| 1 | Earth work excavuhon by mechinal means (Hydraulic excavator) manual over area (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavalted earth lead upto 50 m and for all lift, as directed by engineer- D.S.R 2.6 |
| 2 | Proving and laying in position cement concrete of specified grade excluding the cost of centering and shutting - all work up to plinth level: 1:4:8 (1 cement:4 coarse sand (zone-III) derived from natural D.S.R 4.1.8 |
| 3 | Brick work with common burnt clay F.P.S. (non moduler) brick of class designation 7.5 in foundation and plinth in: cement mortar 1:6 (1 cement:6 corse sand) for foundation D.S.R 6.1.2 |
| 4 | 12mm Thick Plaster 1:4 cement & C.sand labour materials T&P etc all Complete D.S.R 13.4.1 |
| 5 | P/L position cement concrete 1:2:4 cement, C sand & stone aggreate 20mm nominal including supply of materials labour and T&P etc required for proper completcion of the work and curing complete also including cost of formwork in foudation and flooor all complete D.S.R 4.1.3 |
| 6 | Reinfored cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string course, fillcts, columns, pillars, piers, abutments, post and struts etc. above plint level up to floor five level, execluding cost of centering, shuttering, finishing and reinforcement:5.2.2 1:1.5:3 (1 cement :135 coarse sand (zone-III) derived form natural sources :3 grated stone aggregated 20mm nominal size derived froim natural sources) D.S.R 5.2.2 slab |
| 7 | Steel reinforcement for R.C.C work including straightenning, cutting bending, placing in position and binding all complate upto plint level. 5.22.6 thermo-mechanically treated bars of grade fe-500D or more D.S.R 5.22.6 |
| 8 | centering & shutterring in form work etc all complete. slab D.S.R 5.9.3 |
| 9 | Earth work cutting & filling including 3.00km cartage all complete |
| 10 | Construction of granular sub-base by providing well granded material granding 1, sprending in uniform layers with moter grander on prepaired surface, mixing by mix in place method with rotavoter at OMC, and compacting with smooth wheel roller to achieve the esired density, complete as per technical clause |
| 11 | rubber moulded reflective Zig-Zag 80mm providing and laying of interlocking concrete block pavment having thickness 80mm as per drawing and technical specification clause 1504 S.I No 6.7 total area |
| 12 | Supply of RCC hume pipe NP-3 including collars/spigot jointed with stiff of cement in tranportion of 1:2 (ement & c.sand) nincluding testing of ioint all complete 450mm dia D.S.R 1728 |
| 13 | Transporter charge for hume pipe manufacture to at site all complete. |
| 14 | Laying & fixing of R.C.C hume pipe NP-3 class 2.50m Labour only all complete |
| 15 | S/F sign board at site all comp Please Enable Macros to View BoQ information |