| 1 | GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. |
| 2 | Servicing & Testing of Vacuum Circuit Breaker (VCB - operating as 33KV, 6.6KV): Preventive Maintenance, servicing and testing of Vacuum Circuit Breaker (VCB) along with associated panel and control circuits, including cleaning, inspection, tightening, lubrication, checking of interlocks, mechanisms and control wiring; DC insulation resistance test, breaker operating time and contact resistance measurement, etc; and submission of detailed maintenance report as per IOCL approved format. Work to be done as detailed in Technical Specifications under respective heading and as per instruction of Engineer In Charge. Item is inclusive of tools & tackles, machinery, manpower, mobilisation & demobilization, boarding, lodging, transportation, testing equipment charges and all other incidental cost. Unit of measurement \\"EA\\" indicates one complete VCB. |
| 3 | VCB Bottle integrity Test: Testing of VCB bottle integrity as per scope of work. Unit of measurement \\"EA\\" indicates one complete VCB. |
| 4 | Servicing & Testing of Air Circuit Breaker (ACB): Preventive Maintenance, servicing and testing of Air Circuit Breaker (ACB) along with associated panel and control circuits, including cleaning, inspection, tightening, lubrication, checking of interlocks, mechanisms and control wiring; DC insulation resistance test, breaker operating time and contact resistance measurement, etc; and submission of detailed maintenance report as per IOCL approved format. Work to be done as detailed in Technical Specifications under respective heading and as per instruction of Engineer In Charge. Item is inclusive of tools & tackles, machinery, manpower, mobilisation & demobilization, boarding, lodging, transportation, testing equipment charges and all other incidental cost. Unit of measurement \\"EA\\" indicates one complete ACB. |
| 5 | Oil Filration, Dehydration & Degasification: Filtration, Dehydration & Degasification of transformer oils and processing the same till the Dielectric Strength of Transformer Oil reaches a value of 60 kV at 2.5 mm gap by providing suitable machinery for Dehydration and Filtration of Transformer Oil at the locations of transformers (in-situ) in Pumping/Delivery Station. Testing of at least one sample each at an interval of every 03 (three) hours of Dehydration & Filtration process. Continuing the process of Filtration and Dehydration till the Dielectric Strength of transformer reaches a value of 60 KV. The filtration and testing procedure should as per IS 1866 & 335. Taking minimum three joint samples of the oil from each transformer, after completion of process of Filtration and Dehydration and testing the sample in the presence of IOC representative for final results as directed by Site Engineer/ Engineer-in-Charge.Work to be done as detailed in Technical Specifications under respective heading and as per instruction of Engineer In Charge. Item is inclusive of tools & tackles, machinery, manpower, mobilisation & demobilization, boarding, lodging, transportation, testing equipment charges and all other incidental cost. Please Enable Macros to View BoQ information |
| 6 | Oil Filration, Dehydration & Degasification: Filtration, Dehydration & Degasification of transformer oils and processing the same till the Dielectric Strength of Transformer Oil reaches a value of 60 kV at 2.5 mm gap by providing suitable machinery for Dehydration and Filtration of Transformer Oil at the locations of transformers (in-situ) in Pumping/Delivery Station. Testing of at least one sample each at an interval of every 03 (three) hours of Dehydration & Filtration process. Continuing the process of Filtration and Dehydration till the Dielectric Strength of transformer reaches a value of 60 KV. The filtration and testing procedure should as per IS 1866 & 335. Taking minimum three joint samples of the oil from each transformer, after completion of process of Filtration and Dehydration and testing the sample in the presence of IOC representative for final results as directed by Site Engineer/ Engineer-in-Charge.Work to be done as detailed in Technical Specifications under respective heading and as per instruction of Engineer In Charge. Item is inclusive of tools & tackles, machinery, manpower, mobilisation & demobilization, boarding, lodging, transportation, testing equipment charges and all other incidental cost. Please Enable Macros to View BoQ information |