|
| 1 | Appendix 1 - Protection Work of Outer bunds |
| 2 | OD43444/2025-2026:Earthwork in excavation in or under water by mechanical means(Hydraulic excavator) /manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plain) including disposal of excavated earth, lead up to 50m and lift upto 1.5m,disposed earth to be leveled and neatly dressed. All kinds of soil. certificate:- Certified that the observed data is prepared by taking the rate and labour charges as per schedule of rates and has been prepared as per the actual observation at site |
| 3 | OD43443/2025-2026:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. |
| 4 | OD43445/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble ( without bond stone)including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 5 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 6 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 7 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 9 | OD4206/2026-2027:Supply of A3 NETWORK Multifunction Colour Printer, Copy/Print Speed: Minimum 24 PPM or higher (A4), Paper Size: A4 & A3, RAM: 01 GB, Resolution (Copier): 600X600 dpi or above, Connectivity: LAN, WIFI &USB, Paper Tray Capacity: Min 100 sheet or higher, Paper Feed Trays: Minimum 2 Trays and a Bye-pass Tray, Paper Sorting for Multiple Copies, Warranty: 5 year comprehensive onsite warranty, Features: ADF and Auto Duplex, OS Support: Ubuntu 18.04 and higher & Windows. |
| 10 | Appendix 2- Clay Bund Formation |
| 11 | OD43428/2025-2026:Earthwork in rough excavation banking excavated earth in layers not exceeding 20 cm in depth,breaking clods and dressing up in embackment for roads ,flood banks,marginal banks and guid banks with all leads and lifts in allkinds of soil(based on DSR 2.2.1-2.4-2.5+20% )under excavation in stiff kayal clay. Please Enable Macros to View BoQ information |