| 1 | ESTIMATE |
| 2 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 3 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete |
| 4 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 5 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 6 | 14.75A:Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) |
| 7 | OD9974/2026-2027:Man Mazdoor for cleaning the premises |
| 8 | OD9978/2026-2027:Engaging fitter for repairing aluminium doors and windows. |
| 9 | OD15169/2026-2027:Engaging plumber for repairing drainage,rainwater gutter,pipe lines,water supply and sanitary line clearings etc. |
| 10 | OD9981/2026-2027:Hire charges for woodcutting. |
| 11 | OD10434/2026-2027:Re fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete departmental tile |
| 12 | OD10459/2026-2027:Re laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete . department tile |
| 13 | 13.29.3:18 mm thick plain cement mortar band in cement mortar 1:4 ( 1 cement : 4 fine sand):Raised Band |
| 14 | OD9975/2026-2027:Engaging carpenter for repairing wooden roof members, roof tiles, window and door repairing etc |
| 15 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 16 | 12.51.1:Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screwscomplete :Ridges plain (500-600 mm) |
| 17 | OD10368/2026-2027:Fixing the departmental precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) .The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces and including cutting to size and shape wherever required. |
| 18 | OD9979/2026-2027:Cleaning septic tank at any distance and any depth including removal the waste away from site including conveyance, removal and refixing of top coverslab all labour charges,materials charges etc. |
| 19 | 50.18.9.9.2:Providing and fixing PVC pipes includes joints of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in CHarge. 110 mm dia 4 Kg/cm2 Please Enable Macros to View BoQ information |