| 1 | B/R WORKSTaking down existing treatment of any description on roof etc including scrubbing down with water as in roof treatment etc complete all as specified and as directed |
| 2 | Material & Labour for cement concrete (1:2:4) type B-0 using 12.5 mm graded stone aggregate in padding finishing surface of concrete topping even and smooth without using extra cement complete all as specified and directed. |
| 3 | Material & Labour for 10mm thick rendering with cement mortar (CM1:3) on concrete finished even & fair complete all as specified and directed. |
| 4 | Material & Labour for preparation of roof top surface for roof treatment using application of water proofing treatment by authorised applicator complete all as specified and as directed and comprising of the following:- (a) Preparation of roof top surfaces and cleaning all the dust and loose material by brush/blower/grinder including removing of vegetation/plantation from the surface and providing and applying single component elastic cold applied polyurethene modified acrylic roofing system, co-elastic technology (CET) based on modified polyurethene and fully fibre reinforced, having sun reflectivity index(SR) of 109 on top of concrete roof surfaces.(b) All cracks upto 3mm at corner joints, channel and parapets shall treated with crack seal.(c) Applying three coats incuding one coat of primer of polyurethene membrane having coverage @ min 0.75kg/sqm and dilution upto 10% and laying reiforced fibre net and applying two coats for maintaining minimum dry film thickness 1.5mm and elongation at break of free fall of apprx 350%(d) The material shall be appplied with brush or roller, complete in all respect as directed. (Note: 6hrs interval between two coat shall be maintained)(e) All auxillary and accessories involved during application should be supplied by single manufacturer as part of system. Name of Work: ADDN/ ALTN/ IMPROVEMENT TO FIRE FIGHTING INFRASTRUCTURE UNDER GE(AF) TUGHLAKABAD Contract No: CA NO. CE(AF)/NGP/TKD/TEMP 06 OF 2026- 27 Name of the Bidder/ Bidding Firm / Company : SCHEDULE OF CREDITNOTES:-1. The unit rate of materials/items given under column 5 are minimum rate fixed by the department. The contractor shall quote his unit rate under column 7 and arrive at the amount under column 8 and there by total amount of sch of credit. However, if the quoted rate is lower than the rate inserted by MES, the same shall be treated as “AT PAR” and the amount shall be corrected accordingly to work out the total credit amount. 2. It will be responsibility of the contractor for removal of demolished material thereof, without any extra cost. The materials obtained from dismantling/demolition shall be the property of the contractor.3. The contractor is advised to inspect the buildings/structures to be demolished and ascertain the quantity and quality of material to be obtained from demolition. No claim whatsoever, on account of quality/quantity of material actually obtained on demolition shall be admissible4. The materials obtained by demolition / dismantling as per relevant part of schedule ‘A’ is given below and complete dismantled material shall be the property of the contractor and credit for the same shall be charged from the contractor. The credit assessed by the department is only rough indication and the contractor shall have no claims whatsoever against Government if the actual cost of the salvaged materials turn out to be different from the amount assessed by the department.5. The quantities inserted in the column 4 are approximate and the contractor will have no claim if the quantities obtained to be different on execution. The actual quantities shall be measured as per the work actually executed at site against the respective items of Sch ‘A’.6. The credit amount of this schedule will be carried over to General Summary/BOQ here-in-after to arrive at the contract Sum.7. The materials listed in this schedule shall be recorded in the measurement Book and accordingly to be abstracted as per work done of the respective items of Schedule ‘A’ and the total abstracted credit amount shall be deducted from the total value of work done.8. The materials so obtained by the contractor shall not be allowed to be reused in the work unless otherwise mentioned and the contractor shall remove the same from the work site with prior permission of GE without any extra cost to the Deptt only after adjustment of the amount of credit in first payment. Sl No Description of material Unit Approx Nos of unit Assessed Rate in Rs. per unit Amount in Rs. Quoted by the contractor Rate per unit Amount in Rs |
| 5 | Material & Labour for preparation of roof top surface for roof treatment using application of water proofing treatment by authorised applicator complete all as specified and as directed and comprising of the following:- (a) Preparation of roof top surfaces and cleaning all the dust and loose material by brush/blower/grinder including removing of vegetation/plantation from the surface and providing and applying single component elastic cold applied polyurethene modified acrylic roofing system, co-elastic technology (CET) based on modified polyurethene and fully fibre reinforced, having sun reflectivity index(SR) of 109 on top of concrete roof surfaces.(b) All cracks upto 3mm at corner joints, channel and parapets shall treated with crack seal.(c) Applying three coats incuding one coat of primer of polyurethene membrane having coverage @ min 0.75kg/sqm and dilution upto 10% and laying reiforced fibre net and applying two coats for maintaining minimum dry film thickness 1.5mm and elongation at break of free fall of apprx 350%(d) The material shall be appplied with brush or roller, complete in all respect as directed. (Note: 6hrs interval between two coat shall be maintained)(e) All auxillary and accessories involved during application should be supplied by single manufacturer as part of system. Name of Work: ADDN/ ALTN/ IMPROVEMENT TO FIRE FIGHTING INFRASTRUCTURE UNDER GE(AF) TUGHLAKABAD Contract No: CA NO. CE(AF)/NGP/TKD/TEMP 06 OF 2026- 27 Name of the Bidder/ Bidding Firm / Company : SCHEDULE OF CREDITNOTES:-1. The unit rate of materials/items given under column 5 are minimum rate fixed by the department. The contractor shall quote his unit rate under column 7 and arrive at the amount under column 8 and there by total amount of sch of credit. However, if the quoted rate is lower than the rate inserted by MES, the same shall be treated as “AT PAR” and the amount shall be corrected accordingly to work out the total credit amount. 2. It will be responsibility of the contractor for removal of demolished material thereof, without any extra cost. The materials obtained from dismantling/demolition shall be the property of the contractor.3. The contractor is advised to inspect the buildings/structures to be demolished and ascertain the quantity and quality of material to be obtained from demolition. No claim whatsoever, on account of quality/quantity of material actually obtained on demolition shall be admissible4. The materials obtained by demolition / dismantling as per relevant part of schedule ‘A’ is given below and complete dismantled material shall be the property of the contractor and credit for the same shall be charged from the contractor. The credit assessed by the department is only rough indication and the contractor shall have no claims whatsoever against Government if the actual cost of the salvaged materials turn out to be different from the amount assessed by the department.5. The quantities inserted in the column 4 are approximate and the contractor will have no claim if the quantities obtained to be different on execution. The actual quantities shall be measured as per the work actually executed at site against the respective items of Sch ‘A’.6. The credit amount of this schedule will be carried over to General Summary/BOQ here-in-after to arrive at the contract Sum.7. The materials listed in this schedule shall be recorded in the measurement Book and accordingly to be abstracted as per work done of the respective items of Schedule ‘A’ and the total abstracted credit amount shall be deducted from the total value of work done.8. The materials so obtained by the contractor shall not be allowed to be reused in the work unless otherwise mentioned and the contractor shall remove the same from the work site with prior permission of GE without any extra cost to the Deptt only after adjustment of the amount of credit in first payment. Sl No Description of material Unit Approx Nos of unit Assessed Rate in Rs. per unit Amount in Rs. Quoted by the contractor Rate per unit Amount in Rs |
| 6 | Old steel ventilators / windows |
| 7 | Chowkats with shutters any size |
| 8 | Old steel tubing any size |
| 9 | Old u/s bib tap, stop valve, shower rose, |
| 10 | Old PVC flushing cistern |
| 11 | Old u/s wash hand basin with fittings |
| 12 | Old PVC connection |
| 13 | Old u/s SS sink |
| 14 | Old u/s SS kitchen rack |
| 15 | Old u/s curtain rod |
| 16 | Old u/s towel rail |
| 17 | Old PVC tank |
| 18 | Old CI pipe any size |
| 19 | Old u/s mirror |
| 20 | Old u/s aluminium/ copper point wiring |
| 21 | Old u/s switch, socket, fan regulator, ceiling rose, plugs, and switch socket combination junction boxes, sunkcn box of any type and capacity |
| 22 | Old u/s DB of any type, size and capacity |
| 23 | Old u/s MCB of any type and capacity |
| 24 | Old u/s tube light of any type |
| 25 | Old u/s sub-main wiring of any size & type |
| 26 | Old u/s earthing. |
| 27 | Old u/s switch, socket, any type and capacity |
| 28 | Old u/s LED light fitting 1x16 Watt flame proof, any type and capacity |
| 29 | Old u/s flame proof exhaust fan & 300mm sweep |
| 30 | Old u/s flame proof Ceiling fan 1200mm sweep |
| 31 | Old U/S Intelligent Addressable Fire Alarm Panel, 2 Loop capacity expandable up to 5 loop with minimum 250 addresses on every loop. minumum 160 characters |
| 32 | Old U/S analogue addressable fire control panel repeater of having full display & optional control from a small and unobtrusive local control station, |
| 33 | Old U/S Detectors complying with and type certified to EN-45 addressable type mutisensor detector with smoke and heat detector combination with base with self built intelligence as per IS:11360 |
| 34 | Old U/S Beam master detector Transceiver type |
| 35 | Old U/S cable for Analog Addressable fire alarm system 1.5 sqmm x 2 core (Red). |
| 36 | Old U/S \\" Fire Ray 2000\\" Optival Beam Complete with Transmitter Receive, Controller ,& ,Apolo XP95 Addressable Zone Monitor unit for Addressing. |
| 37 | Old U/S Apolo XP95 intelligent Analouge Addressable Manual Call Point |
| 38 | Old U/S Apolo XP95 intelligent Analouge Addressable loop Sounder ( hooter) |
| 39 | Old U/S REMOTE RESPONSE INDICATOR with necessary materials |
| 40 | Old U/S Apolo XP95 input / output Unit ( Control Module) |
| 41 | Old U/S Apolo XP95 Fault Isolator ( Fault Module) -20 OD ( in lieu of XP95Base) Total amount as applicable with respect to Note No. 1 shall be carried over to BOQ Rs.96,584.00 0.0 GENERAL SUMMARY (CONTD…………………..) 1. Total Lump Sum amount brought forwarded from Serial Page No. 54 Rs. 0.0 2. Deduct Amount of Schedule of Credit brought forwarded from Serial Page No. 58 (-) Rs. 0.0 3. NET LUMP SUM AMOUNT Rs. 0.0 ( Zero Only) SIGNATURE OF CONTRACTOR AD (CONTRACTS) DATED : FOR ACCEPTING OFFICER Please Enable Macros to View BoQ information |