| 1 | Dismantiling and removing RCC column, beum, slah staircase, landing, listet including stacking the useful materials for reuse and removing the debris within 50 metres lead |
| 2 | RCC work of M20 grade with 20 mm and down grade CBIGC including hosting and laying all cost of materials, labour, conveyance, royalty, T & P. water for curing etc all complete. |
| 3 | RCC floor and roof slabs, landings, balconies, projecting sun shades and chajjan upt 4.3m height |
| 4 | RCC beams, column, grider and bresimer, etc. |
| 5 | Requirement af HYSD/ MS rod and labour for cutting, bending binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge |
| 6 | RCC walls and fins including attached pillasters. |
| 7 | Transporting the earth rough stone, metal, khoa, chips, sand, surka, quarry rubbish, moorum laterite stone and washed gravel by Mechanical means within 5.00 Km lead, fill including loading & unloading etc all complete. |
| 8 | 16 mm thick cement plaster (16) over brick or stone masonry |
| 9 | 9 12 mm thick cement plaster (16) for brick work |
| 10 | Finishing walls with water proofing weather coat cement paint of approved make including cost of 10 caffolding staging charges with cost of all materials tases, labour T&P etc complete |
| 11 | Distempering two coat to walls with distemper of approved shade on old work to give an even shade inculding cost of distemper. |
| 12 | Painting two coats with approved paint on new wood work |
| 13 | Fising Vetrified tiles in floors treads or steps and landing on 25 mm thick bed of cement mortar 1:1 3 (1 cement: Isand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles |
| 14 | Labour for fitting and fixing MS door & windows grills as per approved design including cost of fitting |
| 15 | Supplying, filling, fixing up window (sliding type) made up UPVC as windows frame, section No 4095, 4096 and 9777, 3994 as shutter frame with 5mun thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P excluding cost of glass etc complete as per direction of EIC |
| 16 | 25 mm thick grading concrete (1:2:2) on roof slab with 6 mm size CBIGC on new work |
| 17 | Removing old or cement plaster from wall including raking out joints 12 mm deep and removing the debris within 50 metres lead |
| 18 | Diamantiling and removing 2.5 cm thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50 metres lead. Please Enable Macros to View BoQ information |