| 1 | (A) SUPPLY |
| 2 | PG CLAMP ACSR Moose to Moose Conductor |
| 3 | Spacer for Twin Moose Conductor 02 Bolts, 250 mm spacing made of Alumunium alloy LM- 6 Complete with nut, bolts & washers confirming to BIS:5561 |
| 4 | Spacer for twin Panther conductor 02 Bolts, 100 mm spacing made of alumnium alloy LM-6 Complete with nuts, bolts & washers confirming to BIS: 5561 |
| 5 | Bolted type Single Tension fitting for \\" Twin Moose \\" conductor with turn Buckle for 132 KV Main Bus Bar suitable for 70 KN Disc insulator string with 02 No. Tension Clamps made of Al. alloy LM-6 Yoke Plate, D-Shackle, D-Socket etc made from forges steel etc. |
| 6 | Bolted type Single Tension fitting for \\" Twin Moose \\" conductor without turn Buckle for 132 KV Main Bus Bar suitable for 70 KN Disc insulator string with 02 No. Tension Clamps made of Al. alloy LM-6 Yoke Plate, D-Shackle, D-Socket etc made from forges steel etc. |
| 7 | Bolted type Single Suspension fitting for \\" Twin Moose \\" conductor for 132 KV Main Bus Bar suitable for 70 KN Disc insulator string with 02 No. Tension Clamps made of Al. alloy LM-6 Yoke Plate, D-Shackle, D-Socket etc made from forges steel etc. |
| 8 | 132 KV Isolator clamp duly made of Alumunium alloy (LM-6) suitable for Twin ACSR Panther conductor complete with bolts, nuts & washer as per sample |
| 9 | 132 KV Isolator clamp duly made of Alumunium alloy (LM-6) suitable for ACSR Moose conductor complete with bolts, nuts & washer as per sample |
| 10 | 132 kV CT Clamp duly made of alumunium Alloy (LM-6) suitable for ACSR Moose conductor complete with bolts, nut & washers stud dia as per sample. |
| 11 | (B) Work |
| 12 | Opening of existing jumpers of Twin/Single ACSR Panther /Moose Conductor between main bus to 6 No Bus isolator 03 No. PT (01 job for each jumper) |
| 13 | De Stringing & Dismanting of exising 132 KV Main bus of Single ACSR Moose conductor after opening of Disc Insulator String & Tension Fitting from Gantry lowering the bus bar conductors including shifting of the old conductor from the switchyard to substation store and stacking placing of same at suitable place at the stores (01 Job for each phase of each section of the Bus bar) |
| 14 | Laying & Re-Stringing of 132 KV Main bus bar of twin ACSR Moose Conductors including hoisting of Disc insulator string & Tension fitting etc and through run of twin moose conductor of 132 kV Main Bus by placing supension fitting with insulator strings between adjacent bus section including shifting of the conduuctors/Materials from store to switchyard (01 job for each phase of each section of bus bar |
| 15 | fixing of spacer between twin ACSR Moose of above newly laid 132 KV Main bus bar |
| 16 | Jumperig with twin ACSR Panther/Single moose conductor between newly laid 132 KV Main bus bar to 03 No. bus isolator of t/F bay ,03 No. PT(01 job for each jumper), 2 no BI of Line Bai,01 No. BI of TBC bay Please Enable Macros to View BoQ information |