|
| 1 | Providing dredging , dumping, survey plants and equipment for “soil” dredging in the areas given below for three years i.e. during 2026-2027, 2027-2028 and 2028-2029. Dredging all “soil” to depths and side slopes indicated in drawings and specifications and dispose off the dredged soil in the assigned dumping areas including all leads and lifts to lines and levels, pre, intermediate, post dredge surveys, all as specified and as directed by the Engineer in the following areas. Removing dredging, dumping & survey plants and equipments provided to carry out the work. Note: Mobilisation, predredging survey, dredging, transportation of dredged spoil to designated dumping ground, dumping, post dredge survey and handing over full area each year will be one occasion, subject to the clause mentioned in the tender for dredging at BPX and BPS. |
| 2 | BPX, BPS and East Mole |
| 3 | Indira Dock Harbour Wall Channel and Berths 18 to 22 |
| 4 | Tug Berth and Launch Berth |
| 5 | Prince's and Victoria Dock Channel |
| 6 | Ferry Wharf Berths, Approaches and Ferry Terminal Jetty |
| 7 | Dredger Berth, Barge Berth 1 and Approaches |
| 8 | Channel opposite Jawahar Dweep, Emergency Anchorage and Berths. |
| 9 | Apollo Bunder (Gateway of India steps) |
| 10 | OCT Berths & Channel |
| 11 | Providing dredging, dumping and survey plant and equipment for “soil” dredging in the following areas of Mumbai Port. Dredging all “soil” to depths as indicated in drawings and specifications and dispose off the dredged soil in the assigned dumping area including all leads and lifts to lines and levels, pre, intermediate, post dredge surveys, all as specified and as directed by the Engineer. Removing dredging, dumping & survey plants and equipments provided to carry out the work. |
| 12 | Indira Dock Approach Channel |
| 13 | Indira Dock Entrance Channel |
| 14 | NEW Pirpau Channel , TC & berth |
| 15 | SCB Channel, TC & berth |
| 16 | Deep Water Anchorages ( DA1 to DA3) |
| 17 | JD5 Berth & part of TC |
| 18 | Indira Dock Basin |
| 19 | Bunder Areas( Haji, Hay, Coal,Lakdi Bunder) |
| 20 | 3rd chemical berth & Turning Circle |
| 21 | OPP Berth & Channel |
| 22 | JD4 berth |
| 23 | Deep Water Anchorage at J3 |
| 24 | Fish Jetty at Malet Bandar |
| 25 | Widening portion of Harbour wall channel |
| 26 | Marina Bay near P&V channel |
| 27 | Landing steps at Jawahar Dweep Island |
| 28 | TOTAL PART II ( in Words) Please Enable Macros to View BoQ information |