Foundation of 10 ton capacity fork 5486 x 2448 x 1067 mm up to the height of the frame the smaller wall of the foundation should be one and a half brick 35 cm thick and the other wall should be one brick 23 cm thick with cement and two bricks on the upper surface and one and a half bricks around the frame should be made with 1Ratio6 cement sand Including all material and labour
2
2To build a loading ramp build a retaining wall
To build a loading ramp build a retaining wall 3 meters long 4 meters long on both sides 35 cm thick and a 3 meter high front wall The foundation is 46 cm deep and the slope is sloped to a height of 12 meters filling the ground with soil All materials and labor are included
3
3A hand pump is dug up to the level of clean water and its platform
A hand pump is dug up to the level of clean water and its platform is 1 x 1point20 x 0point20 meters in size All materials and labor are included except for the tap machine and pipes
4
4Hut construction work
Hut construction work good durable thorn hut 2x2 meter including all material and labour
5
5Prepare the approach road by adding soil to the road
Prepare the approach road by adding soil to the road connecting the center s plot to the main road Including labor and soil
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.