| 1 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B |
| 2 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 3 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 4 | Filling with excavated earth including all labour charges as per standard specification. |
| 5 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items |
| 6 | a) Centering for Below ground level |
| 7 | b) Centering for column |
| 8 | c) Slab Centering |
| 9 | Supplying and Fabrication Steel rainforcement including all cost and conveyance etc complete |
| 10 | RCC 1:1.5:3 mix using 20mm HBG ISS Metal including all cost and conveyance etc complete |
| 11 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23x11x7 cm for the following including curing etc., complete complying with standard specifications |
| 12 | Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and charges for mixing , laying ,and finishing etc complete |
| 13 | Finshing the top of roof with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete |
| 14 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 15 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 16 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work |
| 17 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification |
| 18 | Painting two coats over New Iron works such as doors windos, etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard Spe |
| 19 | Supply and fixing of Rolling shutters Including cost and conveyance etc complete |
| 20 | Supply and fixing of N type ventilators Including cost and conveyance etc complete |
| 21 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |