Bids Are Invited For Custom Bid For Services - Refractory Mesonery In Boiler - After Dismantling The Arches, Walls, And Roof Vassels Of Boiler No. 1, A 20-Tonne Capacity Furnace, As Per Instructions, Repair Them Accordingly And Give A Satisfactory Tr, Mau-Uttar Pradesh
TDR : 56187719
Tender Notice
BOQ
14 Days Left
Mau
Uttar Pradesh
Bids Are invited for Custom Bid For Services - Refractory Mesonery In Boiler - After Dismantling The Arches, Walls, And Roof Vassels Of Boiler No. 1, A 20-Tonne Capacity Furnace, As Per Instructions, Repair Them Accordingly And Give A Satisfactory Tr
After dismantling the arches, walls, and roof vassels of Boiler No. 1, a 20-tonne capacity furnace, as per instructions, repair them accordingly and give a satisfactory trial by shutting off all flue gas from the boiler
After dismantling the arches, walls, and roof vassels of Boiler No. 1, a 20-tonne capacity furnace, as per instructions, repair them accordingly and give a satisfactory trial by shutting off all flue gas from the boiler
2
After dismantling the arches, walls, and roof vassels of Boiler No. 2, a 20-tonne capacity furnace, repair them accordingly and give a satisfactory trial by shutting off all flue gas from the boiler
After dismantling the arches, walls, and roof vassels of Boiler No. 2, a 20-tonne capacity furnace, repair them accordingly and give a satisfactory trial by shutting off all flue gas from the boiler
3
After dismantling the arches, walls, and roof vassels of Boiler No. 3, a 30-tonne capacity furnace, repair them accordingly and give a satisfactory trial
After dismantling the arches, walls, and roof vassels of Boiler No. 3, a 30-tonne capacity furnace, repair them accordingly and give a satisfactory trial
4
Dismantling the outer and inner wall tiles of Boiler No. 3 as per instructions, as well as dismantling and reinstalling all flue gas diversion valves and other fittings, and conducting a satisfactory trial
Dismantling the outer and inner wall tiles of Boiler No. 3 as per instructions, as well as dismantling and reinstalling all flue gas diversion valves and other fittings, and conducting a satisfactory trial
5
Dismantling the roof and walls of Boiler No. 3 as per instructions for replacing the super heater coil, and reinstalling and conducting a satisfactory trial
Dismantling the roof and walls of Boiler No. 3 as per instructions for replacing the super heater coil, and reinstalling and conducting a satisfactory trial
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.