| 1 | CARTAGE OF 8.5M/11M/13M POLES FROM STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALDO INCLUDING ETC AND ALSO INCLUDING THE COST OF T&P CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | CARTAGE OF 8.5M/11M/13M POLES FROM STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALDO INCLUDING ETC AND ALSO INCLUDING THE COST OF T&P CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 2 | CARTAGE OF LINE MATERIAL VIZ STONE PAD, TOP CHANNEL, DROPPER CHANNEL, DISC INSULATOR ETC AND OTHER MATERIAL FROM EDC/ASK HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS INCLUDING THE WORK OF ITS DRAGGING ETC AND ALSO INCLUDING THE COST OF LABOUR T&P AND CARRIER ETCREQUIRE FOR PROPER COMPLEION OF WORK. | CARTAGE OF LINE MATERIAL VIZ STONE PAD, TOP CHANNEL, DROPPER CHANNEL, DISC INSULATOR ETC AND OTHER MATERIAL FROM EDC/ASK HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS INCLUDING THE WORK OF ITS DRAGGING ETC AND ALSO INCLUDING THE COST OF LABOUR T&P AND CARRIER ETCREQUIRE FOR PROPER COMPLEION OF WORK. |
| 3 | ERECTION OF 8.5M/11M/13M POLES SINGLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | ERECTION OF 8.5M/11M/13M POLES SINGLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 4 | ERECTION OF 8.5M/11M/13M POLES DOUBLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | ERECTION OF 8.5M/11M/13M POLES DOUBLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 5 | GROUTING OF POLES 8.5M/11M/13M POLES AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDED THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. THE SUPPORT SHALL BE GROUTED WITH CEMENT SAND BALLAST/STONE PAD ETC AS PER ACTUAL SITE REQUIRED. | GROUTING OF POLES 8.5M/11M/13M POLES AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDED THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. THE SUPPORT SHALL BE GROUTED WITH CEMENT SAND BALLAST/STONE PAD ETC AS PER ACTUAL SITE REQUIRED. |
| 6 | ERECTION & GROUTING OF STYA SET AS PER RESSPO MANUAL AND ALSO INCLUDING THE COST OF ALL GROUTING MATERIAL LABOUR t&p FOR PROPER COMPLETION OF WORK. | ERECTION & GROUTING OF STYA SET AS PER RESSPO MANUAL AND ALSO INCLUDING THE COST OF ALL GROUTING MATERIAL LABOUR t&p FOR PROPER COMPLETION OF WORK. |
| 7 | ERECTION OF EARTHING COMPLETE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. | ERECTION OF EARTHING COMPLETE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 8 | LAYING, SAGGING, STRINGING, BINDING AND JUMPERING ETC ACSR WEASEL CONDUCTOR OLD/NEW ON THE NEWLY ERECTED POLE OTHER PLACE AS PER RESSPO MANUL AND AS PER DIRECTION OF SUPERVISING ENGINEER. | LAYING, SAGGING, STRINGING, BINDING AND JUMPERING ETC ACSR WEASEL CONDUCTOR OLD/NEW ON THE NEWLY ERECTED POLE OTHER PLACE AS PER RESSPO MANUL AND AS PER DIRECTION OF SUPERVISING ENGINEER. |
| 9 | CARTAGE OF XLPE CABLE 3x120 SQMM, 3x185 SQMM & ARMOUNRED CABLE DIFFERENT SIZE STORE VENTRE TO WORK SITE. | CARTAGE OF XLPE CABLE 3x120 SQMM, 3x185 SQMM & ARMOUNRED CABLE DIFFERENT SIZE STORE VENTRE TO WORK SITE. |
| 10 | LAYING, SAGGING, STRINGING, BINDING ETC OF 11 KV XLPE 3x120 SQMM, 3x185 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE ASPER RESSPO MANUAL AND AS PER DIRECTION. | LAYING, SAGGING, STRINGING, BINDING ETC OF 11 KV XLPE 3x120 SQMM, 3x185 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE ASPER RESSPO MANUAL AND AS PER DIRECTION. |
| 11 | LAYING, SAGGING, STRINGING, BINDING ETC OF LT ARMOURED CABLE 3.5x70 & 3.5x120 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. | LAYING, SAGGING, STRINGING, BINDING ETC OF LT ARMOURED CABLE 3.5x70 & 3.5x120 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. |
| 12 | THREE CHOOPING OF 11 KV LINE | THREE CHOOPING OF 11 KV LINE |
| 13 | FABRICATION OF 11 KV SUB STATION BASE ANGLE (16 MM HOLE 4 NO EACH S/S BASE ANGLE) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & CARTAGE ALL COMPLETE WORK. | FABRICATION OF 11 KV SUB STATION BASE ANGLE (16 MM HOLE 4 NO EACH S/S BASE ANGLE) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & CARTAGE ALL COMPLETE WORK. |
| 14 | FABRICATION OF 11 KV DROPPER CHANNEL (16 MM HOLE 7 NO EACH DROPPER CHANNEL) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & RATAGE ALL COMPLETE WORK. | FABRICATION OF 11 KV DROPPER CHANNEL (16 MM HOLE 7 NO EACH DROPPER CHANNEL) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & RATAGE ALL COMPLETE WORK. |
| 15 | FABRICATION OF 11 KV TOP CHANNEL (10 MM HOLE 10 NO EACH DROPPER CHANNEL) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & RATAGE ALL COMPLETE WORK. | FABRICATION OF 11 KV TOP CHANNEL (10 MM HOLE 10 NO EACH DROPPER CHANNEL) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & RATAGE ALL COMPLETE WORK. |
| 16 | FABRICATION OF 11 KV T OFF CHANNEL (16 MM HOLE 8 NO EACH DROPPER CHANNEL) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & RATAGE ALL COMPLETE WORK. | FABRICATION OF 11 KV T OFF CHANNEL (16 MM HOLE 8 NO EACH DROPPER CHANNEL) AS PER RESSPO DRAGGING WITH LOADING UNLOADING & RATAGE ALL COMPLETE WORK. |
| 17 | ERECTION OF 11 KV T OFF CHANNEL 100x50x1300 M AS PER RESSPO MANUAL DRAWING ALL COMPLETE WORK. | ERECTION OF 11 KV T OFF CHANNEL 100x50x1300 M AS PER RESSPO MANUAL DRAWING ALL COMPLETE WORK. |
| 18 | SUPPLY OF DIFFERENT SIZE OF NUT BOLT | SUPPLY OF DIFFERENT SIZE OF NUT BOLT |
| 19 | SAFELY CARTAGE & INSTALLATION OF 16/25/100/250 KVA TRANSFORMER ALL COMPLETE WORK | SAFELY CARTAGE & INSTALLATION OF 16/25/100/250 KVA TRANSFORMER ALL COMPLETE WORK |
| 20 | ERECTION & INSTALLATION OF DO FUSE SET (EACH 3 NOS) | ERECTION & INSTALLATION OF DO FUSE SET (EACH 3 NOS) |
| 21 | ERECTION & INSTALLATION OF PLINTH 250 KVA | ERECTION & INSTALLATION OF PLINTH 250 KVA |
| 22 | ERECTION & INSTALLATION OF FENCING OF 250 KVA | ERECTION & INSTALLATION OF FENCING OF 250 KVA |
| 23 | ERECTION & INSTALLATION OF CHEMICAL EARTHING | ERECTION & INSTALLATION OF CHEMICAL EARTHING |
| 24 | ERECTION & INSTALLATION OF TPMO (EACH 3 NOS) | ERECTION & INSTALLATION OF TPMO (EACH 3 NOS) |
| 25 | CARTAGE & ERECTION OF POLE MOUNTED UNIT ON DP (COMPLETE) | CARTAGE & ERECTION OF POLE MOUNTED UNIT ON DP (COMPLETE) |
| 26 | CARTAGE & ERECTION OF MAIN METERING SYSTEM (COMPLETE WORK) | CARTAGE & ERECTION OF MAIN METERING SYSTEM (COMPLETE WORK) |