| 1 | CMC OF VARIOUS FIRE FIGHTING SYSTEMS AND PERIODICAL REFILLING OF FIRE EXTINGUISHERS |
| 2 | Providing Operation and Maintenance Services covering all parts/accessories/equipments under Comprehensive Maintenance Contract (CMC) of Addressable Fire Alarm Control Panel (Edward make) installed with 3 loop cards including reprogramming, Fire Detection System (i.e. MCP, Hooter, Smoke Detector etc.), Fire Hydrant System (i.e. pumps, valves, gauges, pipes, hoses etc.) and Fire Extinguisher (i.e. Mechanical, ABC and CO2) at SLDC Bhawan, Lucknow mentioned in technical specifications of tender document.(1 Job per month) |
| 3 | Providing Operation and Maintenance Services covering all parts/accessories under Comprehensive Maintenance Contract (CMC) of Total Flooding System (FM-200) at SLDC Bhawan, Lucknow mentioned in technical specifications of tender document.(1 Job per month) |
| 4 | Periodical refilling of Trolley Mounted Mechanical Foam Type (50 kg) |
| 5 | Periodical refilling of ABC Dry Powder Type (5 kg) |
| 6 | Periodical refilling of CO2 Type (10 kg) |
| 7 | Periodical refilling of CO2 Type (4.5 kg) |
| 8 | Dismantling of exsisting tank & Supply of Structural supports, fabrication of cylinder manifolds along with all necessary fittings |
| 9 | Dismantling of existing 05 nos. of FM-200 cylinder bank arrangement installed in Optical fiber Server Room & New SCADA sever room including associated manifold system to facilitate installation of 5 Nos. existing cylinders and 2 Nos. new cylinders. It includes careful removal of existing cylinder fixing framework, supports, clamps, manifold piping connections, changeover system, and all allied accessories as required. |
| 10 | Manifold for 2 nos. of new FM-200 cylinders system acting as working spares with the exsisting system |
| 11 | Supply & Fixing of 80 Ltr capacity cylinder with low pressure indication switch |
| 12 | Supply & Fixing of FM200 clean agent gas i.e. HFC 227 |
| 13 | Supply & Fixing of Selector switch to accommodate old existing system with new system |
| 14 | Supply & Fixing of Motorized valve |
| 15 | Supply & Fixing of Discharge pressure switch |
| 16 | Supply & Fixing of Discharge Hose / Adaptor |
| 17 | Supply & Fixing of Manifold Check Valve |
| 18 | Supply & Fixing of Electric Actuator with placement indication switch |
| 19 | Supply & Fixing of Manual actuator |
| 20 | Supply & Fixing of Pneumatic Actuator |
| 21 | Supply & Fixing of Master kit comprising accessories |
| 22 | Supply & Fixing of Slave kit for slave cylinder |
| 23 | Supply & Fixing of Distribution piping Sch 40 |
| 24 | Commissioning and handover of the FM200 gas suppression system |
| 25 | Hydro-Static test & Refill of Existing 04 Nos. Of FM-200 Cylinders |
| 26 | Dismantling of 02 (two) nos. existing 80-litres FM-200 cylinders in Optical Fibre Server Room from the existing system, careful packing in wooden boxes, transportation to and from U P SLDC Limited to the refilling center for hydrostatic testing including all labour, loading/unloading charges, complete as required. |
| 27 | Hydro-static test of 02 nos. of old cylinders installed in Optical Fibre Server Room |
| 28 | Refilling of agent gas after conducting the Hydro-static test of 02 nos. of exsiting cylinders installed in Optical Fibre Server Room |
| 29 | Supply of Cylinder valve change of 25mm size |
| 30 | Comissioning and handover of the Hydro-static tested 02 nos. of exsiting cylinders installed in Optical Fibre Server Room |
| 31 | Supply & fixing of New cylinder in case hydotest fails for the exsiting cylinder |
| 32 | Dismantling of 02 (two) nos. existing 80-litre FM-200 cylinders in New SCADA Server Room, careful packing in wooden boxes, transportation to and from U P SLDC Limited to the refilling center for hydrostatic testing including all labour, loading/unloading charges, complete as required. |
| 33 | Hydro-static test of 02 nos. of old cylinders installed in New SCADA Server Room |
| 34 | Refilling of clean agent gas after conducting the Hydro-static test of 02 nos. of old cylinders installed in New SCADA Server Room |
| 35 | Supply & Fixing of Cylinder valve change of 25mm size |
| 36 | Commissioning and handover of the Hydro-static tested 02 nos. of old cylinder installed in New SCADA Server Room Please Enable Macros to View BoQ information |