Name of Work:- Rate Contract for Refilling and Hydrotesting of Clean Agent fire suppression Cylinders at ERPL Patna Stations for 3 years
Sl. No.
Item Description
1
GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ.
2
Service and supply Location : PHBPL Barauni,BKPL BPS,PHBMPL LPG PS Barauni,ERPL Muzaffarpur, ERPL Patna LPG & ERPL BANKA
3
FM-200 (HFC 227ea) /NOVAC 1230 (FK5-1-12) cylinder's Dismantling & Re –Installation (Dismantling & Re –Installation shall be done in one by one basis, i.e., either main or standby bank cylinder is to be kept in line for operation at all times. Only after installation of main or Standby bank cylinder at respective site after hydrotesting and re-filling shall the other one be dismantled)Location wise Quantity ae as Follows:1.Total Quantity for PHBPL Barauni: 162. Total Quantity for BKPL Barauni Pump Station:43.Total Quantity for PHBMPL LPG PS Barauni: 34.Total Quantity for ERPL Muzaffarpur: 65.Total Quantity for ERPL Patna LPG :66.Total Quantity for ERPL Banka :6
4
Packing and transportation Charges to and fro (Bidder to lift either the main or standby bank cylinders at the first time, next cylinder(s) shall be sent after Re–Installation of first one at respective site)Location wise Quantity ae as Follows:1.Total Quantity for PHBPL Barauni: 162. Total Quantity for BKPL Barauni Pump Station:43.Total Quantity for PHBMPL LPG PS Barauni: 34.Total Quantity for ERPL Muzaffarpur: 65.Total Quantity for ERPL Patna LPG :66.Total Quantity for ERPL Banka :6
5
Shifting of FM 200/NOVAC 1230 (FK5-1-12) gas from filled & pressurised FM 200 Cylinders to another vessel and Refilling it back in FM 200 cylinder after hydrostatic testing. (Note- Vendor shall ensure that, there should not be loss of FM200/NOVAC 1230 (FK5-1-12) gas, more than 35 % of cylinder capacity. If loss is more than 35%, no extra payment will be made for the same)Note- Hydro static testing to be paid separately)Location wise Quantity ae as Follows:1.Total Quantity for PHBPL Barauni: 209 Kg2. Total Quantity for BKPL Barauni Pump Station:64 Kg3.Total Quantity for PHBMPL LPG PS Barauni:46 Kg4.Total Quantity for ERPL Muzaffarpur: 92 Kg5.Total Quantity for ERPL Patna LPG : 128 Kg6.Total Quantity for ERPL Banka : 128 Kg
6
Statutory Hydro-Static Pressure Testing and painting for all FM 200/NOVAC 1230 gas Cylinders from CCoE/ PESO Approved testing agency. Required test certificates to be issued to IOCL about successful testing and passing thetest standards of the cylinders. Hydrotesting date to be imprinted inevery cylinders after hydrotest as per PESO guidelines.Certificate to be submitted of PESO Approved testing agency.Hydrostatic testing of Cylinders in line with technical specifications including Servicing,Overhauling and Testing of Valves shall also be done.Location wise Quantity ae as Follows:1.Total Quantity for PHBPL Barauni: 92. Total Quantity for BKPL Barauni Pump Station: 23.Total Quantity for PHBMPL LPG PS Barauni: 24.Total Quantity for ERPL Muzaffarpur: 45.Total Quantity for ERPL Patna LPG : 46.Total Quantity for ERPL Banka : 4
7
Supplying & Refilling of FM-200 (HFC-227 EA) gas complying with NFPA Standard 2001 (latest) and certified FM200 clean agent in cylinders in a quantity after recovery of gas.Location wise Quantity ae as Follows:1.Total Quantity for PHBPL Barauni: 282.65 Kg2. Total Quantity for BKPL Barauni Pump Station:86.4 Kg3.Total Quantity for PHBMPL LPG PS Barauni:39.1 Kg4.Total Quantity for ERPL Muzaffarpur: 43.7 Kg5.Total Quantity for ERPL Patna LPG :108.8 Kg6.Total Quantity for ERPL Banka :108.8 Kg
8
Suply and refilling of clean-agent fire suppression fluids NOVAC 1230 (FK5-1-12) in empty cylinders and pressurized the cylinders upto 29 bar and as per OEM/codal requirment using dry Nitrogen including.Location wise Quantity ae as Follows:1.Total Quantity for PHBPL Barauni: 8.5
9
Replacement of FM-200/NOVAC 1230 gas Cylinders valve (PESO approved)with same Technical Specification Make and model against Non-repairable/Non-serviceable cylinder valve .Location wise Quantity ae as Follows:1.Total Quantity for PHBPL Barauni: 12. Total Quantity for BKPL Barauni Pump Station: 13.Total Quantity for PHBMPL LPG PS Barauni: 14.Total Quantity for ERPL Muzaffarpur: 15.Total Quantity for ERPL Patna LPG : 16.Total Quantity for ERPL Banka : 1 Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.