| 1 | Dismentaling and removing cement concrete including stacking the useful materials for reuse and removing the debris with all lead lift, delifts including cost of labour T&P etc complete as per the direction of the Engineer-in-Charge |
| 2 | Earth work in excavation of foundation in Hard soil including dressing and leveling the bed to required profile for receiving the sand filling and concrete and depositing the excavated materials away from the working area with all leads, lifts & delifts etc complete as per the direction of the Engineer-in-Charge |
| 3 | Collecting, conveying and stacking river sand at work site & filling foundation & plinth with sand well watered & rammed with cost, carriage, royalty of all materials etc complete as per the direction of the Engineer-in-Charge |
| 4 | Cement concrete (1:3:6) using 40mm size crusher broken hard granite metal of approved quality from approved quarry free from weathered skin and dusts mixed with screen and washed sharp coarse river sand and port land cement of ISI standard and grade as approved by the department, vibrating, finished and watering for curing for a period as approved by the department including all cost, carriage, royalty taxes of materials etc complete as per the direction of the Engineer-in-Charge. |
| 5 | Cement concrete (1:2:4) using 12mm size crusher broken hard granite chips from approved quarry free from weathered skin and dusts mixed with screen and washed sharp coarse river sand and port land cement of ISI standard and grade as approved by the department including finishing and watering for curing for a period as approved by the department including all cost, carriage, royalty, taxes of materials etc complete as per the direction of the Engineer-in-Charge |
| 6 | Rainforcement Cement concrete M-20 using 20mm size & downgraded crusher broken hard granite chips from approved quarry free from weathered skin and dusts mixed with screen and washed sharp coarse river sand and port land cement of ISI standard and grade as approved by the department including finishing and watering for curing for a period as approved by the department including all cost, carriage, royalty, taxes of materials etc complete as per the direction of the Engineer-in-Charge |
| 7 | Supplying, fitting and placing uncoated HYSD bar reinforcement with cutting, bending, binding, straightening, tying the grills and placing in positing as per drawing & technical specification with cost & conveyance of M.S rod and binding wire 18 to 20 gauge, cost of labours, T&P required for the work etc complete as per the direction of the Engineer-in-Charge |
| 8 | Rigid smooth centering & shuttering for PCC/RCC work including false works and dismantling them after required days of casting including cost, carriage, and all other taxes etc complete as per the direction of the Engineer-in-Charge |
| 9 | Labour for lying and fixing RCC NP3 1000mm dia Hume pipe placing in position with collar jointed with C.M (1:3) including cost, carriage and all other taxes of materials etc complete as per the direction of the Engineer-in-Charge |
| 10 | Filling in foundation and plinth with excavated materials including watering & compacting with all labour T&P etc complete as per the direction of the Engineer-in-Charge |
| 11 | Collecting, conveying, supplying, and stacking IRC Grade-III Metal (53mm to 22.4mm) size crusher broken hard granite metal from approved quarry and stacking at worksite in regular box heaps of size 1.5mx1.5mx0.50m for pre-measurement to be measured as one cum with all cost, conveyance, royalty and taxes of materials to site of work including conveying from stacks and spreading in uniform thickness, hard packing rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of MOSRT&H specification including hire and running charges of P.R.R., labour and T&P required for the work etc complete as per direction of Engineer in charge. Please Enable Macros to View BoQ information |