| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. |
| 2 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete all as specified and directed by Engineer-in-Charge. |
| 3 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. |
| 4 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts complete all as specified and directed by Engineer-in-Charge. |
| 5 | Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. |
| 6 | Taking down shutters of any description exc 1 sqm each but not exc 2 sqm each and removing from the site complete all as specified and directed by Engineer-in-Charge. |
| 7 | Taking down shutters of any description not exc 1 sqm each and removing from the site complete all as specified and directed by Engineer-in-Charge. |
| 8 | Taking down shutters of any description exc 1 sqm each but not exc 2 sqm each and refixing in the same opening complete all as specified and directed by Engineer-in-Charge. |
| 9 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc, removing rubbish off the premises complete all as specified and directed by Engineer-in-Charge. |
| 10 | Dismantling of cast iron pipe/ PVC drain pipes/PVC (SWR) pipe etc, 110mm jointed in cement mortar and taking out of trenches and wall, if required complete all as specified and directed. |
| 11 | Dismantling of cast iron pipe/ PVC drain pipes/PVC (SWR) pipe etc, 75mm jointed in cement mortar and taking out of trenches and wall, if required complete all as specified and directed. |
| 12 | Dismantling wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets complete, all as specified and as directed by Engr-in-charge. |
| 13 | Dismantling existing brick tiles or terracing tiles, single layer on roofs from any position grouted in cement mortar including removal of any existing treatment complete all as specified and directed by Engineer in Charge. |
| 14 | Dismantlling Mud phuska in roofs, any thickness,including plastering and leeping (whether full thickness removed or only a part thereof) in any position complete all as specified and directed by Engineer in Charge. |
| 15 | Removing excavated material distance exc. 500 m but n exc. 1.5 Km and depositing where directed at a level n exc. 1.5 m above the starting point in soft/loose soil complete all as specified. |
| 16 | Taking up or down steel tubing and connections of 15mm bore in pipe, including cleaning for re-fixing or removal from site to store complete all as specified and directed by Engineer-in-Charge. |
| 17 | Taking up or down steel tubing and connections of 20mm bore in pipe, including cleaning for re-fixing or removal from site to store complete all as specified and directed by Engineer-in-Charge. |
| 18 | Hacking out old broken glass (any thickness, size, quality or description) from metal frame including punching or drilling out old glazing pins/spring clips and providing and fixing new ones (up to 4th storey of building ) complete all as specified and directed by Engr-In-Charge. |
| 19 | Cutting chases in brick wall, pinning in, making good to facings where required and pointing in cement mortar 1:3 to ends or edges of landings, steps, cills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring etc., and making good, cutting not exc 10 cm girth and complete all as specified and directed by Engineer-in-Charge. |
| 20 | Disconnecting/dismantling existing tanks of capacity exc. 500 ltr & n. exc. 1000 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. |
| 21 | Disconnecting/dismantling existing tanks of capacity exc. 250 ltr & n. exc. 500 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. |
| 22 | Disconnecting existing tanks , setting aside (or lowering if required) for repair, cleaning, etc. and hoisting if required reconneecting and refixing in position (Cleaning repairing etc measured separately) exc 250 & n.exc 500 ltr in capacity complete all as specified |
| 23 | Disconnecting existing tanks , setting aside (or lowering if required) for repair, cleaning, etc. and hoisting if required reconneecting and refixing in position (Cleaning repairing etc measured separately) exc 500 & n.exc 1000 ltr in capacity complete all as specified |
| 24 | Cleaning and removing all scale and dirt, etc, from tanks and from mouths of circulating pipes, etc(exc 250 & nexc 500 ltr), Complete all as specified and as directed |
| 25 | Cleaning and removing all scale and dirt, etc, from tanks and from mouths of circulating pipes, etc(exc 500 & nexc 1000 ltr), Complete all as specified and as directed |
| 26 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |
| 27 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |