| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto1.5 m. All kinds of soil. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 3 | Excavating holes more than 0.10 cum UP to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto1.5 m. All kinds of soil. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 7 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1: 4 (1 cement : 4 coarse sand) :a) 40 mm thick |
| 8 | Stone work (machine cut edges) for wall lining etc. (veneer work) upto 10 metre height, backing filled with a grout of average 12 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) : Red sand stone - exposed face fine dressed with rough backing. 40 mm thick |
| 9 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 10 | Providing & Installing the Mini Play House of make ARIHANT /KOMPAN/ LANDSCAPE STRUCTURES /OK PLAY/LEO/ KAALIA. of size 6.0x1.80mtr with Slide. Main Frame made of Round 80 NB Pipe Having min \\"B\\" class G.J. pipe. All the pipes should be ISI Marked (as per the IS 1239/2004) & of reputed brand. Ensuring the strength. Durability, stability &m long life to the kids structure with safety as paramount Deck having 1035mm x750mm with collar of 65mm size made of perforated sheet. Hydraulic Precision punched holes made of min 10mm NB with sheet thickness of approx. 2.5mm. Components:- FRP (Fiber Reinforced Plastic) Main Sunshine Line designer Roof having min 2-4 layers (approx.4mm thickness) with bright colours being UV resistant ladder main frame made of round pipe 25mm NB pipe & Ladder rungs made of 15mm N.B. pipe having width of 400min a 70mm(approx.). All the pipes should be ISI marked (as per the IS1239/2004) & of reputed brand. Tree climber made of main frame pipe of 25mm NB round pipe & rungs made of 20min NB round pipe. Allthe pipes should ben IS! marked(as per the IS 1239/2004) & of reputed brand Spring coil climber: made of main frame pipe of 25mm NB round pipe & springs made of 20mm NB round pipe. All the pipes should be ISI marked(as per the IS. 1239/2004) & of reputed brand.: A Rotomolded plastic LLDPE made Line panel with UV stabilized color fading resistant. Having size of 1035mm x 750mm & thickness of 70mm heavy & strong for long term durability & great aesthetic look 1035mm(L)x750mm(W) having wall thickness 70m. & finish, Safety panel fitted on M.S round pipe 20mm N.B. with size of Slide having height of 1220mm approx.. & length approx.. 2mtr made of metallic GI sheet of high strength having width of 400mm mounted on M.S angle support of 4-0x40x4mm & 5nos angle supports & 20mm. N.B. round pipe hand rail, The ladder step of metallic slide should made of M.3 rectangular pipe of 70x23mm in minimum thickness of 2mm with vertical hand rift support of size 20mm N.B GI p:pe with other necessary supporting pipes. The complete structure mini play house should be powder coated with minimum powder coating thickness of 60-60 microns. Safety panel/top canopy should be also attached with help of colorful nylon clamps. Accessories: Nut bolts- All approved Gl nut bolts Galvanized Iron with High tensile Strength. Kid capacity 2-8 Nos. All Complete as per drawings attached/as per the direction of engineer-in Charge including maintenance cost for 1st Year. |
| 11 | Providing & Installing the Double Arch Swing of make ARIHANT/KOMPAN/ LAND SCAPE STRUCTURES/ PLAY/LEO/KAALIA of size 3.10x1.50mtr. Main Frame:- Main Cross Bar made of round 75mm 0.D. pipe and legs made of 50mm N.B. pipe Legs- Arch shaped bended (Must be min in GI \\"B\\" class pipe). T pipe will be required for the Cross bar. All the pipes should be ISI marked( as per the IS 1239/2004) & of reputed brand, Ensuring the Strength, durability, stability & long life to the Kids. Structure with safety as paramount. Seats- Belt Type Seats made of Synthetic Rubberized material/Fiber reinforced fabric materials of Virgin Reinforced material & also duly with UV resistant colors, Chain Made of approx.. 6mm thick G,I chain with rubberized coating of with 3 mm minimum thickness, Chrome plated supporting hook for belts Hooks for convenience & height adjustment/Seat Movement, self- lubricated council type bush baring clamps provided with rubber coated chain to be hang the complete belt assembly. The complete structure double arc swing should be powder coated with minimum powder coating thickness of 60-80 microns, Accessories: Nut bolts to be used All approved GI nut bolts Galvanized Iron with High tensile Strength. Kid capacity 2-4 Nos. All Complete as per drawings attached/as per the direction of Engineer-in Charge including maintenance cost for 1st Year |
| 12 | providing & Installing the SEA SAW DOUBLE of make ARIHANT /KOMPAN/ LAND SCAPE STRUCTURES /OK PLAY/LEO/ KAALIA of size 2.0x2.50mtr.Main Frame: made of see saw made of 50mm NB pipe with planks made of 40mm NB pipe and supports made of 20mm N.B. pipe, all the G.I pipes should be \\"B\\" class & 1Si marked (as per the IS 1239/2004)& of reputed brand make & Ensuring the Strength, durability, stability & long life to the kids structure with safety as paramount. Seats - Seat Made of FRP (Fibre Reinforced Plastic), duly UV resistant colors, all chemicals in the FRP material should be best quality, the Fibre Mat of 450GSM to be used for strength & stability with supporting frame. FRP Seat S?ze approx.) 10\\"(L) x8\\" (W) with back rest. The complete structure see saw double should be powder coated with minimum powder coating thickness of 60-80 microns accessories: 1lut bolts- All approved GI nut bolts Galvanized Iron with High tensile Strength Kid capacity -4 nos. Complete as per drawings attached. All Complete as per drawings attached/as per the direction of Engineer-in Charge including maintenance cost for 1st Year |
| 13 | providing & Installing the SINGLE WAVE CLIMBER of make ARIHANT /KOMPAN/ LAND SCAPE STRUCTURES/OK PLAY/LEO/KAALIA of size 1.75x0.80mtr. Main Frame: Main Frame of single wave climber pipe made of round 32mm NB pipe (Must be min in GI \\"B\\" class pipe) and rungs made of 20mm N.B. Pipe - 'U' Shaped bended(will thickness approx. min1.5mm - 2.2.mm only), All the pipes should be ISI marked(as per the IS 1239/2004 & of reputed brand & Ensuring the Strength, durability, stability & long life to the kids structure with safety as paramount. The complete structure single wave climber should be powder coated with minimum powder coating thickness of 60-80 microns Accessories: Nut bolts- All approved GI nut bolts Galvanised Iron with High tensile Strength Kid Capacity - 2 to 4 Nos. All Complete asper drawings attached/as per the direction of Engineer-in Charge including maintenance cost for 1st Year |
| 14 | providing & Installing the TODDLER SWING of make ARIHANT/KOMPAN /LAND SCAPE STRUCTURES/OK PLAY/LEO/KAALLA of size 2.40x1.50mtr. Main Frame:- Main Cross Bar of toddler swing made of round 65mm NB pipe and Supporting T Bar made of 50mm N.B. Pipe (main cross bar &T supporting Bar should be in GI \\"B\\". class pipe All the Pipes should be ISI Marked( as per the IS 1239/2004) & of reputed brand make with good wall thickness. Ensuring the Strength, durability, stability & long life to the kids structure with safety as paramount. Seats- Bucket Type Seat Made of Synthetic Rubberized material or Virgin Plastic material & also duly with UV resistant colors, Chain Made of approx. 6mm thick G.I chain with rubberized coating of with 3 mm minimum thickness, Chorme plated supporting hook for belts Hooks for convenience & height adjustment/ Seat Movement, self-lubricated council type bush baring clamps provided with rubber coated chain Toddler Swing to hang the complete bucket assembly. The complete structure should be powder coated with minimum powder coating thickness of 60-80 microns. Accessories: Nut bolts to be used all approved GI nut bolts Galvanised Iron with high tensil strength. Kid capacity 2 & recommended age group- 2 to 8 yrs. All complete as per drawings attached/as per the direction of engineer-in-charge including maintenance cost for 1st year. |
| 15 | SCHEDULE -'B' |
| 16 | Regular maintenance for three years (including free maintenance for 1 year) of all the newly installed children play equipment in 09 Nos. location in DDA parks as per schedule B consists of the following :-a) Replacement/repair of parts of equipment in case of theft/ vandalism.b) Check and set right/replacement for worn bearings, misaligned moving points, adjust/tighten loose parts, covers, seats, foundation and flooring.c) Tightening nuts/bolts/screws i/c welding of various parts/joints of equipment wherever required.d) Calibration of Instrument every three months.e) Priming coat & painting coat, if required.f) Lubrication/oiling every 15 days.g) Inspect and adjustment of drive, timing and running belts.h) Replacement of damaged parts & rectification of any other defects observed as per the direction of the Engineer-in-charge except : i. Due to Force majeure or ii. Abnormally bad weather, serious loss or damage by fire or iii. Damage due to the act of god or iv. Any other cause which is in the absolute discretion of the Engineer-in-charge is beyond the contractor's control. |
| 17 | Annual maintenance of equipments to be carried out by the agency free of cost for First year, after the date of completion of the work as per schedule-A, all complete as per the direction of Engineer-in-Charge. a.) First Year (Free of Cost). |
| 18 | b.) At the end of 2nd year from the date of Completion of the Work (All 2 set equipment) |
| 19 | c.) At the end of 3rd year from the date of Completion of the Work (All 2 set equipment) |
| 20 | Total= 2273944.55 |
| 21 | Total of Non DSR Items(item no 10 to 15) =1123600.00 |
| 22 | Total DSR item (item no 1 to 9) =1150344.55 |
| 23 | Total i/c C.F. @0.973 on DSR items =1119285.25 |
| 24 | Add C.I. @3% on DSR Items |
| 25 | Total 1152863.80 |
| 26 | Total of Dsr& Non Dsr Items =2276463.80 |
| 27 | Terms & Conditions:1. The agency shall regularly inspect & upkeep the equipment in working condition as required at all times during the contract period.2. The complaint as and when it occurred shall be attended to within 3 days during 3 years maintenance period, failing which a penalty of @ Rs. 2000.00 per day shall be imposed and shall be recovered.3. If the equipment (or its parts) is stolen due to negligence in maintenance by the agency, the agency must replace the stolen equipment/parts. No payment will be made to the agency for this replacement (i.e., the agency bears the full cost of replacement).4. The performance guarantee of 5% submitted by the agency shall be released after recording of final completion certificate (i.e. after completion of 3-year maintenance period).5. The provisional completion shall be recorded by the competent authority separately for the installation of children play equipment. However, the final completion certificate shall be recorded by the competent authority after successful completion of 3-year maintenance period.6. The security deposit withheld @2.5% of the gross amount of each Running Account (R/A) Bill/ Final Bill till the sum deducted will amount to security deposit of 2.5% of the tendered amount of the work shall be released after recording of final completion certificate by the Competent Authority (i.e. after completion of 3-year maintenance period).7. An additional amount equal to 40% of the installation cost of equipment (i.e. new equipment from S.No. 10 to 14 ) shall be withheld apart from security deposit from each Running Account (R/A) bill, against warranty. This amount shall be proportionately released year wise after successful completion of each year of the 3-year maintenance period (including both the free and paid maintenance periods). Please Enable Macros to View BoQ information |