|
| 1 | Excavation in foundation treanches etc. in all classification of soil such as pick ,spade,Jumper blasting ,soft rock,hard rock etc. lift up to 1.50 mtr. Stacking the excavated soil not more than returning the stacked soil in 15 cm layers when required in to plinth side of foundation etc. |
| 2 | Wet Well sinking gravel including all pumping soring etc. |
| 3 | From spring level to 3 mtrs. |
| 4 | From spring level to 2 mtrs. |
| 5 | Steel work in single sections including cutting, hoisting fixing in position and applying a priming coat of red lead paint in beams joints channels angles, tees flats with connecting plates or angles cleats as in main and corss beams hip and jack rafters purlins connected to common rafter and the like within all leads and lifts as per direction of Engineer-in-charge. |
| 6 | Lowering of Well Curb complete in all respect i.e.Quantity as per same item No. 3 |
| 7 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shutterting, strutting and propping etc with wooden battens and ballies, height of propping and centring below supporting floor to ciling not exceeding 4 mtr and removal of the same for insitu reinforced concrete a plain concrete work:- |
| 8 | In vertical surface such as wall (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like within all leads and lifts as per direcstion of E-in-charge |
| 9 | In beam ,cantilever,piller and lintle etc. Braces of tanks |
| 10 | Providing and laying cement concrete work 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- |
| 11 | Coluomn ,Pillar Post the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge. |
| 12 | Providing laying No Fine Cement Concrete 1:4(1 Cement 4 Stone Aggregate 40 mm nominal size and curing complete excluding the cost of from work. |
| 13 | Providing and laying tor steel reinforcement for RCC.work including bending,binding and placing in position complete upto any floor within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge. |
| 14 | Stone soling properly hand packed filing interstices consolidating with spals and murrum or earth etc 100mm spread thickness (finihed work includng material and labour) complete in all respect within all leads and lifts as per direction of Engineer- in-charge. Test run. 8 Hours continueously for 7 days Please Enable Macros to View BoQ information |