| 1 | Providing & fitting fixing Pump Shaft of approved quality. |
| 2 | Providing & fitting fixing C.I coupling complete with nuts & bolts of approved quality. |
| 3 | 190mmφ |
| 4 | Hiring charge of welding set of single phase with operating staff and carrying upto the site of work including loading and unloading (both way) complete as per direction of Engineer-incharge. |
| 5 | Providing & fitting fixing MS hose clamp with nuts & bolts etc.complete at site of work of approved quality150 mm dia |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) |
| 7 | 150mm dia |
| 8 | Supply & fitting fixing ball bearing of approved quality for pump required during overhauling. |
| 9 | 6306 Ball bearing (TATA /SKF |
| 10 | Providing & fitting fixing of GI . Bend/ elbow in the pipeline including testing of joints complete as per CPWD Specification and direction of the Engineer in charge. |
| 11 | 125 mm dia |
| 12 | 150 mm dia |
| 13 | Dismentaling of pump for over hauiling including greasing, gland packing, necessary repairs & reinstallation of the same including trial run for 10 hrs. in two spell complete as per direction of the Engineerin- Charge. |
| 14 | Providing & fitting fixing Shaft sleeve bush of approved quality. |
| 15 | Cast Iron (CI) |
| 16 | Providing & fitting fixing C.I. gland of approved quality |
| 17 | Providing & fitting fixing Gland nut / Stag nut 100 mm long for gland of approved quality. |
| 18 | Providing & fitting fixing C.I tail foot valve spare parts of 125/150mm dia at site of work of approved quality |
| 19 | C.I foot valve weight |
| 20 | C.I foot valve ring |
| 21 | C.I foot valve net |
| 22 | Supplying & fitting fixing kit cut for main & sub-main swich (Male & female) as per direction of the Engineer in Charge. |
| 23 | 63 Amp |
| 24 | 200 Amp |
| 25 | Providing and installation of Copper Strips of 200 Amps busbar by replacing the damaged one with necessary nuts and bolts etc. as per direction of Engg.- In - Charge. |
| 26 | Providing and fitting fixing steel sheet enclosed switch fuse unit (suitable for DIN fuses), triple pole with Neutral Link (TPN), 415/500 Volt, L & T / Havells / BCH make etc. complete as per specification and direction of the Engineer in-charge. |
| 27 | 63 Amp |
| 28 | 200 Amp |
| 29 | Providing and fixing G.I. pipes medium class as per IS : 1239 with latest amendment complete with G.I. fittings including trenching and refilling, cutting and making good the walls etc. complete as per chapter 20 of CPWD specification and direction of the Engineer- in - charge.A. External work |
| 30 | 40 mm dia. nominal bore- For Priming line |
| 31 | Providing & fitting fixing C.I foot valve of heavy duty at site of work of approved quality. |
| 32 | 150 mm dia |
| 33 | Supplying & fitting fixing manually operated oil immerged starter of approved quality.a) 30 Hp Osco/BCH Make |
| 34 | Providing & fixing 200 Amps busbar of size 600× 450×100 mm with 4 nos. copper strip of size 450×40×4 mm of approved quality. |
| 35 | Supplying & fitting fixing of PVC insulated Copper Wire with all electrical equipments including trial run etc. complete (ISI Marked) on the pannel board of approved quality. 7/16 Copper wire |
| 36 | Dismentling of pannel board by disconnection of all electrical equipments & stacking of materials & return the same to Sub-Divisional store as per direction of the engineer in charge. |
| 37 | Labour charge for reinstallation of all electrical equipments ( dismentalled serviceable materials, if any additional/replacement of electrical equipments required will be paid separately) on the panal board including trial run for 10hrs in two spell complete as per direction of the engineer in charge. Please Enable Macros to View BoQ information |