|
| 1 | Removal of slit/soil/earth, sand, pebbles, 'Malba', debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect (b) For depth above 15 cms but upto 30cms having (i) Unlined section |
| 2 | Empty bag of 50 kg capacity in good condition Plastic / Polythene |
| 3 | Supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complete. Plastic bag |
| 4 | Patrolling of dam with Mobile phones (with recharges pack) for communicating with site incharge or control room including T&P required for Patrolling and watch & ward. |
| 5 | Design, Drawing, fabrication, supply, erection and commissioning of Trestle assy / Railing decking/Trash rack/Structural steel hoist bridge/structural steel hoist supporting structureformonorail /Catwalk bridgefor connecting spillwaypiersforall typeofsluicewithembedded partsconsisting of columns, beams, bracings, stiffeners, ties, chequeredplate covering, hand railing, ladder etc. ,with all other accessories for operating gates, other structure including cost of all materials,machinery, labour, tools and tackles, cutting,aligning, anchoring, welding, finishing, cleaning, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint etc., complete as per specificationsand approved drawings, including packing &forwarding, transportation charges for structural steel components and other materials. |
| 6 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (d) 20 mm |
| 7 | Supplying and laying sand of grade as per design requirement inrequired profile including all lead & lifts. This item is to be used only for laying filter / inverted filter |
| 8 | Supplying and laying aggregate in layer sand profile as specified including all leads & lifts. This item is to be used only for laying filter / inverted filter (b) Broken ballast 20 to 40 mm size |
| 9 | Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts (a) 23 cm thickness (± 5 % thickness tolerance) |
| 10 | Side shuttering including propping etc.complete (to achieve finish F2 for : © Retainingwall, counterfort, abutment, wing walls up stream or down stream slope facings of dams and open faces of construction joints etc. |
| 11 | Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using ii Tor or ribbed bars (IS :1786 Please Enable Macros to View BoQ information |