| 1 | Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate. | Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate. |
| 2 | Replacement of 8.5 Mtrs. Long damaged Single PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. | Replacement of 8.5 Mtrs. Long damaged Single PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. |
| 3 | Replacement of 8.5 Mtrs. Long damaged Double PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. | Replacement of 8.5 Mtrs. Long damaged Double PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. |
| 4 | Replacement of 11 Mtrs. Long damaged Single ST pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. | Replacement of 11 Mtrs. Long damaged Single ST pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. |
| 5 | Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. | Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. |
| 6 | Laying, sagging stringing and binding of ACSR Insulated Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. | Laying, sagging stringing and binding of ACSR Insulated Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 7 | Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. | Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 8 | Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. | Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 9 | Laying, sagging stringing and binding of Arial Bunch Conductor 3x50x95x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual. | Laying, sagging stringing and binding of Arial Bunch Conductor 3x50x95x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 10 | Laying, sagging stringing and binding of LT PVC/XLPE Cable from T/F to Pole/Box jumpering as per RESPO manual. | Laying, sagging stringing and binding of LT PVC/XLPE Cable from T/F to Pole/Box jumpering as per RESPO manual. |
| 11 | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. |
| 12 | Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. | Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. |
| 13 | Installation of 11 DO KV Fuse Set as per RESPO Norms. | Installation of 11 DO KV Fuse Set as per RESPO Norms. |
| 14 | Making of 11 KV Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. (Work includes All labour, T&P etc. required for proper completion of work) as per RESPO Norms. | Making of 11 KV Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. (Work includes All labour, T&P etc. required for proper completion of work) as per RESPO Norms. |
| 15 | Construction of “T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work. | Construction of “T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work. |
| 16 | Chopping of Tree Branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc. | Chopping of Tree Branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc. |
| 17 | Replacement of Damaged jumpering with insulated weasel Conductor at various places. | Replacement of Damaged jumpering with insulated weasel Conductor at various places. |
| 18 | Replacement of Damaged 11 KV Feeders jumpering with Dog Conductor at various places. | Replacement of Damaged 11 KV Feeders jumpering with Dog Conductor at various places. |
| 19 | Shielding of electric pole by covering and providing Rubber pipe around the pole complete with pasting by solutiono and binding etc. Rubber matting shall be provided from the botttom of the pole up to the minimum height 8\\" ft. Required for safety purpose. It Includes coast of all material T&P carriage and Supervision charges required for proper completion of work. | Shielding of electric pole by covering and providing Rubber pipe around the pole complete with pasting by solutiono and binding etc. Rubber matting shall be provided from the botttom of the pole up to the minimum height 8\\" ft. Required for safety purpose. It Includes coast of all material T&P carriage and Supervision charges required for proper completion of work. |
| 20 | Shielding of electric pole by covering and providing Rubber pipe around the Distribution Box complete with pasting by solutiono and binding etc. Rubber matting shall be provided from the botttom of the box up to the minimum height 8\\" ft. Required for safety purpose. It Includes coast of all material T&P carriage and Supervision charges required for proper completion of work. | Shielding of electric pole by covering and providing Rubber pipe around the Distribution Box complete with pasting by solutiono and binding etc. Rubber matting shall be provided from the botttom of the box up to the minimum height 8\\" ft. Required for safety purpose. It Includes coast of all material T&P carriage and Supervision charges required for proper completion of work. |
| 21 | Carriage of Distribution Transfarmer (400KVA 02 Nos., 250KVA 03 Nos., 100KVA 04 Nos., 63KVA 04 Nos. & 16/10 KVA 01 Nos.) from store mathura to goverdhan s/s carriage of transfarmer to the site in case of transfarmer demaged within the mela area and return after Mudiya Mela From Goverdhan s/s to Store Mathura | Carriage of Distribution Transfarmer (400KVA 02 Nos., 250KVA 03 Nos., 100KVA 04 Nos., 63KVA 04 Nos. & 16/10 KVA 01 Nos.) from store mathura to goverdhan s/s carriage of transfarmer to the site in case of transfarmer demaged within the mela area and return after Mudiya Mela From Goverdhan s/s to Store Mathura |
| 22 | Installation of various capacity Distribution T/F on the Double pole/ Plinth in proper alignment and direction as per SDO/JE. Including cost of labour and T&P Carrier etc. with the help of Hydra and Tractor with Troli Including Driver and Diesel and Maintenance Gang Including T&P for Mela Perrod required for proper completion of work. | Installation of various capacity Distribution T/F on the Double pole/ Plinth in proper alignment and direction as per SDO/JE. Including cost of labour and T&P Carrier etc. with the help of Hydra and Tractor with Troli Including Driver and Diesel and Maintenance Gang Including T&P for Mela Perrod required for proper completion of work. |
| 23 | Top-up Transformer Oil with Fresh Oil. The Work including carriage of Oil Drum from store Mathura to Site of work inlcuding loading and unloading at both ends and Top- up of Transformer. | Top-up Transformer Oil with Fresh Oil. The Work including carriage of Oil Drum from store Mathura to Site of work inlcuding loading and unloading at both ends and Top- up of Transformer. |
| 24 | Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. | Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. |
| 25 | Re-sagging of loose Arial Bunch Conductor as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. | Re-sagging of loose Arial Bunch Conductor as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. |
| 26 | Providing Bamboo Sticks (Spacers) suitable for 04 wire LT Conductor XLPE Cable it include the cost of bamboo sticks, binding wire labourer, T & P carrier etc. required for completion of work. | Providing Bamboo Sticks (Spacers) suitable for 04 wire LT Conductor XLPE Cable it include the cost of bamboo sticks, binding wire labourer, T & P carrier etc. required for completion of work. |
| 27 | Providing and Fixing of Cu LT Bushing rod for 250/400 KVA T/F | Providing and Fixing of Cu LT Bushing rod for 250/400 KVA T/F |
| 28 | Providing and Fixing of Cu LT Bushing rod for 100 KVA T/F | Providing and Fixing of Cu LT Bushing rod for 100 KVA T/F |
| 29 | Providing and Fixing of Oil Seal for LT Bushing rod 250/400/100 KVA T/F | Providing and Fixing of Oil Seal for LT Bushing rod 250/400/100 KVA T/F |
| 30 | Providing and Installation of CT 400/200/5A (BHEL Make). The Work Includes carriage of CT to site of work its connections etc. as per direction by supervising engineer. | Providing and Installation of CT 400/200/5A (BHEL Make). The Work Includes carriage of CT to site of work its connections etc. as per direction by supervising engineer. |
| 31 | Providing and Installation of CT 600/300/5A (Stelmac Make). The Work Includes carriage of CT to site of work its connections etc. as per direction by supervising engineer. | Providing and Installation of CT 600/300/5A (Stelmac Make). The Work Includes carriage of CT to site of work its connections etc. as per direction by supervising engineer. |
| 32 | Providing and Installation of CT 200/100/5A (Stelmac Make). The Work Includes carriage of CT to site of work its connections etc. as per direction by supervising engineer. | Providing and Installation of CT 200/100/5A (Stelmac Make). The Work Includes carriage of CT to site of work its connections etc. as per direction by supervising engineer. |
| 33 | Providing and Fixing of Ashida Make 141a Relay as per direction by supervising engineer. | Providing and Fixing of Ashida Make 141a Relay as per direction by supervising engineer. |
| 34 | Providing and Fixing of Various Type Lugs on Different Distribution Transformersas per direction by supervising engineer. | Providing and Fixing of Various Type Lugs on Different Distribution Transformersas per direction by supervising engineer. |
| 35 | Body and Nutral Earthing of Distribution Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work. | Body and Nutral Earthing of Distribution Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work. |
| 36 | Reparing and overhauling of All 11 KV Incomming/Outgoing VCB and general overhauling of damaged 11 KV VCB/OCB installed at different 33/11 KV S/s including 33 KV Panel. The following work includes overhauling and repairing of VCB with Supply/Provoding following spare parts (Sl. No. 37,38,39,40,41,42,43,44,45 & 46):-(i) Charging Lock.(ii) On/off Indicator(iii) Complete alignment of three poles.(b) Alignmentt of complete mechanism and also includes the placement of defective components which includes dundry itmes such as charging handle, brass pins, iron pins, tripping shaft, closing shaft, tripping blade, tripping roller, brass/copper bushes, oil tank rubber & embross rubber, rack in, ran out change) etc. so as to rectify the defects for proper charging and discharging for giving good result at tripping and closing operations.(c) Cleaning and washing of three poles with bus bar by Thinner.(d) Checking and re-alignment of gap maintaining in vacuum interrupters.(e) Completely washing of trolley with Thinner.(f) Providing Insulated Paint on epoxy item i.e. Spout, vacuum chamber, Drive indulator etc.(g) General overhauling after cleaning oiling and greasing. Including Replacement of following spare parts as per requirment. | Reparing and overhauling of All 11 KV Incomming/Outgoing VCB and general overhauling of damaged 11 KV VCB/OCB installed at different 33/11 KV S/s including 33 KV Panel. The following work includes overhauling and repairing of VCB with Supply/Provoding following spare parts (Sl. No. 37,38,39,40,41,42,43,44,45 & 46):-(i) Charging Lock.(ii) On/off Indicator(iii) Complete alignment of three poles.(b) Alignmentt of complete mechanism and also includes the placement of defective components which includes dundry itmes such as charging handle, brass pins, iron pins, tripping shaft, closing shaft, tripping blade, tripping roller, brass/copper bushes, oil tank rubber & embross rubber, rack in, ran out change) etc. so as to rectify the defects for proper charging and discharging for giving good result at tripping and closing operations.(c) Cleaning and washing of three poles with bus bar by Thinner.(d) Checking and re-alignment of gap maintaining in vacuum interrupters.(e) Completely washing of trolley with Thinner.(f) Providing Insulated Paint on epoxy item i.e. Spout, vacuum chamber, Drive indulator etc.(g) General overhauling after cleaning oiling and greasing. Including Replacement of following spare parts as per requirment. |
| 37 | Female jaw contract (BHEL MAKE) | Female jaw contract (BHEL MAKE) |
| 38 | Charging Motor | Charging Motor |
| 39 | Triping Coil | Triping Coil |
| 40 | Closing Coil | Closing Coil |
| 41 | Ammeter Switch | Ammeter Switch |
| 42 | Volt Meter Swith | Volt Meter Swith |
| 43 | Copper Wire for AC wiring 4 sqmm | Copper Wire for AC wiring 4 sqmm |
| 44 | Copper Wire for DC wiring 2.5 sqmm | Copper Wire for DC wiring 2.5 sqmm |
| 45 | Hrs Fuse for VCB (Different Rating) | Hrs Fuse for VCB (Different Rating) |
| 46 | Indication Lamp for VCB | Indication Lamp for VCB |