| 1 | Earth work in excavation of foundation in all kinds of soil with all leads and lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area etc. complete as directed E.I.C. |
| 2 | Providing sand filling foundation and plinth including watering and ramming etc. complete with all cost, conveyance, royalties, taxes and cess with all labour and T&P etc. complete as per direction of Engineer-in-Charge. |
| 3 | Providing cement concrete (1:3:6) mix with 40mm nominal size C.B. stone aggregate in foundations upto a depth of 1.50 m. below ground level and upto a height of 1.50m. above ground level / bed level including cost and conveyance of all materials to site and all labour charges complete as per direction of E.I.C. |
| 4 | Plain cement concrete (1:2:4) nominal mix as per Drawing and Technical Specification complete as per direction of E.I.C. |
| 5 | RCC M-20 Grade with 20mm and down graded black hard granite crusher broken stone chips etc complete including hoisting and laying etc. complete as per direction of Enginee-in-Charge. G.F.-Coloum base & Foundation |
| 6 | G.F.Column & Beams |
| 7 | G.F.Plinth Beams |
| 8 | G.F.Lintel |
| 9 | G.F.RCC Chajja |
| 10 | G.F.Roof Beam |
| 11 | G.F.Roof Slab |
| 12 | G.F.Stair Case Room |
| 13 | F.F -Column |
| 14 | F.F.-RCC Chajja |
| 15 | F.F.-Roof Beam |
| 16 | F.F.-Roof Slab |
| 17 | Supplying, cutting, bending, straightening, placing & binding of uncoated HYSD bar reinforcement complete as per drawing and technical specification etc. complete as per direction of Engineer-in-Charge. Ground Floor |
| 18 | First Floor |
| 19 | 2.5 cm thick grading concrete (1:2:2) on roof slab with 6.7mm & down grades size hard granite crusher broken chips on new work in Ground Floor |
| 20 | Fly Ash Brick masnory with Fly Ash Bricks of size 25cm x 12cm x 8cm in Cement Mortar (1:6) in Foundation & Plinth etc. complete with all cost, conveyance, royalties, taxes and cess with all labour and T&P etc. complete as per direction of Engineer-in-Charge. Foundation & Plinth |
| 21 | Super Structure ( G.F ) |
| 22 | Super Structure ( F.F ) |
| 23 | 12mm Cement Plaster ( 1:6) for Brick work including all charges etc. complete as per direction of Engineer-in-Charge. Ground Floor |
| 24 | First Floor |
| 25 | 16mm Cement Plaster (1:6) for Brick work including all charges etc. complete as per direction of Engineer-in-Charge.Ground Floor |
| 26 | First Floor |
| 27 | Supplying ,fitting , fixing up windows (sliding type) made up aluminium section 151-154, 151-155 as windows frame section No. 151-155, 151-153 and 151-167 as shutter framed with 5mm thick black glass as panel fitted with rubber beading including looking arrangement including all fitting with cost of materials all taxes labour T&P etc. Completed as per direction Engineer in charge. |
| 28 | Supplying, fitting, fixing MS door & window shutter with of approved quality and design etc. complete with all cost, conveyance, royalties, taxes and cess with all labour and T&P etc. complete as per direction of EIC |
| 29 | Providing, fitting and fixing of Al door with anodized Al. door section of 9202 as vertical member, 9201 as top and 9200 as middle and bottom member with frame section No.9221 and tapered clip no. 4660 and the frame to be completed by means of jointing angle no. 1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges , etc. complete as per direction of the Engineer-in-charge (Top half glass & bottom half of Board) |
| 30 | Providing, Fitting & Fixing of 8 mm. to 12mm. thick Vitrified Tile ( of size 600m.m x 600 m.m ) or equivalent make of printed series confirming to IS specifications having minimum breaking strength 1400 kg/sq.cm in flooring in all floors at all heights on 20mm thick bed of cement mortar(1:4) to proper slope, line and level including cutting to required size and shape, fixing at corners and splays etc. including filling the joints with silicon sealant to match the shade of Vitrified Tile as per the design & drawing including cost, conveyance, loading, unloading, stacking,royalties and taxes of all materials, cost of all labour, T & P, sundries, watering & curing etc. required for the work complete in all respect as directed by the Engineer-in-Charge. |
| 31 | Providing vitrified tile flooring using Vitrified tiles of premium grade having thickness of 8 to 10mm conforming to IS 13756 of 600mmX600mm colour/printed series (homogeneous) of approved quality,colour or equivalent in dados & skirting on 12mm thick bed of cement mortar of mix (1:3) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with required quantities of pigments of approved marks to match the shades of the vitrified tile if required watering and curing for 21 days including cost,conveyance,loading,unloading,royalties and taxes of all materials,cost of all labour,sundries,T & P required for the work complete in all respect as directed by the Engineer-in-charge. |
| 32 | Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials labour T & P etc. as per direction of Engineer -In -charge. Ground Floor |
| 33 | First Floor |
| 34 | Wall painting two coats to walls with weather coat paint of approved shade to give an even shade including cost of paint per 1 sqm. etc. complete as per direction of Engineer-in-Charge.Ground Floor |
| 35 | First Floor |
| 36 | Providing Distempering two coats to walls with distemper of approved shade on new work to give an even shade including cost of distemper etc. complete as per direction of Engineer-in-Charge. Ground Floor |
| 37 | First Floor |
| 38 | Painting two coats with approved Enamel Paint on wood work and Steel work . Ground Floor |
| 39 | First Floor Please Enable Macros to View BoQ information |