| 1 | Dismantling of old interlocking tiles including of dismentled material. |
| 2 | Dispoasal of dismantled materials up to 5.00 KM distance complete with labour T&P etc at site. S.I No- 231(a) 100% disposal of excavated materials |
| 3 | Exacavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M and lead upto 30M. As directed by the Engineer-in charge upto a distance of 30M. From the foundation trenches. S.I No-251 |
| 4 | Cement Concrete with 400mm gauge stone ballast, fine sand and cement in proportion of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the work as per site direction of engineer in charge. (S.I-281) |
| 5 | RCC work with cement, approved coarse sand and 40mm gauge approved stone ballast, coarse sand and cement, in the proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. S.I chap 20 SI 287 a |
| 6 | RCC work with cement, approved coarse sand and 20mm gauge approved stone ballast, coarse sand and cement, in the proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. Chap 5 S.I.No. 289 |
| 7 | M-150 Brick Work with cement and coarse sand in proportion of 1:4 in foundation and plinth including supply of all material labour. Tools & plants etc. required for proper completion of the work S.I no. 305 A |
| 8 | RCC work with cement, approved coarse sand and 20mm gauge approved stone ballast, coarse sand and cement, in the proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. Chap 20 SI 285 |
| 9 | M-150 Brick Work with cement and coarse sand in proportion of 1:4 in foundation and plinth including supply of all material labour. Tools & plants etc. required for proper completion of the work S.I no. 305 A and 310 |
| 10 | RCC work with cement, approved coarse sand and 40mm gauge approved stone ballast, coarse sand and cement, in the proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. S.I chap 20 SI 284A |
| 11 | M.S reinforcement work in R.C.C work |
| 12 | 12mm thick plaster with cement and fine sand 1:4 over brick work minimum thickness not to be less than lem. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work as per site direction of engineer in charge (S.I - 584) |
| 13 | Providing wall putty on old surface with approved quality material of Berger/J.K/Birla or similar make 2 coat. (New Item) |
| 14 | Finishing wall with weather coat of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools&plant etc. required for proper completion of the work. SI No 662 New item |
| 15 | Earth work in filling with ordinary soil excavation to be in the form of regular pits not exceeding 0.50M. In depth and earth work in embankment to be in 202cm. Layers including remming and dressing. Distance and cartage upto 5km as directed by the Engineer incharge. SI no. 253a, 261b, 231a |
| 16 | Supply and fixing 6 to 8 mm thick ivory or light shades Vitefied tiles 600*600 mm size in flooring and skirting with 1:3 approved cement colour sulury, joing and polished of approved quality complete CHAP 14 New ITEM 4 |
| 17 | Providing and fixing 1 mm thick M.S sheet door with frame of 40*40*6 mm angle iron 3.15 mm thick M.S gusset plate at the junction and corners including supply and fixing of necessary fittings, and aaplying priming coat of red lead paint on all sides complete SI 517 a |
| 18 | Painting roofs and other iron works in large areas with one coat of priming and one coat of approved paint including supply of all material etc. (Qty) Please Enable Macros to View BoQ information |