:1.5:3 with maximum size 20 mm crushed stone ballast & Coarse sand having F.M. not less than 2. including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 8 | M.s work in reinforcement including cutting, bending & placing in position including binding wire. As per direction of Engineer in charge. |
| 9 | 1st class B/W in 1:4 C.M.Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 10 | Deep struck cement pointing 1:2 CM including all cost of material,labour T&P etc. complete. As per direction of Engineer in charge. |
| 11 | Hiring charge of tripod, chain tackle, tractor trolly for lowering of steel gate including all cost of material, labour T&P etc. complete. As per direction of Engineer in charge. |
| 12 | Oiling and greasing charge in steel gate including all cost of material, labour T&P etc. complete. As per direction of Engineer in charge. |
| 13 | Finishing wall with two coats of water proofing cement paint of approved make & quality of required shade on wall surface over one coat of white cement primer with preparation of surface i/c cost off all material . As per direction of Engineer in charge. |
| 14 | E/W in restoration of bank in all type of soil including all lead,lift T&P etc. complete. As per direction of Engineer in charge. |
| 15 | Centering shuttering for super structure work as per direction of engineer in charge |
| 16 | Laying Plain Cement Concrete in 1:2:4 with 4.75 to 20 mm size crushed stone ballast & Coarse sand having F.M. not less than 2. including all cost of labour, materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 17 | Providing and fixing 100 mm dia R.C.C. N.P.2 pipe including all cost of material,labour T&P etc. complete. As per direction of Engineer in charge. |
| 18 | 12 mm thick Plastering work in 1:4 CM. including all cost of labour, materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. Please Enable Macros to View BoQ information |