| 1 | PART-A (Bldg.) |
| 2 | 26.11 P & F 3 Speed rotary switch for Desert Cooler complete with testing etc as required. |
| 3 | 26.12P & Replacement of M.S. Shaft of fan motor for Desert Cooler/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 4 | 26.14P & F of stud with nuts and washer for Desert Cooler/ exhaust fan.All the scrap material should be retained by the contractor. |
| 5 | 26.15Servicing and overhauling of 20\\" sweep desert cooler including oiling, greasing, painting of tank from inside with rubber paint after properly desmantling each assembly and refixing the same as required. |
| 6 | 26.16Painting of desert cooler with two coats of rubber paint inside of water tank and two coat of synthetic enamelled paint on both side of cooler body, fan body, grills etc.after cleaning with sand paper, complete in all respect as required. |
| 7 | 26.17Replacement of cooler pads (heavy) set of 3 no. of size 25\\" x 27\\" |
| 8 | 26.18P & F Brass float valve of weighing approx. 250 gm, 8\\" long rod,PVC ball of 4\\" dia. For desert coler as required. |
| 9 | 26.19P & F adjustable M.S.grill 20/22 gauge of size approx. 24\\" x 26\\" including painting etc. as required. |
| 10 | 26.20P & F aluminiun blade for 20'' desert cooler fan as required. |
| 11 | 26.21P & F outer/inner threaded PVC nipple 1/2\\" dia and 2\\" long |
| 12 | 26.22P & Replacement of pvc pipe of 1/2\\" size for vertical pump of desert cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 13 | 26.25P & replacement of 4 nos. supporting legs of 20'' fan motor with rubber pads of desert cooler as required.Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 14 | 26.26P & replacement of high quality pvc distribution ' T 'and 3 no. elbow for cooler |
| 15 | 26.28.1Labour Charges for fixing of desert cooler in windows including handling of cooler upto desired location, making electrical/water connections, testing etc. as required.on groud floor |
| 16 | 26.30P & F of submercible pump set suitable for 18/24 \\"Desert coolers. |
| 17 | 26.32.1P & F fan motor suitable for 20\\" desert cooler including making connection testing etc. as required.with copper winding Motor ISI Marked |
| 18 | 26.38Rewinding of motor of desert cooler fan with super enamelled copper wire, 'E ' class insulation material including removing,refixing,testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 19 | 4.1.8Supplying and drawing FR PVC insulated & unsheathed flexible copper conductor as per PWD specification for electrical Works with ISI marked (IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made from 99.90 % purity copper, class 5 stranding in acc. to IS:8130/IEC 60228 for lower watt loss , oxygen free for less chances of oxidization, insulation PVC type A/C/D , flame retardant as per IS 10810-53, better amperage rating as per IS:3961 part 5, in existing surface or recessed PVC/ MS conduit/casing capping making connections with Copper Lugs of suitable size, Ferrules,testing etc. as required. OEM Must have its own in house NABL lab setup for all testing facilities for wires. For additional technical parameters of product / work refer Annexure 'A' attached with this BSR 3 x 2.5 sq.mm |
| 20 | 7.14Providing & Fixing of ISI marked (IS:1293) 6 amp unbreakable 3 pin plug top having lamp indicator with CM/L no. printed and made out from industrial grade Polycarbonate or fire resistant ABS material, brass terminal including making connection testing etc. as required. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 21 | Structural steel work riveted or bolted in built up sections, trusses and frammed work, including cutting, hosting (height upto 10m), fixing in position and applying a priming coat of approved steel primer all complete. (9.2) |
| 22 | 2.11.2P&F ball cock with rod & PVC ball complete brass wt. not less than400gm 20mm |
| 23 | (5.8.3) Half brick masonry in Superstructure, using bricks of designation 75 in CM 1:6 upto third storey. |
| 24 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish:(A) 20mm thick. (12.3.3) |
| 25 | 2.13.1P&F 15mm dia connection pipe of approved quality/make PVC pipe with C.P. brass nuts upto length 300mm. |
| 26 | PART- B (Item Rate Basis) |
| 27 | P/F of cooler water tank approx size 0.65x0.65x0.28 m in existing cooler. Dismantling of existing of water tank carefully at various offices fixing of new tank by suitable means inlcuding spray painting on both sides labour T&P transportation of same tanks with 22 SWG sheet for tank complete as per direction of Engineer in charges. |
| 28 | S&F of one side panel for a complete cooler for required all labour T&P material etc, spray painting on both sides etc. complete as per direction of Engineer in charges panels size approx 0.55 x 0.65 m |
| 29 | P&F of cooler top approx size 0.65x0.65x0.05 in existing cooler, dismantling of existing of cooler top by suitable means including labour T&P spray paniting on both sides including removing & refixing of cooler labour charges transportation with 22 SWG sheet for top complete as per direction of Engineer in charges. Please Enable Macros to View BoQ information |