| 1 | M&L for Dismantling and removing defective fins of FRP type cooling tower and supply and fixing new PVC fins brick containing suitable for existing cooling tower system, eleven layers size of brick 600 mm x 300 mm x 150 mm complete all as specified and directed. |
| 2 | M&L for dismantling and removal of old unserviceable motor and Supply and fixing in replacement of cooling tower fan motor with long shaft,flange mounted (induction motor) of capacity 2/2.5 HP, 415 V as per site conditions/suitable and incl providing necessary shaft key,shaft,nuts,bolts and wahsers complete all as specified and directed. Note- Old u/s motor to be deposite in AGE E/M store.(Note: The arrangement of men power,T&P, settings shall be contractors responsibility) |
| 3 | M&L for dismantling and removal of old unserviceable motor and Supply and fixing in replacement of cooling tower fan motor with long shaft,flange mounted (induction motor) of capacity 3 HP, 415 V as per site conditions/suitable and incl providing necessary shaft key,shaft,nuts,bolts and wahsers complete all as specified and directed. Note- Old u/s motor to be deposite in AGE E/M store.(Note: The arrangement of men power,T&P, settings shall be contractors responsibility) |
| 4 | M&L for dismantling and removal of old unserviceable motor and Supply and fixing in replacement of cooling tower fan motor with long shaft,flange mounted (induction motor) of capacity 5 HP, 415 V as per site conditions/suitable and incl providing necessary shaft key,shaft,nuts,bolts and wahsers complete all as specified and directed. Note- Old u/s motor to be deposite in AGE E/M store.(Note: The arrangement of men power,T&P, settings shall be contractors responsibility) |
| 5 | M&L for dismatling and removal of old uservieable cooling tower alluminium fan hub 38 mm bore assembly with 4 blades with connected clamps and connected accessories nuts, bolts and washers. S & F new cooling tower alluminium fan hub 38 mm bore assembly with 4 blades as per site requirement wih all connected accessories,uts,bolts and washers complete all as specified and directed. Note- Old u/s fan hub to be deposite in AGE E/M store (Location 9 ESR KTA area) (Note: The arrangement of men power,T&P, settings shall be contractors responsibility) |
| 6 | Opening of shell and tube condensor end covers for inspection, pressure testing for leakage detection of condensor and identification of leakage, arresting the same with brazing, pressure testing after repairs, reassembling of end covers including cost of rubber gasket and making water connections, testing and commissioning to the entire satisfaction of Engineer-in-charge complete all as specified. (Note: The arrangement of men power,T&P, Nitrogen gas,welding eqpts shall be contractors responsibility) |
| 7 | Servicing and Survey/Audit of central AC Plants by authorised OEM Service Engineer for Central AC plants/ Package type AC plants / Walking cooler (Cold Room Systems)/Chillers/Central AC plant Compressors/Mother board circuits/VFDs/Cooling towers/condensor uits/sensors/AHU units(At all plants) etc for complete techical audit in each quarterly inspections and corrective repairs /technical requirements/spare parts analisation and replacemet of burnt/damaged /unsv spare parts and rectifing troubles / offroad rectifications in the stipulated time period by OEM authorised Engineer ( Blue Star/Carrier/ACCEL as per site OEM requirement) Complete all as specified and directed. Note:1 . Checking the all AC plants by the authorised OEM service Engineer and Technicians making a complete survey report aganist AC plant/Eqpt for our records duly signatured by him.2. Spare parts will be measured and paid separately. |
| 8 | M&L for preparation of old surface by scraping and smoothing the surface with water emery paper and painting with approved colour of synthetic enemelled paint of two coat over a coat of primer red oxide and writing letters/numbers(SM/MES Nos.) of Compressor with motor, foundation frame, including foundation of A/c plants of capacities 30 to 33 TR and cleaning the surrounding area up to three metre out side area of the plant by cutting grasses and surface dressing including white wash of plantroom complete all as specified and directed by Engineer in charge.(Note: The arrangement of men power,T&P and necessary items shall be contractors responsibility) |
| 9 | All as per item No 08 above but Condenser assembly of AC plant of capacity 30 to 33 TR. |
| 10 | All as per item No 08 above but Condenser water pump with motor, foundation frame and including foundations, rubber washers,glands, nuts, bolts and washers of AC plant of capacity 30 to 33 TR |
| 11 | All as per item No 08 above but exposed water circulation and gas circulations pipe lines including marking direction of flow of AC plant of capacity 30 to 33 TR. |
| 12 | All as per item No 08 above but Cooling tower cleaning with proper cleaning agents twise in the contract period without any damages in cooling towers complete of AC plant of capacity 30 to 33 TR |
| 13 | All as per item No. 08 above but for 22/30 TR capacity A/C plant complete all as specified and directed as Compressor with motor, foundation frame including foundation. |
| 14 | All as per item No 08 above but Condenser assembly of AC plant of capacity 22/30 TR. |
| 15 | All as per item No 08 above but Condenser water pump with motor, foundation frame and including foundation rubber washers,glands, nuts, bolts and washers of AC plant of capacity 22/30 TR. |
| 16 | All as per item No 08 above but Exposed water circulations and gas circulates pipe lines including marking direction of flow of AC plant of capacity 22/30 TR. |
| 17 | All as per item No 08 above but Cooling tower complete of AC plant of capacity 22/30 TR. |
| 18 | M&L for replacement of cast iron sluice valve with stainless steel spindles with flanged ends duly ISI marked confirming to IS 780 part1, PN 1 type complete suitable as per exiting AC plant for the 100 MM bore sizes complete all as specified and directed. |
| 19 | All as per item No 18 above but 80 MM bore |
| 20 | All as per item No 18 above but 65 MM bore |
| 21 | Taking down old unsv butterfly valve from existing location and supply and fixing new butterfly valve of size 100 mm dia and including necessary pipe fittings nuts,bolts,washers and rubber washers etc complete all as specified and directed. |
| 22 | All as per item No.21 above but size 80 mm dia. |
| 23 | All as per item No.21 above but size 65 mm dia. |
| 24 | All as per item No.21 above but size 50 mm dia. |
| 25 | Taking down old unsv Non return valve from existing location and supply and fixing new non return valve of size 100 mm dia and including necessary pipe fittings, nuts,bolts,washers and rubber washers etc complete all as specified and directed. |
| 26 | All as per item No.25 above but size 80 mm dia. |
| 27 | All as per item No.25 above but size 65 mm dia. |
| 28 | All as per item No.25 above but size 50 mm dia. |
| 29 | Taking down old unsv Non return butterfly valve from existing location and supply and fixing new non return butterfly valve valve of size 100 mm dia and including necessary pipe fittings, nuts,bolts,washers and rubber washers etc complete all as specified and directed . |
| 30 | All as per item No.29 above but size 80 mm dia. |
| 31 | All as per item No.29 above but size 65 mm dia. |
| 32 | All as per item No.29 above but size 50 mm dia. |
| 33 | Taking down old unsv pipe line from existing loaction and supply and fixing new MS ERW heavy duty pipe of size 100 mm dia with fittinmgs and including providing necessary fabrication,welding work and accessories nuts,bolts and washers complete all as specified and directed. |
| 34 | All as per item No.33 above but size 80 mm dia. |
| 35 | All as per item No.33 above but size 65 mm dia. |
| 36 | All as per item No.33 above but size 50 mm dia. |
| 37 | Taking down old unsv pipe line from existing loaction and supply and fixing new GI heavy duty pipe of size 100 mm dia with fittings and including providing necessary fabrication,welding work and accessories nuts,bolts and washers complete all as specified and directed. |
| 38 | All as per item No.37 above but size 80 mm dia. |
| 39 | All as per item No.37 above but size 65 mm dia. |
| 40 | All as per item No.37 above but size 50 mm dia. |
| 41 | All as per item No.37 above but size 40 mm dia. |
| 42 | All as per item No.37 above but size 32 mm dia. |
| 43 | All as per item No.37 above but size 25 mm dia. |
| 44 | Taking down old unsv gate valves from existing loaction and supply and fixing new gate valve of size 100 mm dia with necessary accessories nuts,bolts and washers complete all as specified and directed. |
| 45 | All as per item No.44 above but size 80 mm dia. |
| 46 | All as per item No.44 above but size 65 mm dia. |
| 47 | All as per item No.44 above but size 50 mm dia. |
| 48 | All as per item No.44 above but size 25 mm dia. |
| 49 | Taking down old unsv strainer for suction from existing loaction and supply and fixing new strainer of size 150 mm dia with necessary accessories nuts,bolts and washers complete all as specified and directed. |
| 50 | All as per item No.49 above but size 100mm dia. |
| 51 | M&L for dismantling and removal of old unserviceable chilled water tank and S & F in replacement of chilled water storage tank stainless steel with installation for AC plant as per existing size and specification complete all as specified and directed. |
| 52 | M&L for dismantling and refixing after proper alignment with & including providing new belt,nut bolt and fixing accessories for fan & motor of cooling tower of AC plant complete all as specified and directed. |
| 53 | S&F in replacement blower shaft both end bearing with casing self revolving type NTN P-207 as per existing complete all as specified and directed by EIC |
| 54 | Supply and fixing in replacement cooling tower fan with hub as per sample/suitable for 60/70/80 TR of existing size as directed by Enigneer-in-charge. |
| 55 | M&L for dismantling and removal of old unserviceable motor and S & F in replacement of blower motor of capacity 20 HP, 415 V with installation for AC plant as per existing specification and conditions complete all as specified and directed. Note- Old u/s motor to be deposite in AGE E/M store. |
| 56 | Supply and charging refrigerant gas R-22 complete all as specified and directed. |
| 57 | Taking out / purging of refrigerant gas from the system of A/c plant 1 x 30/33 TR capacity carrying out vacuum test by vacuuming the whole A/c plant with the help of vacuum pump and checking the complete system for leakages. Carrying out the pressure test by charging the nitrogen gas in the system and checking of any leakage point , repair / rectification of the same and removing the nitrogen gas from the system and charging of refrigerant gas including charging of additional gas as required and complete all as specified and directed. (Note: The arrangement of men power,T&P and Nitrogen gas shall be contractors responsibility) |
| 58 | All as per item No. 57 above for 1 x 12.5/22 TR unit of A/c plant, complete all as specified and directed. |
| 59 | S & F in repairs thermostat expansion valve suitable for 12.5 to 33 TR complete all as specified and directed. |
| 60 | S & F in repairs water temparature sensor suitable for 12.5 to 33 TR complete all as specified and directed. (Make: as per existing model and make or suitable any other approval ) |
| 61 | M&L for dismantling and removal of old unserviceable condensor coil and S&F in replacement condensor coil for 5.5 TR capacity condensor as per existing site requirement for package type AC plant complete all as specified and directed. |
| 62 | Supply and fixing in replacement of liquid line stainer filter for SMC-6-65/SMC-4-100 complete all as specified and directed. |
| 63 | Supply and charging of compressor oil complete all as specified and directed. |
| 64 | M&L for dismantling and removal of old unserviceable motor with pump and S&F in replacement monoblock pump motor of capacity 10 HP, 415 V as per site requirement and conditions for AC plant complete all as specified and directed and Old u/s pump motor to be deposite in AGE E/M store. (Note: The arrangement of men power,T&P, settings shall be contractors responsibility) |
| 65 | M&L for descaling of the entire water circulating system for central AC plant water cooled of capacity upto 3 x 33 TR along with condensers, cooling tower/piping pumps etc. Opening condenser by disconnecting nut bolts and cleaning with MAIC descaling solution with help of descaling pump/wire brush, cleaning rod etc circulating above solution in condenser pipe lines as required time, flushing out the complete solution from condensers pipe line by fresh water with pressure. Re-assembling by replacement of unserviceable nut bolts washers gaskets etc all as specified and directed. Note:- cleaning and descaling shall be carried out by pump with acid as required to keep head pressure within safe limit. If any damage during cleaning/descaling repair shall be carried out by contractor without any extra cost. (Note: The arrangement of men power,T&P, settings by mechanic shall be contractors responsibility) |
| 66 | M&L for clean the filter & cooling coil, gas leakage testing and electrical fault detection of any kind for package type AC plant of capacity 4.5/5 TR complete all as specified and directed. |
| 67 | M&L for clean the filter & cooling coil, gas leakage testing and electrical fault detection of any kind for package type AC plant of capacity 10/13.5 TR complete all as specified and directed. |
| 68 | Checking of air conditioning plant water cooled any size , capacity and location for functioning of motors, condenser , blower fan motors , unusual noise, refrigerant standing pressure and nut bolt washers etc including testing for smooth functioning and inform Engr in Charge for repair if required complete all as directed by Engr-in-charge. (Note: The arrangement of men power,T&P, settings by mechanic shall be contractors responsibility) |
| 69 | S&F in repair fan belt No C-112 complete all as specified and directed, |
| 70 | S&F in repair fan belt No B-86 complete all as specified and directed. |
| 71 | S&F in repair fan belt No B-84 complete all as specified and directed. |
| 72 | S&F in repair fan belt No C-108 complete all as specified and directed. |
| 73 | S&F in repair fan belt No B-66 complete all as specified and directed. |
| 74 | S&F in repair AHU V belt No B-104 complete all as specified and directed. |
| 75 | S&F in repair fan belt No PB82B complete all as specified and directed. |
| 76 | S&F in repair AHU Air filter 20 micron of size 20''x20''x2'' complete all as specified and directed |
| 77 | Dismantling complete ACCEL Compressor set Model SMC-4-65 of 30 TR Cap and overhauling the compressor with repair and checking of wornout holes of studs and providing over size studs with nuts & washers and gaskets . Rematlling and balancing of piston, replacement of piston ring,scrapper ring, split pin, castle nut, connecting rod bolt ,bushing for piston pin, and set of sealing ring of compressor and refitting the same after the repair/replacement duly all as specified and tested for smooth functioning of model SMC-4-100 complete all as specified and directed by Engr-in-charge. (Note-1:The all spare parts are measured and paid separately in relevent items) (Note-2: The arrangement of men power,T&P, settings by mechanic and testing shall be contractors responsibility) |
| 78 | S&F in repair for compressor set Model No SMC-4-65 suction valve ring plate 1.2mm |
| 79 | S&F in repair for compressor set Model No SMC-4-65 Discharge valve ring plate 1.20mm |
| 80 | S&F in repair for compressor set Model No SMC-4-65 Safty valve assembly |
| 81 | S&F in repair for compressor set Model No SMC-4-65 connecting rod bolt |
| 82 | S&F in repair for compressor set Model No SMC-4-65 Castle nut |
| 83 | S&F in repair for compressor set Model No SMC-4-65 Split pin |
| 84 | S&F in repair for compressor set Model No SMC-4-65 Half section of BRG STD |
| 85 | S&F in repair for compressor set Model No SMC-4-65 Bushing with collar STD |
| 86 | S&F in repair for compressor set Model No SMC-4-65 Shaft seal including 10 A-G |
| 87 | S&F in repair for compressor set Model No SMC-4-65 Piston with pin and rings |
| 88 | S&F in repair for compressor set Model No SMC-4-65 Piston ring |
| 89 | S&F in repair for compressor set Model No SMC-4-65 Scrapper ring |
| 90 | S&F in repair for compressor set Model No SMC-4-65 Bushing for piston pin |
| 91 | S&F in repair for compressor set Model No SMC-4-65 Valve spring |
| 92 | S&F in repair for compressor set Model No SMC-4-65 Spring for unloading ring |
| 93 | S&F in repair for compressor set Model No SMC-4-65 Set of Gasket ASL-1453 |
| 94 | S&F in repair for compressor set Model No SMC-4-65 Set of sealing ring |
| 95 | S&F in repair for compressor set Model No SMC-4-65 Set of Neoprene O ring |
| 96 | S&F in repair for compressor set Model No SMC-4-65Cylinder W/O suction valve (R-22) |
| 97 | S&F in repair for compressor set Model No SMC-4-65 Gasket F-10 |
| 98 | S&F in repair for compressor set Model No SMC-4-65 Gasket F-12 |
| 99 | S&F in repair for compressor set Model No SMC-4-65 Seeger ring |
| 100 | S&F in repair for compressor set Model No SMC-4-65 Gasket B-05 |
| 101 | S&F in repair for compressor set Model No SMC-4-65 Gasket L-17 |
| 102 | S&F in repair for compressor set Model No SMC-4-65 Liquid line stainer (R-22) |
| 103 | S&F in repair for compressor set Model No SMC-4-65 Pilot control solenoid valve |
| 104 | S&F in repair for compressor set Model No SMC-4-65 Expansion valve |
| 105 | S&F in repair for compressor set Model No SMC-4-65 Hand shut off valve |
| 106 | S&F in repair shaft seal assembly of compressor of ACCEL make Model SMC-4-65 complete all as specified and directed |
| 107 | Dismantling complete ACCEL Compressor set Model SMC-4-100 of 33 TR Cap and overhauling the compressor with repair and checking of wornout holes of studs and providing over size studs with nuts & washers and gaskets . Rematlling and balancing of piston, replacement of piston ring,scrapper ring, split pin, castle nut, connecting rod bolt ,bushing for piston pin, and set of sealing ring of compressor and refitting the same after the repair/replacement duly all as specified and tested for smooth functioning of model SMC-4-100 complete all as specified and directed by Engr-in-charge. (Note-1:The all spare parts are measured and paid separately in relevent items) (Note-2: The arrangement of men power,T&P, settings by mechanic and testing shall be contractors responsibility) |
| 108 | S&F in repair for compressor set Model No SMC-4-100 suction valve ring plate 1.2mm |
| 109 | S&F in repair for compressor set Model No SMC-4-100 Discharge valve ring plate 1.20mm |
| 110 | S&F in repair for compressor set Model No SMC-4-100 Safty valve assembly |
| 111 | S&F in repair for compressor set Model No SMC-4-100 connecting rod bolt |
| 112 | S&F in repair for compressor set Model No SMC-4-100 Castle nut |
| 113 | S&F in repair for compressor set Model No SMC-4-100 Split pin |
| 114 | S&F in repair for compressor set Model No SMC-4-100 Half section of BRG STD |
| 115 | S&F in repair for compressor set Model No SMC-4-100 Bushing with collar STD |
| 116 | S&F in repair for compressor set Model No SMC-4-100 Shaft seal including 10 A-G |
| 117 | S&F in repair for compressor set Model No SMC-4-100 Piston with pin and rings |
| 118 | S&F in repair for compressor set Model No SMC-4-100 Piston ring |
| 119 | S&F in repair for compressor set Model No SMC-4-100 Scrapper ring |
| 120 | S&F in repair for compressor set Model No SMC-4-100 Bushing for piston pin |
| 121 | S&F in repair for compressor set Model No SMC-4-100 Valve spring |
| 122 | S&F in repair for compressor set Model No SMC-4-100 Spring for unloading ring |
| 123 | S&F in repair for compressor set Model No SMC-4-100 Set of Gasket ASL-1453 |
| 124 | S&F in repair for compressor set Model No SMC-4-100 Set of sealing ring |
| 125 | S&F in repair for compressor set Model No SMC-4-100 Set of Neoprene O ring |
| 126 | S&F in repair for compressor set Model No SMC-4-100 Cylinder W/O suction valve (R-22) |
| 127 | S&F in repair for compressor set Model No SMC-4-100 Gasket F-10 |
| 128 | S&F in repair for compressor set Model No SMC-4-100 Gasket F-12 |
| 129 | S&F in repair for compressor set Model No SMC-4-100 Seeger ring |
| 130 | S&F in repair for compressor set Model No SMC-4-100 Gasket B-05 |
| 131 | S&F in repair for compressor set Model No SMC-4-100 Gasket L-17 |
| 132 | S&F in repair for compressor set Model No SMC-4-100 Liquid line stainer (R-22) |
| 133 | S&F in repair for compressor set Model No SMC-4-100 Pilot control solenoid valve |
| 134 | S&F in repair for compressor set Model No SMC-4-100 Expansion valve |
| 135 | S&F in repair for compressor set Model No SMC-4-100 Hand shut off valve |
| 136 | S&F in repair shaft seal assembly of compressor of ACCEL make Model SMC -4-100 complete all as specified and directed |
| 137 | S & F in repair of Sprinkler system for cooling tower complete all as specified and directed. |
| 138 | S&F in repair shaft seal assembly SMC 6-65 complete all as specified and directed |
| 139 | M&L in repairs to the cooling tower of 2 x 30/33 TR capacity by replacing the rusted GI wire mesh of existing gauge and weight of size 1.075Mx0.60x04 Nos with clamps, nuts and bolts etc complete all as specified and directed. |
| 140 | S&F in replacement fresh air grill of size 600mmx350mm having wire mesh, closing/opening dampers of suitable size with handle of PGI sheet of 20 gauge complete all as specified and directed. |
| 141 | S & F in replacement of Battery 12Volt 180 AH with initial charging maintenance free suitable for DG Sets complete all as specified and directed. |
| 142 | S & F in replacement of Battery 12Volt 150 AH with initial charging maintenance free suitable for DG Sets complete all as specified and directed. |
| 143 | Supply and charging refrigerant gas R-404/R-407, complete all as specified and directed. |
| 144 | Dismantling the power supply of electric motor any type including dismantling from pump and taking to workshop with necessary transportation and opening the complete motor and rewinding the rotor with super enameled copper wire as per the existing gauge with necessary insulation, sticks and varnishing, including replacement of shaft bearing 02 Nos complete of capacity 20 to 30 HP complete all as specified and directed. (Note-1: The arrangement of men power,T&P, transport and testing shall be contractors responsibility) |
| 145 | All as per item No.144 above but of capacity 5 to 7.5 HP electric motor any type complete all as specified and directed. |
| 146 | All as per item No. 144 above but of capacity 10 to 15 HP electric motor any type complete all as specified and directed. |
| 147 | All as per item No.144 above but 1 to 3 HP electric motor any type complete all as specified and directed. |
| 148 | Dismantling complete Centrifugal /Mono Block pump set of any type and overhauling the pump re-threading of wornout holes of studs and providing over size studs with nuts & washers. Rematlling and balancing of shaft, replacement of gunmetal bush bearing and gland packing,nuts,bolts,washres,rubber gaskets of pump set. and refitting the same after the repair/replacement duly all as specified and tested for smooth functioning of capacity 10 to 15 HP complete all as specified and directed.(Note-1: The arrangement of men power,T&P, transport and testing shall be contractors responsibility) |
| 149 | All as per item No 148 above but capacity 5 to 7.5 HP complete all as specified and directed. |
| 150 | M&L for clean the fins & tank with acid/bleaching powder, tightening of nut bolt and clean the strainer of cooling tower of AC plant of any capacity complete all as specified and directed. |
| 151 | Supply and fixing in replacement of MCB 32 Amp TPN AC, 415 volts, 10 KAs complete all as specified and directed. |
| 152 | Supply and fixing in replacement of MCB 40 Amp TPN AC, 415 volts, 10 KA s complete all as specified and directed. |
| 153 | Supply and fixing in replacement of MCB 25 Amp TPN AC, 415 volts, 10 KA s complete all as specified and directed. |
| 154 | Supply and fixing in replacement of MCB 10 Amp TPN AC, 415 volts, 10 KA s complete all as specified and directed. |
| 155 | Supply and fixing in replacement of MCB 63 Amp TPN AC, 415 volts, 10 KA s complete all as specified and directed. |
| 156 | Supply and fixing in replacement of moulded case circuit breaker panel mounting type , AC, 415 volts,16 KA of capacity 63amps 4 pole complete all as specified and directed. |
| 157 | Supply and fixing in replacement of moulded case circuit breaker panel mounting type , AC, 415 volts, 25 KA of capacity 100 amps 4 pole complete all as specified and directed. |
| 158 | Supply and fixing in replacement of moulded case circuit breaker panel mounting type , AC, 415 volts, 35 KA of capacity 125 amps, 4 pole complete all as specified and directed. |
| 159 | Supply and fixing in replacement of moulded case circuit breaker panel mounting type , AC, 415 volts, 36 KA of capacity 250 amps 4 pole complete all as specified and directed. |
| 160 | Supply and fixing in replacement of moulded case circuit breaker panel mounting type , AC, 415 volts, 50 KA of capacity 400 amps 4 pole complete all as specified and directed. |
| 161 | M&L for clean the filter, cooling coil & blower of AHU for AC plant of any capacity complete all as specified and directed. |
| 162 | Taking down old unserviceable AHU complete cooling coil assembly from existing location and checking of water leakages in AHU cooling coil making repairs by brazing, gas welding,necessary copper tubes, copper jointing rods, joints etc after refixing the same its location properly and carry out the pressure testing after repairs of AHU for AC plant of any capacity complete all as specified and directed. (Note-1: The arrangement of men power,T&P,transportations etc and testing complete job shall be contractors responsibility) |
| 163 | Supply and fixing in replacement of Power contactor , 4Pole ,440v,50Hz ,400amp, : MNX 400 2 NO+2 NC complete all as specified and directed. |
| 164 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 265 amps capacity complete all as specified and directed. |
| 165 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 225 amps capacity complete all as specified and directed. |
| 166 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 185 amps capacity complete all as specified and directed. |
| 167 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 70 amps capacity complete all as specified and directed. |
| 168 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 50 amps capacity, complete all as specified and directed. |
| 169 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 45 amps capacity, complete all as specified and directed. |
| 170 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 40 amps capacity, complete all as specified and directed. |
| 171 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 32 amps capacity, complete all as specified and directed. |
| 172 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 25 amps capacity, complete all as specified and directed. |
| 173 | Supply and fixing in replacement Contactor, 3poles with AC coil of MNX 18 amps capacity, complete all as specified and directed. |
| 174 | Supply and fixing in replacement of temperature gauge (thermometer) digital type 0-50 degree centigrade complete all as specified and directed. |
| 175 | Supply and fixing in replacement of control switches pressure gauge low pressure (LP) complete all as specified and directed. |
| 176 | Supply and fixing in replacement of control switches pressure gauge High pressure (HP) complete all as specified and directed. |
| 177 | Supply and fixing in replacement of HRC Fuse unit 400 Amps complete all as specified and directed. |
| 178 | Supply and fixing in replacement of HRC Fuse unit 200 Amps complete all as specified and directed. |
| 179 | Supply and fix phase failure preventor for the protection motors complete all as specified and directed. |
| 180 | Supply and fixing in replacement Aluminium lugs suitable for above 120 sqmm upto 240sqmm cable complete all as specified and directed. |
| 181 | Supply and fixing in replacement Aluminium lugs suitable for upto 120 sqmm cable complete all as specified and directed. |
| 182 | Supply and fixing in replacement thermal over load relay of range 6.5 to 10 Amps complete all as specified and directed |
| 183 | All as per item No 182 above but 15 to 22 Amps capacity complete all as specified and directed. |
| 184 | All as per item No 182 above but 30 to 50 Amps capacity complete all as specified and directed. |
| 185 | All as per item No 182 above but above 50 to 70 Amps capacity complete all as specified and directed. |
| 186 | All as per Item No. 182 above but above 70 to 100 Amps complete all as specified and directed. |
| 187 | Supply and fixing in replacement of indicating lamp set (RYB) LED type complete all as specified and directed. |
| 188 | S&F in replacement Star Delta Timer 0-30 Seconds duration complete all as specified and directed. |
| 189 | Supply and fixing in replacement of electronic adjustable cyclic timer complete all as specified and directed. |
| 190 | Supply and fixing in replacement industrial water pressure switch meter as per existing complete all as specified and directed. |
| 191 | Supply and fixing in replacement of On off push botton switch electrical complete all as specified and directed. |
| 192 | Supply and fixing in replacement Voltmeter digital type (0-500V) complete all as specified and directed. |
| 193 | Supply and fixing in replacement Ammeter digital type (0- 100 Amps) complete all as specified and directed. |
| 194 | S&F in repair Rotary selector switch 3 position complete all as specified and directed. |
| 195 | Supply and fixing in replacement CT Coil 100/5 Amps complete all as specified and directed. |
| 196 | Supply and fixing in replacement CT Coil 60/5 Amps complete all as specified and directed. |
| 197 | Supply and fixing in replacement CT Coil 30/5 Amps complete all as specified and directed. |
| 198 | M & L for ladder of GI Pipe heavy 40 mm dia for cooling tower approx 6 mtr length complete all as specified and directed. |
| 199 | M&L in renewal for making of computerised colour/ printed of layout plan or brief details i.e history of installation/ machinery of various installations on and including 1.0mm thick plastic laminated acrylic sheet of size 1500x1200mm fixed to new hard boards with & including PVC beading of suitable size fixed to all edges of board with & including mild steel screws of suitable size complete all as specified and directed.Note:- Details i.e layout plan and brief details shall be provided by Engineer-in-Charge separately during execution. |
| 200 | M&L in renewal for making of computerised colour/ printed of name of installation and details of various installations on and including 1.0mm thick plastic laminated acrylic sheet of size 1000x600mm fixed to new hard boards with & including PVC beading of suitable size fixed to all edges of board with & including mild steel screws of suitable size complete all as specified and directed.Note:- Name & details of installations shall be provided by Engineer-in-Charge separately during execution. |
| 201 | M&L for Repairs to cooling tower of 12.5/22 TR by replacing the rusted GI Wire mesh of existing gauge and weight of size nuts ,clamps,and bolts etc complete all as specified and directed. |
| 202 | Supply,install, Commissioning and testing of capacity of cooling tower 100 TR, one no twin cell type corrosion resistant,fire retardant,FRP induced draft,rectangular/square type counter flow cooling tower of capacity 120% of plant running capacity with maximium allowable temperature 50 degree centigrade,drift loss 0.005% of water circulation,such as 80TR,water flow rate USGPM-1500,Inlet temp-97.5F,outlet temp-90F,wet bulb temp-83F,FRP materials,suitable mechanical eqpt-hot dip galvanized UV stabilized,PVC piping work,incl aluminium fan hub and blades-06 Nos,suitable size blades,fan motor 5 HP,960 rpm, dry weight 500 kgs,operating weight approx 1750 kgs, size suitable for as existing,incl sprinklers and functioning required connected items and including removing old unserviceable complete all as specified and directed. Please Enable Macros to View BoQ information |