| 1 | Earth filling by lorry including Supplying, (Including Royalty) stacking, ramming, consolidation / rolling with power road Roller 8 tonne, dressing and watering in 20 cm thick layers to achieve proper density and gradient including all leads, lifts and carriages from nearest source to site complete. Payment will be made for Compacted Quantity only |
| 2 | Providing and Laying nominal size Stone Soling (90 mm to 45 mm) including cost of stones and preparation of surface using quarry stones. Complete item including carriage, material and labours. |
| 3 | Providing, Supplying and Spreading of Stone Dust including cost of dust, carriage to site and levelling, compaction, watering, dressing. Complete item including carriage, material and labours. |
| 4 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All Kinds of Soil |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforced cement concrete work in walls, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers. |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto & above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 12 | 12mm Cement plaster of mix: 1: 4 (1 cement : 4 coarse sand) |
| 13 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 15 | Providing and fixing average thickness 12mm thick stone slab tiles in cement mortar 1:4 (1 cement : 4 fine sand) around Columns, Pillars, Slabs etc as required with all contractors material labour, scaffolding, transportation lead & lifts etc (INCLUDING TRANSPORT COMPLETE JOB). |
| 16 | Carriage of Main Gate 2 No Shutters & Wicket Gate 2 No Shutters By Mechanical Transport including loading, unloading and stacking (Steel) From Campus-I IUST to Bemina Campus for an average lead of 36 Kms |
| 17 | Fixing in Place Main Gate (02 No Shutters) & Wicket Gate (02 No Shutters) Including Carrying out all necessary repairs to damages. Complete Job Please Enable Macros to View BoQ information |