| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 2 | 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).(Ref:-4.1.8) |
| 3 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 4 | 40mm thick with 20mm nominal size stone aggregate.(Ref:-11.3.1) |
| 5 | Providing and laying Vitrified tiles in floor with different sizes, with water absorption less than 0.08% and conforming to IS:15622 , of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). |
| 6 | Size of Tile 600x600 mm (Ref:-11.49.2) |
| 7 | Providing and applying white cement based putty of average thickness 1mm of approved brand manufacturer over the plastered wall sufrace to prepare the surface even and smooth complete. (Ref:-13.80) |
| 8 | Removing white or color wash by scrapping and sand papering the surface smooth including necessary repairs to scratches etc complete (Ref:-13.88) |
| 9 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade |
| 10 | Old Work (one or more coats) (Ref:-13.90.1) |
| 11 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. It shall also include cleaning/removal of vegetation, algae, dirt, greasy layers (on all vertcal, horizontal, tapered, downward/upward hanging inside, concave longitudinal/veritcal louvers or any other existing surface) . After cleaning, two coats of epoxy bonding agent is to be applied as per site. Then repair of existing surface with plaster and grit and making/maintained existing pattern of finish. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. (Ref:-14.72) |
| 12 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. |
| 13 | For thickness of tiles above 25 mm and up to 40 mm (Ref:-15.23.2) |
| 14 | Flush Pointing with cement mortor 1:3 (1 cement : 3 fine sand ) mixed with 2% of intergal water proofing on exsisting red stone clading Complete in all respect to entire satisficatio of the Engineer in Charge. (Ref:-N.S.) |
| 15 | Providing & fixing readymade (Precut) red agra stone of 40mm thickness of 33\\" x 11\\" (or as per site) size to be fixed with hold fastners(to be paid extra). The work includes dismantling/ cheiseling of existing cement mortar and apply 12mm thick cement mortar 1:3 (1 cement : 3 corse sand) for fixing of stone along with matching colour grout as per stone shade and necessary scaffolding work. Complete in all respects to the entire satisfaction of the engineer in-charge.(Ref:-N.S.) |
| 16 | Providing & fixing 8mm dia counter sunk hold fastener(without washer)150mm long with PVC gutty(rawl plug) on existing stone with drilling and chiseling by machine at any height including all leads and lifts and cost of scaffolding including finishing of stone with epoxy/white cement (mixing with matching pigment) along with 1:2(1 cement:2 coarse sand) cement mortar. Complete in all respects to the entire satisfaction of the engineer incharge.(Ref:-N.S.) Please Enable Macros to View BoQ information |