| 1 | Wall painting two coats with plastic emulsion paint over a coat of primer of approved shade on new work to give and even shade including cost, conveyance, taxes of all materials paint labour T&P etc. complete in all respect. Ground floor |
| 2 | First Floor |
| 3 | Wall painting two coats with weather seal coat paint over a coat of primer of approved shade on new work to give and even shade including cost, conveyance, taxes of all materials paint labour T&P etc. complete in all respect. Ground floor |
| 4 | First Floor |
| 5 | Enamel painting two coats with any approved paint over a coat of primer to wood & iron work including cost, conveyance, royalties and taxes of all materials and labour with T&P required for the work in all floors including cost of paint and primer etc. complete. Ground floor |
| 6 | First Floor |
| 7 | Dismantling old cement plaster including stacking & useful materials and the removing debries within 50m lead including cost of all labour with T&P etc. complete.Ground Floor |
| 8 | First Floor |
| 9 | 12mm thick cement plaster (1:6) finished smooth to brick work after racking out joints including watering and curing, cost, conveyance, royalties and taxes of all materials, labour with T&P required for the work etc. complete in all respect in all floors.Ground Floor |
| 10 | First Floor |
| 11 | 16mm (5/8 inch) thick cement plaster (1:6) finished smooth to brick work after racking out joints including watering and curing, cost, conveyance, royalties and taxes of all materials, labour with T&P required for the work etc. complete in all respect in all floors. Ground floor |
| 12 | First Floor |
| 13 | Finishing wall surface with acrylic wall putty (water based) of approved make and finished smooth to receive painting including cost of scaffolding, staging charges with cost & conveyance of all materials taxes labour T&P erc. Complete as directed by Engineer in Charge. Ground floor |
| 14 | First Floor |
| 15 | Supplying and fixing of Fibre ceiling to rooms including fixing of ridges valleys windties etc. including cost of all labour T & P royalties etc. required for the work as directed by the Engineer-In-Charge . |
| 16 | Supplying, fitting & fixing of M.S. Grills for window and gate with angle iron frame of approved design in proper position and making good to the damages to wall or RCC structure including mending or cutting to sizes or grooves in walls and fixing with C.C (1:2:4) with cost, coveyance, royalties and taxes of all materials with all labour, T&P required etc. complete in all floors. |
| 17 | Piasal shuue |
| 18 | Plain Cement Concrete (1:2:4) using 6mm to 18mm (1/4 inch to 3/4 inch) size (18mm not to exceed 25%) hard black broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete, watering and curing including cost of all labour T&P royalties etc. required for the work as directed by the Engineer in Charge. |
| 19 | Dismantling of Brick or stone masonary below 3.00 M height in lime cement including stacking & useful materials and the removing debries within 50m lead with all leads and lifts and all labour with T & P required for the work etc. complete in all respect. |
| 20 | Earth work in excavation of foundation in all kinds of soil including hard moorum, stoney earth, earth mixed with boulders (except sheet rock and boulders requiring blasting) with all leads and lifts for guard wall including dressing & levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour T&P required for the work etc. complete and as directed by the Engineer-in-charge. |
| 21 | Filling in foundation trenches and plinth with good river sand well watered and rammed in layers not eceeding 23cm. In depth with all leads and lifts including cost, conveyance, royalties and taxes of all materials, cost of all albour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 22 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2 inch) size clean black broken granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not excedding 15cm. (6 inch) thick to the required level, ramming, watering, curring including frame work etc. complete including cost, conveyance, royalties and taxes of all materials and labour with T&P required for the work etc. complete as directed by the Engineer-in-charge. |
| 23 | Fly Ash Brick Masonary in cement mortar (1:6) in foundation & plinth using Fly Ash bricks of 25cm x 12cm x 8cm size having a crushing not less than 35kg per Sq.Cm, including splays cutting, circular moulding, chamfering, corbelling, watering and curing including cost, conveyance, royalties, taxes of all materials and labour with T&P required for the work etc. complete in all respect in all floors. |
| 24 | Fly Ash Brick Masonary in cement mortar (1:6) in superstructure using Fly Ash bricks of 25cm x 12cm x 8cm size having a crushing not less than 35kg per Sq.Cm, including splays cutting, circular moulding, chamfering, corbelling, watering and curing including cost, conveyance, royalties, taxes of all materials and labour with T&P required for the work etc. complete in all respect in all floors. Ground floor |
| 25 | RCC of M-20 grade (equivalent to a nominal mix of proportion 1:1.5:3) as per approved designs and drawings having a minimum compressive strength (in work test) of 200kg/cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12mm to 20mm size black hard crusher broken granite chips (20mm size chips not to exceed 25%) and screened and washed sharp sand for mortar of approved quality from approved qarry to be mixed in concrete mixture including hoisting, lowering, laying and compacting concerete by using vibrators, watering and curing for 28 days, centring and shuttering then after dismantling and removing debries from the work site and finishing the exposed surface smooth including cost, conveyance, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete but excluding cost and conveyance of M.S. rods or Tor steel and binding wires of 18 to 20 guage and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position in all floors as directed by the Engineer in Charge. Column footing |
| 26 | Column Sub Structure |
| 27 | Plinth Bend |
| 28 | Supplying, cutting, straightening coiled or bent up M.S. rods or Tor steel of SAIL (HYSD Fe-415) welding or jointing if necessary, bending, binding, tying the grills and laying in position as required for RCC works and hoisting, lowering and placing in position in all floors according to approved designs and drawings including cost, conveyance, taxes of M.S. rods or Tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P etc. complete in all respect as directed by the Engineer in Charge. |
| 29 | 2.5cm (1 inch) thick grading concrete with cement (1:2:2) using 6mm & down graded size over roof slab to proper slope finished smooth, watering and curing including cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc. complete in all respect in all floors. Third floor |
| 30 | 2.5cm artificial stone flooring with cement concrete (1:2:4) including punning using 12mm size hand broken granite chips including of all cost, conveyance & taxes of all materials and labour with T&p required for the work etc. all complete in all respect as directed by the Engineer-In-Charge. |
| 31 | Dismantling and removing of doors and windows and ventilator incluidng removal of frame hinges fastening, stacking & useful materials and the removing debries within 50m lead with all leads and lifts and all labour with T & P required for the work etc. complete in all respect. |
| 32 | Supplying and fitting-fixing of Un-plasticised Poly Vinyl Chloride(UPVC) (FENESTA/NCL VEKA LTD) Casement Window with top fixed 60-Series duly Manufactured using UPVC reinforced profiles of 60mm x 55 mm x 2.5 mm for outer frames, 75mm x 60mm x 2.25mm for Casement Door Sash profile and 74mm x 60mm x 2.5mm mullion profile capable of mounting single glazing system, structurally reinforced hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear toughened glass of SAINT-GOBAIN make duly fixed With EPDM weathering seal resistant accessories like clipping locking syetem made of aluminium 1 No. , per sheet of sashes and the system is to be installed using anchor fasteners, sliicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, labour charges, materials and product conforming to ASTM D 638-14, EN-477-95 and other applicable codes and standards. (Lr. No. 16100 dtd. 08.05.2018 of EIC) Rate per 1 Sqm |
| 33 | Dismantling and removing of old tiled flooring with removing the base coarse, stacking & useful materials and the removing debries within 50m lead with all leads and lifts and all labour with T & P required for the work etc. complete in all respect. |
| 34 | Providing and laying of 80mm thick factory made cement concrete interlocking paver block of M-40 grade and approved make,variety,colour and size made by block making machine with strong vibratory compaction of approved design and shape,laid in required colour and pattern over 50mm thick compacted bed of coarse sand,filling the joints with fine sand etc. all T & P etc. complete as per direction of Engineer-in-Charge. |
| 35 | Supplying and fixing of Colour Sheet in roof drilling holes in windties including fixing of ridges valleys windties etc. including cost of all labour T & P royalties etc. required for the work as directed by the Engineer-In-Charge . |
| 36 | Supplying and fixing of Rain Water pipe including cost of all labour T & P royalties etc. required for the work as directed by the Engineer-In-Charge . |
| 37 | Labour supply for cleaning debries from the office premises including cost, conveyance, royalty, taxes of all materials labour with T&P etc. complete in all respects as directed by the Engineer in Charge. |
| 38 | Transpotation of debris by mechanical Means within 5.00 Km lead with cost and conveyance of all materials and labour with T&P required for the work and royalities etc. complete in all respect as per direction of Engineer in charge. Please Enable Macros to View BoQ information |