| 1 | Sub Head and Item of Work |
| 2 | Dismantling the cement concrete steps of key monastery and Mane Lakhang Floor area, Parikrama, Front area by mechanically/manually means including disposal of material within 50 meters as per directed by site in-charge (including GST) |
| 3 | Dismantling of R.R. Stone Masonry of wall, parapet wall by mechanically/manually means including disposal of material within 50 meters as per directed by site in-charge (including GST) |
| 4 | Taking out the old pulverized old mud plaster and un even mud filling up to the depth of 20 cm from the roof , in-front , gallery , Parikrama area and Mane-Lakhang very carefully to avoid any damage to the underneath including placing the same within the complex for re use.(including GST) |
| 5 | Providing and laying cement concrete 1:3:6 (1cement:3c.Sand: 6 Stone aggregate 20mm size) of the Mane lakhang floor area. In front area, steps etc complete. (including GST) |
| 6 | Construction of C.R stone masonry of main entrance steps and wall with lime mortar 1:1:1(1 Lime:1 Brick Surkhi: 1 C. Sand) and fine dressed C.R Stone by cutting and chiselling in required etc complete. (including GST) |
| 7 | Procurement of readymade wooden pillar of railing of sal (hard) wood of size 1x0.115x0.115 as per the design and pattern of the already fixed wooden railing in main steps of the Key Moanstery complex etc complete (including GST) |
| 8 | Fixing in position the wooden pillar including providing wooden angular carved support in bottom of pillar with proper nails and screw. The pillar wil be fixed with 16 mm x 0.20 long bolt in concrete block of 0.15x0.15x0.15 and nut in pillar to provide adequate support and strength to the pillar (including GST) |
| 9 | Providing and fixing in position the horizontal and vertical member of the rail 0.08x0.05 thick in between the pillar including making necessary grooves in pillars and bar for proper fixing using adhesive nails etc. (including GST) |
| 10 | Provisions for mud brick parapet wall of Mane Lakhang with sun brunt mud brick with mud mortar, Bhusa fine earth cow dung and lime putty etc... as original pattern. (including GST) |
| 11 | Providing and applying of 25 mm thick mud plaster mixed with Bhusa, fine earth, cow dung and lime putty etc. Over mud brick masonry of walls inner etc complete (including GST) |
| 12 | Applying mud punning (lepai work) with fine good local earth (yellow) mixed with lime and chopped jute etc. Finishing fine as per original pattern etc complete (including GST) |
| 13 | Recess pointing with lime mortar 1:1:1 (1 Lime ; 1Surkhi; 1 C.Sand) mixed with stone coloring pigment of steps wall etc complete (including GST) |
| 14 | Providing and laying Deodar wooden batten/scantling size 0.075 x 0.10 for fixing the planks flooring at 0.45 x0.45 center to center fixing with nails clamps etc complete of Mane Lakhang and complex, including applying wood preservative. (With 100% new materials) all complete. (including GST) |
| 15 | Providing and fixing 50mm thick Deodar wooden planks for flooring over the battens/ scantling with proper tongue and grooves and fixing properly with screw nuts as per pattern applied include termite and wood preservative replant coating etc complete. (including GST) |
| 16 | Provision for cleaning the Kadi and tulu stick ceiling of Mane Lakhang and relaying the tulu stick and jungle grass / leaf and laying Dry and wet mud 6 inch thick laying geo-Text tilw sheet etc all complete. Toal Quantity 50.40 sqm) (including GST) |
| 17 | Provision for decorative traditional parapet stpma/twigs/panma with wooden batten and planks etc complete. (including GST) wood/Kadi |
| 18 | Parapet stepma/twigs/Panma |
| 19 | Provision for erecting of scaffolding and dismantling of tubular scaffolding required for documentation dismantling and resembling work including labours T&P etc, complete. (including GST) |
| 20 | Provision for procurement of essential articles required for execution of work (including GST) Annexure-VI Please Enable Macros to View BoQ information |