| 1 | Earth work for excavation of foundation in all kinds of soil incl. levelling and dressing the bed etc. complete |
| 2 | Filling plinth with sand including watering and ramming etc. complete. |
| 3 | P.C.C (1:3:6) using 4cm. Size BHGCB metal including the cost of all merials, labour carriage, royalty etc. complete |
| 4 | R.C.C (M20) using 12mm.size BHGCB chips including all cost complete |
| 5 | Rigid and smooth centering and shuttering for Drain work incl. cost of all materials. Column Base |
| 6 | Column upto Plinth Level |
| 7 | Head room Column(1st Floor) |
| 8 | Lintel |
| 9 | Roof Slab |
| 10 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 11 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) in foundation and plinth |
| 12 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in super structure |
| 13 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in(1st Floor) |
| 14 | 12mm. thick cement plaster (1:6) over brick work( Ground Floor)Below Plinth Level (Out Side) |
| 15 | Room Inside |
| 16 | 6 mm thick cement plaster (1 : 4) finished smooth |
| 17 | 12mm. thick cement plaster (1:6) over brick work( First Floor) |
| 18 | Head Room P/l (Inside) |
| 19 | Water bound Cement Priming one coat with cost of all materials etc. Complete.(Ground Floor) |
| 20 | Water bound Cement Priming one coat with cost of all materials etc. Complete.(First Floor) |
| 21 | Finishing outside walls with two coats of weather coat paint of approved shade on new work to give an even shade including cost of all labour ,materials & P with taxes ,transportation etc all complete.Qnty as per Inside P/L Item (Ground Floor) |
| 22 | Qnty as per Inside P/L Item (First Floor) |
| 23 | Wall painting 2 coats with Plastic Emulsion Paint over a finished plastered surfaces of walls with Berger Synthetic putty (interior wall puty) wall puty of approved shade on new work to give an even shade in Ground Floor.Qnty as per P/l Item (Ground Floor) |
| 24 | Qnty as per P/l Item (Firdt Floor) |
| 25 | Supplying all materials, labour and ladder/Scaffolding T&P for Art Painting/3D Painting over walls/streets/(RCC or plaster or CC Bitumenous base black top surface) as per direction EIC including cost of paint admixtures such as fabric stainer, acrylic emulsion etc with labour charges of artistis and helpers etc. Complete. |
| 26 | Supplying , fitting and fixing of 35mm thick M.S. Grill Window & Door (shutter) with M.S. Grill and iron fittings fixed in proper possition for window & shutter including all cost labour and materials T&P etc. all complete as per direction of Engineer-in-charge. |
| 27 | Painting two coats of synthetic enamel paint over a coat of primer, to Iron works as per approved quality over a coat of primer , sand papering, polishing the surface, including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete in all floors as per direction of the Engineer-in-charge. |
| 28 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32 mm x 32 mm x 2 mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect. |
| 29 | RCC Ring Tank(Soak way pit) 1.20 m dia x 1.5 mtr deep |
| 30 | Disposal of surplus excavated materials by truck to low land area incl. loading and unloading etc. complete. |
| 31 | Supplying all materials, labour, T & P and providing and fixing to wall or celling and floor CPVC Pipe &fittings and clamps including complete as per specification and direction of the Engineer-in-charge.20 mm dia CPVC pipe |
| 32 | 15 mm dia CPVC pipe |
| 33 | 15 mm dia CPVC elbow |
| 34 | 15mm CPVC Tee |
| 35 | 15 mm CPVC Union |
| 36 | 15 mm dia CPVC valve |
| 37 | 15 mm dia CPVC brass MTA |
| 38 | 20 mm CPVC elbow |
| 39 | 20 mm CPVC Tee |
| 40 | 20 mm CPVC socket |
| 41 | 15mm CPVC socket |
| 42 | Supplying all materials, labour, T & P and fitting and fixing of PVC SWR Pipes & Fittings including cost & conveyance of all materials to worksite, payment of taxes etc. complete as per PH specification and direction of the Engineer-in-charge.110 mm PVC Pipe |
| 43 | 75 mm PVC Pipe |
| 44 | 75 mm Floor trap (Nahani trap) |
| 45 | 110 mm Door bend |
| 46 | 110 mm Bend 87.5° |
| 47 | 75 mm Bend |
| 48 | PVC solvent cement |
| 49 | Vent pipe 75 mm With cowl |
| 50 | Supplying , fitting & fixing of wash hand basin including all cost. (500X400) |
| 51 | Supplying ,fitting & fixing of 15mm dia c.p swan neck Pillar cock with spout including all cost complete. |
| 52 | Supplying of CPVC solvent cement (237 ml) including all cost. |
| 53 | Supplying , fitting & fixing of Towel rod including all cost. |
| 54 | Supplying , fitting & fixing of LS flushing cistern including all cost. |
| 55 | Supplying , fitting & fixing of E.W.C. with P-trap including all cost complete |
| 56 | Supplying , fitting & fixing of EWC standard seat cover including all cost complete |
| 57 | Supplying , fitting & fixing of C.P.revolving shower with arm (overhead) |
| 58 | Supplying , fitting & fixing of CP Health Foucet with 1.0 mtr PVC Tube including all cost complete |
| 59 | Supplying, fitting & fixing of Bath Room Mirror 600 x 600 mm with assesories including all cost complete. |
| 60 | Supplying, fitting & fixing of Basin waste coupling including all cost complete. |
| 61 | Supplying , fitting & fixing 1000 liters sintex tank including all cost complete. |
| 62 | Extra over item No -32 for hoisting Rotational moulded polyethylene cylindrical vertical water storage tanks of the following size for every additional height of 5 metres or part thereof |
| 63 | Supplying , fitting & fixing 0.5 Hp motor pump including all cost complete. |
| 64 | Supplying, fitting & fixing of PVC door with assesories including all cost complete. |
| 65 | Display Board |
| 66 | Add 5% for O & M charges |
| 67 | Infrastructure DevelopmentFilling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge for 100 cum |
| 68 | Earth work for excavation of foundation in all kinds of soil incl. levelling and dressing the bed etc. complete |
| 69 | Filling plinth with sand including watering and ramming etc. complete. |
| 70 | P.C.C (1:3:6) using 4cm. Size BHGCB metal including the cost of all merials, labour carriage, royalty etc. complete |
| 71 | RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position.Column Base |
| 72 | Column |
| 73 | Plinth Bend |
| 74 | Cutting, straitening, bending,binding of HYSD Bar & tying the grills and placing in position etc.complete incl.cost |
| 75 | First class Fly Ash brick work in cement mortar (1:6) in Super Structure |
| 76 | C.C (1:2:4) using 12mm.size BHGCB chips including all cost complete |
| 77 | Providing 12mm thick plaster in C.M. (1:6) over Brick massonary work racking out the joints finsihed smooth to proper line and plumb , watering and curing for 7days with cost, conveyance, royalty, taxes of all materials, cost of all labour, T&P etc. complete as per direction of the Engineer-in-charge. |
| 78 | Water bound Cement Priming one coat with cost of all materials etc. Complete. |
| 79 | Finishing outside walls with two coats of weather coat paint of approved shade on new work to give an even shade including cost of all labour ,materials & P with taxes ,transportation etc all complete. |
| 80 | Supplying , fitting and fixing of 35mm thick M.S. Grill Window & Door (shutter) with M.S. Grill and iron fittings fixed in proper possition for window & shutter including all cost labour and materials T&P etc. all complete as per direction of Engineer-in-charge. |
| 81 | Painting two coats of synthetic enamel paint over a coat of primer, to Iron works as per approved quality over a coat of primer , sand papering, polishing the surface, including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete in all floors as per direction of the Engineer-in-charge. |
| 82 | Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) Filling |
| 83 | Carriage of earth including all cost complete |
| 84 | Grassing with Natural Mexican Grass Stem height 0.10m including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free fromweeds and fit for mowing including cost of grass and supplying good earth, if needed(the good earth shall be paid for separately). |
| 85 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly leveling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or/and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 86 | Supplying and stacking sludge at site including royalty and carriage up to 1 km (sludge measured in stacks will be reduced by 8% for payment). |
| 87 | Add for other unforeseen item such as wirtting charges of display board etc. Please Enable Macros to View BoQ information |