| 1 | Material and labour for complete removal of existing treatment on walls and applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over the surface, complete all as specified and as directed.Note:- Second coat will only be carried out after 12 Hrs of first coat. |
| 2 | Material and labour for 1 to 2mm thick cement based wall care putty on walls to give uniform surface. Before applying of wall care putty, remove existing treatment of putty, completed all as specified and as directed. |
| 3 | Taking down cement plaster on brick or stone walls etc. including raking out joints, hacking for keys, scrubbing down with water etc. and rubish off the premises, complete all as specified and as directed. |
| 4 | Material and labour for rendering 15mm thick plaster in cement mortar(1(cement):6(sand) on fair faces of concrete or brick work and finish the surface even fair, complete all as specified and as directed. |
| 5 | Material and labour for rendering 15mm thick plaster in cement mortar(1(cement):4(sand) on fair faces of concrete or brick work in two layers (10mm thick 1st layer + 5mm thick finishing layer) mixed with water proofing compound as per manufacturer’s instructions on top layer only and finish the surface even fair, complete all as specified and as directed.Note :- WPC will be measured and paid separately under relevant item. |
| 6 | Supply of integral water proofing compound. |
| 7 | Material and labour for rendering 5mm thick in cement mortor (1:3) on fair faces of concrete surfaces as in ceilings (sunshed, chajja etc) and finishing surfaces even and fair, complete all as specified and as directed. |
| 8 | Material and labour for 1 to 2mm thick cement based wall care putty on newly plastered surfaces of walls to give uniform surface, completed all as specified and as directed. |
| 9 | Material and labour for preparation of newly plastered surfaces of wall and applying two coats of 1st quality acrylic distemper over a coat of alkali resistant primer, complete all as specified and as directed. Note:- Second coat will only be carried out after 12 Hrs of first coat. |
| 10 | Material and labour for preparation of newly plastered surfaces of walls and applying two coats of cement base paint over a coat of alkali resistant primer, complete all as specified and as directed.Note:-Second coat will only be carried out after 12 Hrs of first coat. |
| 11 | Material and labour for applying a coat of cement base paint on old decorated plastered surfaces of walls including preparation of old decorated surfaces, complete all as specified and as directed. |
| 12 | Material and labour for preparation of newly plastered surfaces of ceiling and applying three coats of white wash, complete all as specified and as directed. |
| 13 | Material and labour for preparation of old painted wood or wood based surface of any description not other wise described over 10cm width or girth including knotting and stopping and applying a coat of synthetic enamel paint (1st grade), complete all as specified and as directed.Note:- During painting of window/door (wooden) window glass pane and floor/wall covered with polytheen/ tarpaulin sheet/HDPE cover without any extra charge. |
| 14 | Material and labour for preparation of old painted steel surface of any description not other wise described over 10cm width or girth and applying a coat of synthetic enamel paint complete all as specified and as directed. Note:- During painting of window/door (steel) window glass pane and floor/wall covered with polytheen/ tarpaulin sheet /HDPE cover without any extra charge. |
| 15 | Material and labour for writing letters or figures Block, Roman, Italic or Indian) n.exc 30 cm high with synthetic enamel paint,complete all as specified and as directed. |
| 16 | Note for Item No. 1.00 to 15.00:- (i) Quote the rate considering use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures. Nothing extra will be paid on account of this. (ii) No jhoola is permitted for the work under any circumstances. (iii) Contractor is responsible for cleaning of floor during periodical, if floor, wall, window, door and glass pane not clean by him penaulty of Rs. 100.00 @ per Sqm recovered from the contractor. (iv) All T&P and safety equipment provided to workers by the contractor, if he failed in any will be fined @ Rs 250/- per person per day.(v) During painting of window/door (steel/wooden) window glass pane and floor/wall covered with polytheen/ tarpaulin sheet/HDPE cover without any extra charge and clean glass with turpentine oil.If fail to clean by him penaulty of Rs 1500.00 charged per accn. |
| 17 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, complete all as specified and as directed. |
| 18 | Material and labour for glazed coloured ceramic tiles in dado/vertical surface (350mm x250mm x 7mm /450mm x 300mm x7mm), set and jointed in neat cement slurry and pointed in coloured cement to match the surface with and including over 10mm thick rendering in cement mortar (1:4) on fair faces of brick work or concrete surfaces as backing coat complete all as specified and as directed. Note: Design, shade and pattern of fixing of tiles shall be as directed and approved by AGE(I). |
| 19 | Material and labour for non skid coloured ceramic tiles 7 to 8 mm thick area of each tile exc. 0.06 sqm but n.exc 0.11sqm, as in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match with and including over 15mm thick screed bed for laying floor finishes in cement mortar (1:4), complete all as specified and as directed. Note: Design, shade and pattern of fixing of tiles shall be as directed and approved by AGE(I). |
| 20 | M&L for Vitrified Ceramic light shade tiles 10 mm thick (square/ rectangular) polished, area of each tiles not exceeding 0.36 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match, over and including 20 mm thick screed bed or bedding layer of cement mortar (1:6),complete all as specified and directed. Note: Design, shade and pattern of fixing of tiles shall be as directed and approved by AGE(I). |
| 21 | Dismantling stone slabs and tiles laid bedded and pointed in any mortar of any description or thickness in floors, aprons etc., complete all as specified and as directed. |
| 22 | Material and labour for 18 to 20mm thick granite (of any type) work (table rubbed and polished) in steps, jambs, pillars, window-cills, cooking platforms and like cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of pigment to match with shade of granite with and including over screed bed or bedding layer of mortar 20mm thick in cement mortar (1:4), with and including necessary moulding full round, complete all as specified and as directed. Note: Design, shade and pattern of fixing of granite shall be as directed and approved by AGE(I). |
| 23 | Material and labour for machine cut kota stone slab flooring 18 to 20mm thick over cement screed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing over 15 mm thick screed bed or bedding layer in mortar (1:6) , complete all as specified and directed.Note: Design, shade and pattern of fixing of kota stone shall be as directed and approved by AGE(I). |
| 24 | Material and labour for 25mm thick PCC (1:2:4) type B0 (using 12.50 mm graded crushed stone aggregate) finished even and rough in sub floor/levelling course to recieve floor finishes, complete all as specified and directed. Please Enable Macros to View BoQ information |