| 1 | Earth work in excavation in ordinary soil for the construction of canal including all lead,lift and T&P etc required for proper completion of work as per direction of Engineer-in-Charge. |
| 2 | Earth work in excavation in mixed soil with lime stone, sand stone or other soft rock by pick axes but not required blasting for the construction of canal including all lead ,lift, labour and T & P etc required for proper completion of work as per direction of Engineer-in-Charge. |
| 3 | Excavating other rocks by blasting removing muck and stacking including all lift, lead upto 210 m, labour and T & P etc required for proper completion of work as per direction of Engineer-in-Charge. |
| 4 | Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 1.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work . |
| 5 | Earth filling with useful quantity of excvavated ordinary soil earth in making canal section including cost of mechanical compaction ,lead upto 210 m, lift, labour and T&P, royalty and taxes etc required for proper completion of work. |
| 6 | Site Clearence for constructing stream including all leads and lifts, labour charges, T& P etc. required for proper completion of work and its disposal as per direction of Engineer-in-charge. |
| 7 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work as per direction of Engineer-in Charge. |
| 8 | Laying C.C. 1:3:6 (M–10) in Foundation with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 9 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, with mechanical mixing and placing of concrete , royalty and all taxes etc. for proper completion of work. |
| 10 | Centering and shuttering for CC/RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work. |
| 11 | Reinforced cement concrete in M-20 with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift with mechanical mixing and placing of concrete, royalty and all taxes etc. but excluding cost of steel reinforcement for proper completion of work. |
| 12 | Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift with mechanical mixing and placing of concrete, royalty and all taxes etc. but excluding cost of steel reinforcement for proper completion of work. |
| 13 | Centering and shuttering for RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work. |
| 14 | Cutting, bending, placing and binding of steel reinforcement including cost of all material, labour, T&P, M.S. binding wire and all taxes etc for proper completion of work. |
| 15 | Providing and fixing 900mm. Dia HUME Pipe including cost of all materials, labours, T&P etc, required for proper completion of work as per direction of Engineer-in-charge. |
| 16 | Providing & Fixing NP-3 1200 mm Ø HUME PIPE including cost of hume pipe, carriage, labour, T&P etc. required for proper completion of work. |
| 17 | Earth work in back filling in back of Abutment and wing wall/Filling in embankment including all lead, lift labours, T&P, royalty and all taxes etc. for proper completion of the work. |
| 18 | Supplying and laying of local sand in back filling including cost of all materials, labours, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 19 | Laying of Stone boulder for pitching in launching apron side pitching beyond L.A. bed and pitching at side slope of earth filling over box culvert including cost of all materials labours T&P , royalty and all taxes etc required for proper completion of the work.(weight not less than 40 kg) |
| 20 | Random Rubble Masonery work in cement sand mortar (1:3) with opc 43 grade cement and coarse sand in wings wall and parapet wall including cost of all materials, labour, T&P etc required for proper completion of work. |
| 21 | Struck deep Pointing work for exposed surface of stone masonry in 1:2 CM with OPC-43 grade cement, coarse sand etc. including cost of all material, labour and T&P etc required for proper completion of work. |
| 22 | Proviniding and fixing 100mm dia PVC pipe including cost of all material, labours, T&P, etc. required for proper completion of the work. |
| 23 | Dewatering of Foundation by hiring diesel pump 5 HP/Electric motor of same capacity including operator cost, cost of dewatering equipment and its accessories, labour etc. |
| 24 | Earth work In making drain diversion work to facilitate proposed work on site properly with manual compaction including cost of all lead, lift, labour, T&P, taxes etc. for proper completion of the work. |
| 25 | Earth work in making Road diversion work to facilitate proposed work on site properly including all labours, T&P, taxes etc. for proper completion of the work. |
| 26 | Earth work in excavation in all type of soil for channelization of Nala/drain including all lead & lifts proper compaction and disposal including dewatering if required as per direction of Engineer-in-charge. |
| 27 | Earth work In removal and disposal of road diversion including all labours, T&P, etc. for proper completion of the work..As directed by Engineer -in-charge |
| 28 | Supplying and laying of stone grit 4.75-10mm including cost of all material, labour, lead and lift, T&P, taxes etc. for proper completion of the work. |
| 29 | Supplying and laying of stone grit 10-20mm including cost of all material, labour, lead and lift, T&P, taxes etc. for proper completion of the work.. |
| 30 | Providing and fixing joint filler board (18mm. Thick) including cost of all material, labour, T&P etc. required for proper completion of work. |
| 31 | Providing and fixing of PVC water stop seal 225 mm. wide including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work. |
| 32 | Providing and fixing of G.P. Sheet seal of 22 SWG 300mm. wide including cost of all materials, labour, T&P, cutting, bending, brazing, crimping etc. required for proper completion of work. Please Enable Macros to View BoQ information |