| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Demolishing R.C.C. Work manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 7 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. |
| 9 | Removal of mulba from site of work to beyond muncipal Muncipal limits including loading unloading complete +hd load |
| 10 | Carriage of material by M.T of side including loading unloading complete Sand 10 Km+Stone Agg 10 Km+ 200mtr head load |
| 11 | Engaging Labours of Clearance of Site, Sewers, Bush cutting etc. |
| 12 | providing and fixing of Inaugration of Name Plate including Pedstal all complete job Please Enable Macros to View BoQ information |