|
| 1 | Loading & unloading of 9 m PSC and Squre pole |
| 2 | Transporting of 9m PSC and Squre pole from Road side to pole pit up to 2 KM |
| 3 | Excavation of pole pit in Rocky ground 9 m PSC pole |
| 4 | Erection of 9 m PSC pole |
| 5 | Fixing of 3Q X arm |
| 6 | Fixing of 3.5 V X arm & 5.5 Tap Channel X arm |
| 7 | Fixing of HT/LT 'TI' Fittings |
| 8 | Dismantling & Re-Fixing of 3Q Xarm |
| 9 | Dismantling & Re-Fixing of SQ X arm |
| 10 | Dismantling & Re-Fixing of 3.5, 4.5 V X arm & 5.5 Tap Channel X arm |
| 11 | Dismantling & Re Fixing of HT/LT 'TI' Fittings |
| 12 | Fixing of HT Pin Insulater |
| 13 | Fixing of LT Pin Insulater |
| 14 | Dismantling & Re Fixing of HT Pin Insulater |
| 15 | Dismantling & Re Fixing of LT Pin Insulater |
| 16 | Dismantling & Re Fixing of HT Disc Insulater |
| 17 | Dismantling & Re Fixing of LT shackle |
| 18 | Dismantling & Re Fixing of Aluminium knob |
| 19 | Dis & Redoing of S phase connection |
| 20 | Dis & Redoing of 3 phase connection |
| 21 | Dismantiling Re-Erection of CFL &72 W LED light fittings |
| 22 | Dismantling & Re-fixing of street light switching point arrangement |
| 23 | Dismantling and re Erection of stay set complete |
| 24 | Stringing of HT line 7/4.09 ACSR mm pin point |
| 25 | Stringing of HT line 7/4.09 ACSR mm cut point |
| 26 | Dismantling & re Stringing of HT line 7/4.09 ACSR mm cut point |
| 27 | Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR pin point |
| 28 | Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR cut point |
| 29 | Dismantling & re Stringing of LT line 7/3.15 AAAC or 7/3.35 ACSR pin point |
| 30 | Dismantling & re Stringing of LT line7/3.15 AAAC or 7/3.35 ACSR cut point |
| 31 | Dismantling of conductor up to 7/2.59 mm |
| 32 | Loading & unloading of line materials |
| 33 | Transporting line materials from substore to section office and office to work spot |
| 34 | Drilling / Less than 23mm holes per hole / Slatted holes of slotted holes |
| 35 | Erection of double pole Roating AB Switch Structure complete as per TNEB standard including Roating AB switch, Feeder arrangements with HT-LAS ,HT jumpering complete, Structure earthing complete with 3 pits and earth loops painting,and Erection of 9M pole and colour washing of PSC poles etc |
| 36 | OrdinaryTree Clearance |
| 37 | Coconut Tree Clearance Please Enable Macros to View BoQ information |