| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil |
| 2 | Dry stone pitching (any thickness) including cost of stones. On Horizontal |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchorblocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 gradedstone aggregate 20 mm nominal size derived from natural sources) |
| 4 | Centering and shuttering including strutting, propping etc. and removal of formwork for :Foundations, footings, bases for columns |
| 5 | Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, |
| 6 | Providing and fixing of water rubber seal 25mm thickness. |
| 7 | Providing and fixing of winch gear box system with rod and handle complete for hydraulic gate. |
| 8 | Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wirecrates |
| 9 | Making knitted wire crates of approved mesh-size; including weaving, bindingsides and partitions, and binding top after filling; excluding cost of filling, stonesand weaving materials |
| 10 | Supply of crate including carriage complete job |
| 11 | Supply of Lids including carriage complete job |
| 12 | Carriage of material from source to site of work by MT a)Cement an avg lead 5 km |
| 13 | b)Sand an avg lead 12 km |
| 14 | c)Stone agg an avg lead 12 km |
| 15 | d)Solling stone an avg lead 27 km |
| 16 | Carriage of material from source to site of work by Head Load a)Cement an avg lead 200 mtrs |
| 17 | b)Sand an avg lead 200 mtrs |
| 18 | c)Stone agg an avg lead 200 mtrs |
| 19 | d)Solling stone an avg lead 200 mtrs Please Enable Macros to View BoQ information |