| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:25 meter beyond 1 m from cutting edge |
| 2 | Providing and laying of Dry Stone soling hand packed including Ramming etc.complete job. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. |
| 6 | Providing and fixing panelled or panelled and glazed shutters for doors,windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. Second kail wood 30mm |
| 7 | Providing & fixing 4.0 mm thick glass panes (weighing not less than 10 kg/sqm) with all fixtures, all complete |
| 8 | Providing and fixing wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws as per direction of Engineer-in-charge : Second class Kail wood 30mm thick |
| 9 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick.Second Class kail wood |
| 10 | P/F aluminium sliding door bolts ISI marked anodised (anoidic coating not less than AC 10 as per IS: 1868) transparent or dyed to required colour or shade with nuts and screws complete job 300x16 mm |
| 11 | Providing and fixing aluminum handles ISI marked anodized (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour and shade with necessary screws etc. complete. |
| 12 | Providing and fixing aluminum handles ISI marked anodized (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour and shade with necessary screws etc. complete. |
| 13 | Providing and fixing aluminum tower bolts ISI marked anodized (anodiccoating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc.complete : |
| 14 | Providing and fixing aluminum tower bolts ISI marked anodized (anodiccoating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc.complete : |
| 15 | Providing and fixing aluminum casement stays, ISI marked, anodized (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc. complete |
| 16 | Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood). |
| 17 | Painting with synthetic enamel paint of approved brand and manufacture of required color to give an even shade. Two or more coats on new work of approved brand and manufacture. On wood work |
| 18 | 12 mm thick cement plaster of 1:4 mix ( 1 cement: 4 coarse sand) on walls etc , complete job |
| 19 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 1 mm thick, including Applying one coat of water thinnable cement primer of approved brand and manufacture |
| 20 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 grams/ liter of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats |
| 21 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. |
| 22 | Finishing of exterior walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 grams/ liter of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats |
| 23 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded |
| 24 | Providing and fixing precoated colourd galvanized iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side ofthe sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 25 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+/- 5 %) total coated thickness(TCT), Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws or with polymer coated Jor L hooks, bolts and nuts and GI:Seam bolts, and nuts,GI plain and bitumen washers complete: Ridges and Valleys (Upto 60 Cm) wide. |
| 26 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth and curing complete |
| 27 | poviding and fixing 12 am thick preiaminated particle board flatpressed three layer o r grau... ..ood particle board (conforming to I S :12823 Grade-/ type-lI) in panelling fixed in aluminium doors, windowsshutters and partition frames with C.P brass / stainless steel screwsetc. complete as per architectual drawings and directions of engineerincharge. pre-laminated particle board with decorative lamination on both sides incl. frame work |
| 28 | Carriage of Materials from different leads to the site of work by MT:-FINE AGGREGATE Sand FOR 43KMS |
| 29 | Carriage of Materials from different leads to the site of work by MT:-COURSE AGGREGATE (BAJIRI) FOR 32 KMS |
| 30 | Carriage of Materials from different leads to the site of work by Head Load 150 m lead:-Sand |
| 31 | Carriage of Materials from different leads to the site of work by Head Load 150 m lead:-Bajree |
| 32 | Carriage of Materials from different leads to the site of work by Head Load 150 m lead:-Steel |
| 33 | Carriage of Materials from different leads to the site of work by Head Load 150 m lead:-Cement |
| 34 | Carriage of Materials from different leads to the site of work by Head Load 150 m lead:-Soling Please Enable Macros to View BoQ information |