|
| 1 | M&L for cutting and trimming of grass, weeds, shrubs and small vegetation upto specified height using manual tools or bush cutters, including labour, equipment and safety measures including collection, raking and gathering of cut grass and vegetaion debris from the work area and disposing outside MOD area complete all as specified and directed.NOTE: This item shall be executed at every 3 months interval. |
| 2 | Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings and removal from site complete all as specified and as directed. |
| 3 | Dismantling wrought iron or mild steel work of any description in rafters, purlins and wind ties wtc and removal from site complete all as specified and directed.NOTE: If the planned MS structure, truss, etc is different from the existing structure, proper measurement of the existing structure to be demolished, shall be recorded in MB. |
| 4 | Demolition Brick work built in Cement Mortar and in any Position including all Quoins, Arches and Pillars, etc., and removal of debris outside AF land complete all as specified and directed. |
| 5 | Dismantling fencing wire mesh, chain link fence, etc any type incl cover fillets, nuts & bolts and MS bars and removal from site complete all as specified and directed. |
| 6 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion alongwith PCC foundation and removal from site complete all as specified and directed.NOTE: Earthwork shall be measured seperately. |
| 7 | Surface excavation n.exc 30cm deep and averaging 15cm deep and getting out in soft/ loose soil complete all as specified and directed. |
| 8 | Excavating in trenches, in soft/loose soil, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out complete all as specified and as directed. |
| 9 | -ditto- but for Excavating in trenches, in hard/dense soil, |
| 10 | Returning filling including spreading, levelling, watering and well ramming in layers n exc. 25cm complete all as specified and as directed. |
| 11 | Removing excavated material n exc 50m and depositing where directed at a level n exc 1.5m above the starting point. complete all as specified and directed. |
| 12 | Excavating in post holes (or similar holes) each n exc 0.5 Cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm watering, and removing surplus soil to a distance n exc 50 m and making good surface complete all as specified and directed. |
| 13 | M&L cement concrete 1:2:4 type B2 (using 40mm graded stone aggregate) as in filling and mass concrete complete all as specified and directed. |
| 14 | M&L for Rolled mild steel in plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes without any attachment Gde Fe 410W complete all as specified and directed. Please Enable Macros to View BoQ information |
| 15 | M&L for Rolled mild steel in plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes without any attachment Gde Fe 410W complete all as specified and directed. Please Enable Macros to View BoQ information |