| 1 | Cutting & uprooting of Sarkanda, or Arrows or Jhundas including disposal as directed by Engineer-in-charge |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50 m. and lift up to 1.5m. in dry or moist including dressing of excavated area , dewatering wherever required complete in all respect. Hard soil mixed with kankar / boulder morrum . |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50 m. and lift up to 1.5m. in dry or moist including dressing of excavated area , dewatering wherever required complete in all respect. Soft / disintegrated rock |
| 4 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto( c )20 mm |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20 mm |
| 6 | Side shuttering including propping etc. Complete (to achieve finish F2 ) for Retaining wall up stream or down-stream slope facings of dams and open faces of construction joints etc |
| 7 | Supplying of M. S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS : 1786-1985) |
| 8 | Re-handing of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-watering wherever required and all applicable taxes and levies etc. complete in all respect Mixed strata muck |
| 9 | Dryboulderfillinginrequiredprofilewithfillingofvoidsetc.completeincludingall lead & lifts, and well finished surface |
| 10 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type gate with frame consisting of skin plate, sealing frame, stiffeners, horizontal and vertical girders, guide, stainless steel flat/Brass flat, rivets, wedges, lifting rods etc., with all accessories as per relevant IS code including frame & gate complete set for Canal Cross, Escape, Head regulator /Tank head regulator including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, seal fixing, tools and tackles etc., applying two coat of zinc rich epoxy primer to give dry film thickness of 70±5 microns and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150±5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials |
| 11 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels,beams,chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. Please Enable Macros to View BoQ information |