| 1 | Material |
| 2 | Earth wire clamp for SP-55 with N&B |
| 3 | PP & clamp with N&B ST Pole SP-55 |
| 4 | Stay Clamp for SP-55 with nut & bolt |
| 5 | 11 kv IPC for covered to covered conductor |
| 6 | 11 kv IPC for covered to Bare conductor |
| 7 | 11 kv mid span jointing kit |
| 8 | IPC with Al bail for earthing |
| 9 | 11 KV Suspension Ties/Cable Ties |
| 10 | 11 KV Composite Poly. Disc Insulator 70 KN |
| 11 | 11 KV Polymer Pin Insulator with Pin-D |
| 12 | Double Tension Disc fitting 70KN-D |
| 13 | Supply af 11 KV AAAC, AL 59 (99 sqmm Covered Conductor) |
| 14 | 11 KV Tension Clamp with Bail & IPC |
| 15 | Labour |
| 16 | Chemical earthing |
| 17 | Fabrication of steel |
| 18 | Excavation of Pit for stay set |
| 19 | Erection of 11 kv stay set |
| 20 | Grouting of stay set |
| 21 | Excavation of Pit for Pole |
| 22 | Erection of single SP-55 Pole |
| 23 | Grouting of Pole |
| 24 | Muffing of Pole |
| 25 | Dismantling of 11 kv line (Weasel) |
| 26 | Dismantling of 11 kv line (Rabbit) |
| 27 | Painting of SP-55 Pole |
| 28 | Erection of Bracket in 11 KV line |
| 29 | Construction and Installation of Danger Board/Number Plate |
| 30 | Cartage SP-55 pole 0-20 km |
| 31 | Cartage of petty material 0-20 km |
| 32 | Head load cartage SP-55 Pole (0-1Km) |
| 33 | Head load cartage Petty material (0-1Km) |
| 34 | Straightening of Tilted pole |
| 35 | Fixing of IPC with AL bail for earthing |
| 36 | Jumpering of D/P TPMO, Fuse set and T/f |
| 37 | Jumper Section pole |
| 38 | Fixing of 11kv 90kn tension clamp |
| 39 | Fixing of 11 kv mid span jointing kit |
| 40 | Fixing of 11 kv IPC for covered - covered |
| 41 | Fixing of 11 kv IPC for covered - bare |
| 42 | Fixing of Disc Insulator for AAAC conductor |
| 43 | Laying spreading, Stringing AAAC conductor |
| 44 | 11 kv cable ties for Pin Insulator |
| 45 | Fixing of 11 KV Pin Insulator for AAAC Covered Conductor |
| 46 | Back carriage of scrap material Fixing of Aluminium Lugs Please Enable Macros to View BoQ information |